FORM 1 (See Regulation 3) ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) Date: 08-04-2025 To, The Dream India Builders, plot bearing cts no 1A(Pt) of village Oshiwara,Jogeshwari West Mumbai 400102 Subject: Certificate of Percentage of Completion of Construction Work of Dream Aspire having Maha RERA Registration Number P51800053836 being developed by Dream India Builders. Sir, I Abuzar Ismail Plasterwala have undertaken assignment as Architect/Licensed Surveyor of certifying Percentage of Completion of Construction Work Dream India Builders having Maha RERA Registration Number P51800053836 (only applicable after project registration) being developed by Dream India Builders. Based on Site Inspection. with respect to Layout / each of the Building/Wing of the aforesaid Real Estate Project. I certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activities of the entire phase is detailed in Table B. Table A Lavout/Building/Wing Number _____ (to be prepared separately for each Layout /Building /Wing of the Project) Percentage of Actual work Sr. Tasks /Activity done (as on the No (2) date of (1) certificate) (3) 1 Excavation 100 2 Basements (if any) 100 3 Podiums (if any) 0 4 Plinth 100 5 Stilt Floor 100 6 Slabs of Super Structure 6 OUT OF 24 7 Internal walls, Internal Plaster, Floorings, Doors and 0 Windows within Flats/Premises 8 Sanitary Fittings within the Flat/Premises 0 9 Staircases, Lifts Wells and Lobbies at each Floor level 0 Overhead and Underground Water Tanks Page | 1 10 The external plumbing and external plaster, elevation, 0 completion of terraces with waterproofing of the Building/Wing, 11 Installation of lifts, water pumps, Fire Fighting Fittings 0 and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, Compliance to conditions of environment /CRZ NOC, finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of sale. Any other activities TABLE-B Common Areas (Internal & External Development Works) in Respect of the Registered Phase/project number Percentage of Actual Sr. Proposed Work done Common areas and Details No. (Yes/No) (as on the Facilities (2) (5) (1) (3) date of certificate) (4) 1. Internal Roads & 0 Footpaths 2. Water Supply 0 3. Sewerage (chamber, 0 lines, Septic Tank, STP) 4. Storm Water Drains 0 5. Landscaping & Tree 0 Planting 6. Street Lighting 0 7. Community Buildings 0 8. Treatment and disposal 0 of sewage and sullage water 9. Solid Waste 0 management & Disposal 10. Water conservation/ 0 Rain water harvesting 11. Energy management 0 12. Fire protection and fire 0 safety requirements 13. Electrical meter room, 0 sub-station receiving station Page | 2 Percentage of Actual Sr. Proposed Work done Common areas and Details No. (Yes/No) (as on the Facilities (2) (5) (1) (3) date of certificate) (4) 14. Others (option to add 0 more) Signature & Name of Architect Abuzar Ismail Plasterwala License No. CA/2018/99003 Plasterwala Digitally signed by Plasterwala Abujar Ismail Abujar Ismail Date: 2025.04.08 16:26:39 +05'30' Agreed and Accepted by: Page | 3