XAR WORKSHOP LLP Architecture + Design Address: B-8/G1A, Khira Nagar, Santacruz (West), Mumbai - 400054 Phone: +91 9967402128 FORM 1 (See Regulation 3) ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) Date: 14/05/2024 To, The Dream India Builders, plot bearing cts no.1A (Pt) of village `Oshiwara, Jogeshwari West Mumbai 400102. Subject: Certificate of Percentage of Completion of Construction Work of Dream Aspire having Maha RERA Registration Number P51800053836 being developed by Dream India Builders. Sir, I/We Abuzar Ismail Plasterwala have undertaken assignment as Architect/Licensed Surveyor of certifying Percentage of Completion of Construction Work having Maha RERA Registration Number P51800053836 being developed by Dream India Builders. Based on Site Inspection. with respect to Layout / each of the Building/Wing of the aforesaid Real Estate Project. I certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project under Maha RERA is as per Table A herein below. The percentage of the work executed with respect to each of the activities of the entire phase is detailed in Table B. Table A Lavout/Building/Wing Number (to be prepared separately for each Layout /Building /Wing of the Project) Percentage of Actual work Sr. Tasks /Activity done (as on the No (2) date of (1) certificate) (3) 1 Excavation 50% 2 Basements (if any) 50% 3 Podiums (if any) 0 4 Plinth 50% 5 Stilt Floor 0 6 Slabs of Super Structure 0 Page | 1 7 Internal walls, Internal Plaster, Floorings, Doors and 00 Windows within Flats/Premises 8 Sanitary Fittings within the Flat/Premises 00 9 Staircases, Lifts Wells and Lobbies at each Floor level 00% Overhead and Underground Water Tanks 10 The external plumbing and external plaster, elevation, 00 completion of terraces with waterproofing of the Building/Wing, 11 Installation of lifts, water pumps, Fire Fighting Fittings 00 and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of sale. Any other activities TABLE-B Common Areas (Internal & External Development Works) in Respect of the Registered Phase/project number Percentage of Actual Sr. Proposed Work done Common areas and Details No. (Yes/No) (as on the Facilities (2) (5) (1) (3) date of certificate) (4) 1. Internal Roads & 0 Footpaths 2. Water Supply 00 3. Sewerage (chamber, 00 lines, Septic Tank, STP) 4. Storm Water Drains 0 5. Landscaping & Tree 00 Planting 6. Street Lighting 00 7. Community Buildings 0 8. Treatment and disposal Not applicable of sewage and sullage water 9. Solid Waste 00 management & Disposal 10. Water conservation/ 00 Rain water harvesting 11. Energy management 00 Page | 2 Percentage of Actual Sr. Proposed Work done Common areas and Details No. (Yes/No) (as on the Facilities (2) (5) (1) (3) date of certificate) (4) 12. Fire protection and fire 00 safety requirements 13. Electrical meter room, Temporary shifted sub-station receiving station 14. Others (option to add 00 more) Signature & Name of L.S./Architect ARCHITECT ABUZAR PLASTERWALA License No. CA/2018/99003 Agreed and Accepted by: Plasterwala Digitally signed by Plasterwala Abujar Ismail Abujar Ismail Date: 2024.05.14 17:28:08 +05'30' Signature of Promoter Name: ARCHITECT ABUZAR PLASTERWALA Date: 14/05/2024 Page | 3