(Type here) Xan AR WORKSHOP LLP (Architecture + Interior) FORM1 (See Regulation 3) ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) Date:_31-12-2023 To, The Dream India Builders, plot bearing cts no.1A (Pt) of village `Oshiwara, Jogeshwari West Mumbai 400102. Subject: Certificate of Percentage of Completion of Construction Work of Dream Aspire having Maha RERA Registration Number P51800053836 being developed by Dream India Builders. Sir, I/We Abuzar Ismail Plasterwala have undertaken assignment as Architect/Licensed Surveyor of certifying Percentage of Completion of Construction Work having Maha RERA Registration Number P51800053836 being developed by Dream India Builders. Based on Site Inspection. with respect to Layout / each of the Building/Wing of the aforesaid Real Estate Project. I certifythat as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project under Maha RERA is as per Table Aherein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Table A Lavout/Rehab Building/Wing Number (to be prepared separately for each Layout /Building /Wing of the Project) Percentage Sr. of Actual work Tasks / Activity done (as on the No (2) date of certificate) (1) (3) 1 Excavation 50 PERCENT 2 Basements (if any) 50 PERCENT 3 Podiums (if any) 0 4 Plinth 50 PERCENT 5 Stilt Floor 6 Slabs of Super Structure 7 Internal walls, Internal Plaster, Floorings, Doors and Windows within Flats/Premises Sanitary Fittings within the Flat/Premises XAR WORIS LP Architat Nagar, 4-400054. S ac.UZ Phone: +$ "il.qo Email: abuz b: www.nalti'l4p.c (Type here) Xan AR WORKSHOP LLP (Architecture + Interior) 0 9 Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks 10 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing, 0 11 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, Compliance to conditions of environment /CRZ NOC, finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of sale. Any other activities TABLE-B Common Areas (Internal &External Development Works) in Respect of the Registered Phase/proiect number Percentage of Actual Work Sr. Common areas and Proposed done (as on Details No. (Yes/No) the date of (5) Facilities (2) (3) (1) certificate) (4) 1. Internal Roads & Footpaths 2 Water Supply 0 3 Sewerage (chamber, lines, Septic Tank, STP) 4. Storm Water Drains 5. Landscaping & Tree Planting 6 Street Lighting 7 Community Buildings 8. Treatment and disposal of sewage and sullage water 9. Solid Waste management & Disposal 10. Water Conservation/ Rain water harvesting 0 11. Energy management 12. Fire protection and fire safety requirements XAR WORKSHOP LLP Architecture+Design SantaciuzB-3/41A, Khira Nagar, (1Wes), Mumbai-4000$4. Address: Phonc: +91 9567402128 Email: abuza:.apw@gmail.com Web: www.xaworkshop.cO::1 (Type here] AR WORKSHOP LLP (Architecture + Interior) Percentage of Actual Work Sr. Common areas and Proposed done (as on Details No. (Yes/ No) the date of (5) Facilities (2) (1) (3) certificate) (4) 13. Electrical meter room, sub station receiving station 14. Others (option to add more) 0 Signature & Name (|N BLOCK LETTERS) of L.S./Architect License No. COA Reg No. CA/2018/99003 Agreed and accepted by; R WORKSHOP LLP chitecture+Design Khira Nagar, tdress: B-8/41A, Sintacruz (\West),Mumbai-400054. hone: +91 9967402128 "ail: abuzar.apw@gmai.com Signature of Promoter Vveb: www.xwprkshop.coit Name: PLASTERWALA ABUJAR ISMAILA N Date: 31/12/2023