Tdrtrq rrdf{qfq e &rF{firq qrf{fiq MAHARASHTRA H@USING AND AREA DEVELOPMENT AUTH@Ril]IV MHADA ruifailg Permission cell, Greater Mumbai /IVTHADA !1i:':*i::g:li-'igA{l::it1:g,_yl4DArayoutsconsritutedasper government regularion no. TpB43 15/167/cR-sltzo6ruD-r1 dt.23 Mt, 201g.) Layout Name: New subh".!@on (w), in p/s ward. To, Executive Engineer. Goregaon Division, M.H. & A.D. Board. Grihnirman Bhavan, Kalanagar, Bandra (East), Mumbai- 400051. Sub: Intimation of Approval (I.o.A.) for Proposed development of buildings with 'EWS'type tenements consisting of Wing nos. A to G comprising of stilt+23 floors in plot-A and wing nos. A to D comprising of stilt+23 floors in plot-B on land bearing c.T.S.No.-50A @t.),2 (pt), of village pahadi Goregaon, Goregaon (west), Mumbai for M.H. & A.D. Board in piS ward. Reft 1' Application from Executive Engineer-Goregaon Division, MHADB under No. EEIGD/DE-II/MB / | g06/ 20 19, dated: 23 / 02 / 20 I 9 . 2. Earlier approval of IoA for zeroFSI U/no: MITEE (Bp) cell /Gl,{I/ MIIADA- 57 / | 8t /20 t9 ; dt 1 6 / 01 /20 19. -1. Eorlicr Apprulul ul'Fli'th cc lbr zvru rsl U/no: MH/EE (Bp) c elllGIWMFIADA - s 7 / t B r / 20 r 9 dt: | 3 / 03 / 20 | g ; . 4. Layoutwas approved under no.- s.A.p ./L.A.c.(pA) /MHADNT /rg, dt.09/04/2019. Sir, with reference to your application dated: 23/02/201g for development permission and grant of Commencement Certificate under section 44 & 69 of Maharashtra Regional Town Planning Act, 1966 to carry out development and o^lo?:.o.:T|:t:" uil* 45 of Maharashtra Regional and rown planning :":1i"1 Act, 7966 to erect residential building I i.e. For Building no.- 03, stilt+23 floors. tltz 'IdhqfuT TiFr, oq;sryq, EFi (f,d), tid yoo oqe. G.riha Nirman Bhavan,Kalanagar, Bandra (East), Mumbai4OO 051. {tt{fi qESo qooo Phone;66405000. 6wi: o??-?qqq?oqr Fax No. : 022-26592O58 Website : www.mhada.maharashtra.gov.in wing nos.- A, B, c, D, E, F, G in plot no.- 'A' for EWS type tenements, For Building no.- 02, stilt+23 floors, wing nos.-A, B, c, D in plot no.- .B' for EWS type tenements :11 wings, total:1947 tenements] on land bearing C.T.S.No.-50A (pt.), 2 (pt.), of village pahadi Goregaon, Goregaon (west), Mumbai for M-H. & A.D. Board in P/S ward. I have to informed you that the plans submitted by you for the construction of building or Intimation of granted subject to compliance mentio Cell/GMAvIHAD A-57 / 1 8t I 2019, dtd: | 6/ MHIEE (BP) CellicMAdHADA-s7tr8r inform you that I may approve the buil executed, and I therefore hereby intimate as amended upto date, my approval by reasons thereof sqqi-dt to fulfillment of conditions mentioned as under: - Al TION BE ILED BEFORE STAR WORI(: - O1)That the low-lying plot will be filled up to a red I of at least27.55 M. Town 08)That the qualified & Lisc. Plumber will be appointed for carrying out internal house Drainage works. 09)That a doctor for regular check-up of labours working on site shall be appointed. 10) That private pest control agency shall be appointed for pest control during course of construction. 2/12 ll)That the anti-termite treatment shall be provided at site during the execution of work and conditions of circular u/no. AMC/WSlHl9346, dt.2910312010 shall be complied with. I'2!'I'hat the work shall be commenced only alter the necessary treatment at construction site to prevent epidemics like Dengue, Malaria etc. is done from Insecticide Officer and provision for inspection of water tanks by proving safe and stable ladder, etc. and requirements as communicate by the Insecticide Offic ll be made as and when required by Insecticide Officer. 13)That the work shall be carried out und qualified supervisor and his name and before starting the work. L4)That the Soil Investigation of site shall investigation consultant and accordin superstructure shall be carried out. l5)That the structural design and calcul seismic and wind forces as per relevant got carried out and accordingly, the 16) L7) 18) cted in consultation with, HE/PCO. shall be complied with before starting the er shall be laid, the drainage work shall be ive Fngineer (Sewerage Project) Planning shall be submitted. 2l)That the remarks from Suptd. of Garden shall be submiued before commencement of work. 22) That the capacity of overhead tank shall be provided as per P' form issued by department of Hydraulic Engineer and Structural design to that effect shall be done. 23lThat the necessary remarks for construction of SWD shall be submitted from EE (SWD) WS in R/N ward. 3/t2 24)Thatthe demarcation for plot boundary from DILR /CTS office shall be submitted. 25)That the Janata Insurance Policy or Polity to cover the compensation claims arising out of Workmen's Compensation Act, 1923 shall be taken and a copy of the same will be submitted before asking c.c. and renewed during the construction of work and owner/developer should submit revalidate d Janata Insurance policy from time to time. 26)That the NOC from Electric Supply supply shall be obtained and the provis of DCPR -2034 & if necessary, provis requirement of electric supply company 27)The date of commencement of the work shail be intimated be the work. 28)That the records of quality of work, verification report, etc. ntained or site till completion of the entire work. 29)That the work shall be carried out between 6.00 a.m. t .m. as per circular u/no. CHE/DP /7749lcEN dt.07 .06.20 16. 3O)That the work will be carried out stri with the D.C. Regulations in force. 31) That the construction activity for work out by employing modern techniques ing and carrying out construction will be e for consequence of settlement of the floor that the stability of the adjoining structure ion of wurk. Municipal roads and necessary clearance arges must be obtained before submittine Bl oNs BE DW ORK EYO TCIJII\ Itl: -\- - 01)That this office shall be intimated in prescribed proforma for checking the opens spaces and building dimensions as soon as the work up to plinth is completed. o2)That the plinth stability certificate from Structural Ergg. Shall be submitted. 03)All the payments as intimated by Building Proposal celliMHADA shall be paid and any other outstandingthat may be levied by any other Govt. Dept. if any shall be borne by the Society / Applicant. 4/tz O4)That the amended Remarks of concerned authorities / empanelled consultants for the approved plan, if differing from the plans submitted for remarks, shall be submitted for: a) S.W.D., b) Roads, c) Sewerage, d) Water Works, e) Tree authority, f) Hydraulic Engineer, g) PCO, h) NOC liom h,lectric Supply Company. O5)That the Material testing report for construction materials used at site shall be taken as per required frequency. O6)Architect, Structural consultant shall structure, super structure & OHT. cl 01) That the surounding open space, pa paced with concrete, asphalt, sloped an 02) That the dust bin will be provided and will be provided. 03) That the carriage entrance across road s B.C.C. 04) That the pockets, trenches, ducts as per requi shall be provided. 05) That the footpaths, roads, etc. damaged during struction shall be kept repaired and in usable conditions and reinstate before completion of work. 's specialized inthis field as sanctioned by shall be provided. esting and bore well as per the design the field shall be made to the satisfaction of e in prescribed format as per DCPR-2034 r completion of work on site one of which d at the time of intimating the date of from tlie ..gistered Structural Engineer for to this office before asking for occupation permission/BCC. 1l) That the smoke test and ponding test for the terrace & toilet water proofing shall be carried out and certificate from L.P. to that effect shall be submitted. s/12 12) That Structural Engineer's final Stability Certificate along with up to date License copy and R.C.C. design structural drawing mounted on canvas plan shall be submitted. 13) That site Supervisor certificate for quality of work and completion of the work shall be submiued in prescribed format. 14) That terraces, sanitary blocks, nahanis in kitchen will be made water proof and same will be provided by method of poundi proof and smoke test will be done in pre 15) That the drainage completion certificate 16) That the sewerage lines shall be provide completion certificate to that effect shall 17) The SWD completion certificate shal (SWD) WS. ,\(,.,, provided. 26) That the letter from MHADA appointing registered structural engineer shall be submitted and the structural designs and calculations considering seismic forces for proposed work shall be submitted through him along with the supervision memo before starting the work and work shall be got done as per said design. 6/72 27) That the proposed Development Plan/ Municipal Road/Roads & Regular Line/ Lines shall be got demarcated at site jointly with the Municipal Survey Branch/Executive Engineer (Development Plan), Executive Engineer (Traffic & Co-ordination) & District lnspector of Land Roads. 28) That adequate storm water drains shall be provided in the sub-divided plots/layout atea at the owner/owners cost including provision for admitting storm water from the surrounding locality as per S.W.D.(Planning). 29) That the surrounding open spaces, p paved with concrete, asphalt, sloped an 30) That the adequate arrangement shall Plotsilayout area at the owner/owner V.P/CEO, MHADA. 31) That the formation levels of the roads construction in regard to the same as sewers etc. shall be got previously app w.s. 32) 33) 34) ivision and that there is material variation then the same will be got approved before ed plots shall be duly got demarcated by s, necessary charges got effected on the to this office for record as also necessary permission obtained for non- agricultural use of the land as required under section 65 of the LandRevenue Code. 36) That the area under widening of 18.30 M wide road shall be merged with road and the same shall be handed over to MCGM free of cost and free of all encumbrances. 7/72 Dl coNprTr TO BE CO Ol)That certificate under section 270-A of the Bombay Municipal corporation Act. Shall be obtained from H.E.'s department regarding adequacy of water supply. VP & CEOA4FIADA has appointed Shri. Dinesh D. Mahajan, Executive Engineer to exercise his powers and function of the planning Arrhority under section 45 of the said Act. This Intimation of Approval (I.O.A.) is gr Stilt+23 floors, wing nos.- A, B, C, D, E, F, G in tenements, For Building no._ 02, Stilt+23 floors, wing 'B' for EWS type tenements :ll wings, total :194 C.T.S.No.-50A (pt.), 2 (pt.), of village pahadi G Mumbai for M.H. & A.D. Board in p/S ward. One copy of approvable plans is sent herewith. , @r'"Jh"hajan) tive Engineer. (B.p.) Ceil ter Mumbai /IVIHADA Copy to: - l) The Hon'ble Chief O d necessary action please' 2) Deputychief Enginee 3) The Architect/ ion and necessary action please. opy with ,112n 16q.*\"\ 'Nitin A. Patrl tsldg.no. -24/A,6rt Floor. Maitrii Co-op Hsg. :E. Highway, Bimbi tmbisar naga\ Goregaon (E), Mumbai- 400065. 5) The ; MSD, 1OrH floor, Bandra (p), Vtumbai. Water Works "P/S" Ward, MCGM. ) a\ / ssessor & Collector "p/S" Ward, MCGM. Executive Engineer. (B.p.) Cell Greater Mumbai /UIHADA 8/tz SPECIAL INSTRUCTIONS I. THIS INTIMATION GIVES NO RIGHT TO BUILD UPON GROUND WHICH IS NOT YOUR PROPERTY. 2. "Every person who shall erect as new domestic building shall cause the same to be built so that every part of the plinth shall be a. Not less than, 2 feet (60 cms. at the nearest point at whic connected with the sewer tha street. b. Not less than 2 feet (60 c within 5 feet (160 cms.) of su c. Not less than92 ft. (Town Ha 3. Your attention is invited to the provi " (d.trrted by the Assessor and Collector's Department. 4. on is fuither drawn to the provision about the necessity of :l" , occupation certificate with a view to enable the V.P.& C.E.O.i /r.. , o inspect your premises and to grant a permission before occupation and to levy penalty for non-compliance if necessary. 5. Proposed date of commencement of work should be communicated. 6. One more copy of the block plan should be submiued for the Collector, Mumbai Suburbs District. Attention is drawn to the notes accompanying this Intimation of approval s/12 NOTES 1.The work should not be started unless objections are complied with. 2.A certifred set of latest approved plans shall be displayed on site at the time of commencement the work and during the progress of the construction work. 3.Temporary permission on payment of deposit should be obtained any shed to house and store tbr construction pu{pose, Residence of workmen shall not be allowed on site. The temporary s shall be demolished before submiss certificate signed by Architect sub certifrcate. 4. Temporary sanitary accommodation drainage arangement should be p work. 5.Water connection for constructional taken without approval from con Board. 6. The owners shall intimate the Hyd 7. started before the same is shown to this stant Engineer concerned and m regarding correctness of the open spaces & dimensions. 9.The application for sewer street connections, if necessary, should be made simultaneously with commencement of the work as the Municipal Corporation will require time to consider alternative site to avoid the excavation of the road a footpath. to/72 10. All the terms and condition of the approved layout /sub-division under No. of should be adhered to and complied with. 1 1. Your proposal for layoutl Building /subdivision/amalgamation of above plot is hereby approved subject to the terms and conditions as have been agreed by you and you will please make it clear that in case of breach of any of the terms and conditions, the permission granted will be revoked. 12. The compound wall or fencing should be constructed clear of the tgad widening line with foundation belo without obstructing flow of rain water the work to prove the owner's holding 13. No work should be started unless the existins st to be demolished are demolished. 14. The Intimation of Approval is giv you to proceeds further with the Certificate from the Competent proceeding with the work either the work or your starting the work 15. 16. er appurtenances in the building should the laying of drains inside the building. ied out in strict accordance with the or fountain shall be dug or constructed iting of the VP/CEO A4HADA. 20. All gully traps and open channel drains shall be provided with right fiuing mosquito proof made of wrought iron plates or hinges. The manholes of all cisterns shall be covered with a properly fiuing mosquito proof hinged cast iron cap over in one piece, with locking arrangement provided with a bolt and huge screwed on highly serving the purpose of lock and the warning 7!/72 pipes of the rabbet pretested with screw or dome shape pieces (like a garden mari rose) with copper pipes with perfections each not exceedingl.5 mm in diameter. The cistern shall be made easily, safely and permanently accessible be providing a firmly fixed iron ladder, the upper ends of the ladder should be earmarked and extended 40 cms above the top where they are to be fixed as its lower ends in cement concrete blocks. 21. No broken bottles should be fixed refers only to broken bottles to not t compound wall. 22. Louvers should be provided as requ Arches should be provided over Do should be laid as require under Sect should be plastered inside and outsid Executive Engineer. (B.p.) Celt Greater Mumbai A{HADA t2/72