P-8881/2021/(260/A AND OTHER)/K/E WARD/MOGRA 1/7 J. O. AD .S. N 59 THIS PLAN IS DIGITALLY SIGNED AND PHYSICAL SIGH IS NOT REQUIRED C. T J. O.2 APPROVED SUBJECT TO CONDITIONS MENTIONED IN THIS OFFICE LETTER UNDER ±0.00 MT. GR. LVL. AD .S. N 261 C.T PERMISSIBLE & PROPOSED LOS. AREA STATEMENT P-8881/2021/(260 A And Other)/K/E Ward/MOGRA Dated : 08.10.2024 SUCTION TANK WITH 2.000 OF 1) TOTAL AREA OF PLOT AS PER PRC. C.T.S. NO. 260A, 262, 262/1 TO 6 = 1468.80 SQ.MT. FORM- I TOTAL AREA ( IN SQ.MT ) SUBMERSIBLE PUMP C.T.S. NO. 262 A 2) LESS AREA UNDER ENCROACHMENT(SUB PLOT A) = 5.66 SQ.MT. I AREA STATEMENT. 53 LESS AREA UNDER ENCROACHMENT(SUB PLOT B) = 0.94 SQ.MT. O. 2 1 (i) Area of entire plot exlcuding road already handed over to MCGM. as per PRC. 1468.80 J. TOTAL AREA UNDER ENCROACHMENT = 6.60 SQ.MT. AD .S. N SECTION THRO. SUCTION TANK 0.978 2.690 4 0.386 2.890 3) (ii) Area of plot in the name of Rose Blossom Chs. Ltd. as per PRC. 959.02 EXTG. ROAD 1 2.4 BALANCE AREA ( 1 - 2) = 1462.20 SQ.MT. C.T 68 0.641 1.88 18 4.545 3 0.20 SCALE - 1:100 0 3 9 10 1. 95 8 2.4 16 4) TOTAL LOS AREA REQ. 1462.20 X 15% = 219.03 SQ.MT = 219.33 SQ.MT. (iii) Less area under encroachment 5.66 83 14 4.374 4.454 4.481 4.20 5) PROPORTIONATE LOS FOR ROSE BLOSSOM CHS = 143.00 SQ.MT. 4.8 4.5 10 29 4.056 3.59 3 13 72 (iv) Balance Area for redevelopment of Rose Blossom Chs. Ltd. ( ii -iii ) 953.36 3.584 3.586 4.137 4 .1 5 2 12 4. 99 3.77 8 3.512 0.737 1 1. 2 1.010 2a 0.5 5 0.970 7 8 1.18 0 2. 3 20 1.59 6) PROPORTIONATE LOS FOR VENUS APARTMENT = 76.33 SQ.MT. (v) Area of plot for the Venus Apartment. ( i - iii - iv) 509.78 18 19 04 6 1.147 1 1 11 15 17 91 1.5 16 3.3 2. 62 3 18 1. 34 3 0.128 0.362 5.500 60% REQ. LOS ON GROUND FLOOR :- 219.33 X 0.60 = 131.60 SQ.MT a) Area of Reservation in Plot ------ 2 C.T.S. NO. 260 B ON 4.8 50% OF 60% LOS ON MOTHER EARTH :- 131.60 X 0.50 = 65.80 SQ.MT NIL 1.5 71 13 1.7 17 41 b) Area of Road Set-Back LINE DIAG.FOR LOS- PAVED AREA CALC. 1.500 COMPOUND WALL 3 LOS PROPOSED ON GROUND FLOOR = 219.64 SQ.MT 5.960 LOS PROPOSED ON MOTHER EARTH c) Area of D.P. Road NIL 4.6 98 LOS - A SUB PLOT-A 0.767 2.015 4 (LOS-A(pt) 80.21 SQ.MT +LOS- B 76.59 SQ.MT ) = 156.80 SQ.MT (71.39 %) ±0.00 MT. GR. LVL. 2 Deductions For O.2 SCALE 1:200 J. 2.5 ON 67 PAVED LOS PROPOSED LOS A(pt.) = 62.84 SQ.MT (28.61%) OF J. O.263 AD T.S. N STONE MASONRY WORK 0.9 66 5 1.50016 8.189 A For Reservation / Road Area 0 .7 45 = C. PROPOSED LOS (A)AREA = (62.84 + 80.21 ) = 143.05 SQ.MT(71.39%) 1:3:6 P. C. C. OF 79 61.5 7) 143.05 SQ.MT. a) Road Set-Back Area To Be Handed Over ( 100% ) ( Reg. No. 16 ) NIL AD .S. N 7 0.92 2.38 2.13 2 9 2.78 1 3 6.86 8) PROPOSED LOS (B)AREA = 76.59 SQ.MT(34.87%) = 76.59 SQ.MT. 6 56 SECTION THRO. 73 0.248 9 7.2 11 b) Proposed D.P. Road To Be Handed Over ( 100% ) ( Reg. No. 16 ) NIL C.T 3 TOTAL LOS AREA PROPOSED 9) = 219.64 SQ.MT. 64 COMPOUND WALL 10 5.524 40 c) (i) Reservation Area To Be Handed Over ( 100% ) ( Reg. No. 17 ) NIL O.2 0.9 OF J. 1.421 SCALE - 1:100 37 AD .S. N 12 6.11 4 .5 15 TOTAL LOS AREA FOR SUB PLOT A & B (ii) Reservation Area To Be Handed Over As Per AR ( 100% ) ( Reg. No. 17 ) NIL 7 7 M. R. PLAN C.T 1.71 SUB PLOT A PAVED AREA = 62.84 AREA SQ.MT. LOS AREA A (iii) Net Area Of Plot ( 1 Minus 2 ) 953.36 2.15 5.983 143.05 SQ.MT. B For Amenity Area SACLE : 1:500 5 UNPAVED AREA 80.21 SQ.MT. 13 14 SUB PLOT B UNPAVED AREA = 76.59 SQ.MT. LOS AREA B a) Area Of Amenity Plot/Plots To Be Handed Over As Per DCR. 14 (A) NIL 2.42 76.59 SQ.MT. TOTAL PLOT AREA = 219.64 SQ.MT. NIL b) Area Of Amenity Plot/Plots To Be Handed Over As Per DCR. 14 (B) 5 12 6.2 38 c) Area Of Amenity Plot/Plots To Be Handed Over As Per DCR. 35 ( Abeyance ) NIL 3.0 18 19 1 .597 3.7 25 0 68 9 10.2 Deductions For Existing BUA To Be Retained If Any/ Land NIL 17 . 47 13 LINE DIAG.FOR LOS- UNPAVED AREA CALC. ADJ. WEST ADJ. C.T.S. NO. 261 C 3.5 2 11.4 Component Of Existing BUA/ Existing BUA As Per Reg. Under AREA UNDER ENCROACHMENT 20 MR PLAN LINE 317 .004 2.6 1 C.T.S. NO.259 AREA = 5.66 SQ.MT. 9.13 IN ADVERSE POSSESSION LOS - A SUB PLOT-A (Z) AREA = 4.04 SQ.MT 35 17 44 3 51 IN ADVERSE POSSESSION T2 T3 T4 T5 T7 T8 T9 T10 T13 T14 AREA IN ADVERSE POSSESSION 41 .29 14. SCALE 1:200 AREA = 1.35 SQ.MT (X) GATE T1 2.876 +0.00 LVL. 3.104 T6 3.700 4.493 T11 T12 4.543 4.263 4.343 +0.00 LVL. 4.343 4.723 Which The Development Was Allowed. 1.3 1. 3 +0.00 LVL. 0 00 77 1.0 4 5.534 16 8 1 2.847 3 Total Deductions: [ {2(A)+2(B)} + 2(C) As And When Applicable. NIL 0.233 0.372 26 T29 C.T.S. BOUNDARY 46 ADJ. 15 .0 5 38.566 +0.00 LVL. C.T.S. NO.253 TO MCGM. 51 12.00 MT WIDE EXISTING 2.7 .22 12 38.650 PHYSICAL SURVEY BOUNDARY 4 ROAD SET BACK AREA ALREADY HANDED OVER 93 14 0 6 7 38.963 5.084 PROPOSED BLDG. GRD. + 9TH UPPER FLOORS, BLDG. HT. = 30.75 MT. +0.00 LVL. T15 Balance Area Of Plot ( 2(A) (c) (iii) Minus 3 ) 953.36 2.985 48 8 .24 996 4 3.337 0.32 7 8 22 21. 7.10 Plot Area Under Development After Areas To Be Handed Over To 90 43 13 27.7 NIL 12 3.3 .88 0 1.350 1 T16 5 5.873 13 40 .4 0.36 9 13.2 15 16 3.766 T17 MCGM/Appropriate Authority As Per Sr. No.4 Above 5 3.6 NORTH 38 41 44 0.96 T18 1.21 11 2.7 2 48 37.398 4.585 3.61 58 8 7 20.0 T19 6 SOUTH .51 13.037 Zonal ( Basic ) FSI ( 0.50 Or 0.75 Or 1 Or 1.33 ) 1.00 EARLIER AND IN THE NAME OF MCGM. .368 3.903 0 10 34.4 2 35. 2 6. 10 14 5.44 7 5.49 2 34.2 9 42 0.430 3.843 12 24 T28 T20 1.696 3 698 50 2 9 11 17 4.406 Built Up Area As Per Zonal ( Basic ) FSI ( 4*6 ) ( In Case Of Mill NATWAR NAGAR ROAD NO. 5 +0.00 LVL. 9 3.259 4.574 7 953.36 UGT 33.9 3.681 2.000 4.346 45 5 GATE 3.321 8.7 95 3 .77 3.605 +0.00 LVL. T24 +0.00 LVL. 6.670 2.856 Land Permissible BUA Kept in Abeyance ) 1.016 10 23 T25 33.27 T27 T26 T23 T22 4.3 24 8 2.142 33.0842 PAVED R.G.-A AREA PROPOSED - 62.84 SQ.MT 5.500 7 4 7.1 EXIST PHY PLOT BOUNDARY EAST UNDER GROUND WATER 5.033 1.675 24.648 1 8.69 1 5.7 39 TANK FLUSHED TO FINISHED GROUND LVL. TOP SLAB TO BE DESIGNED TO TAKE ' T21 8 Built Up Equal To Area Of Land Handed Over As Per Reg. 30(A) 1.828 A' - 'A' CLASS LOADING. 4.323 6 4 18 7.569 GATE C.T.S NO. 0.233 SPACE FOR FUTURE PROPOSED ROTARY PARKING TOWER 5.500 5.960 EXISTING COMPOUND WALL & STRUCTURES ALREADY DEMOLISHED 7.4360 0.6 (i) As Per 2(A) And 2(B) Except 2(A)(c) (ii) Above With In Cap Of "Admissible 3.34 L/V 23.509 19 1 22 89 260/B L/V L/V NIL 0 8.2 L/V D/W 5 20 5.98 3 L/V EXISTING VENUS APT 1.560 ROTARY PARKING TOWER 1.506 TDR " As Column 6 Of Table-12 On Remaining / Balance Plot.) 21 6.591 3.629 TOTAL R.G.-A AREA PROPOSED - 143.05 SQ.MT GR + 4TH FLOOR D/W UNPAVED R.G.-A AREA PROPOSED - 80.21 SQ.MT 59 PROP. COMPOUND WALL 2.0 HT. 15.10M. (APPROX) 5 2.42 L/V - H/5 = 3.02 M. S APT C.T.S NO. D/W - 3.60M. VENU 260/A SITE U/R (1) EXISTING COMPOUND WALL & (ii) In Case Of 2(A)(c) (ii) Permissible Over And Above Permissible BUA On . NIL STRUCTURES ALREADY DEMOLISHED Remaining / Balance Plot LINE DIAG. FOR ROSE BLOSSOM PLOT AREA CALC. IN ADVERSE POSSESSION AREA = 5.35 SQ.MT AREA UNDER ENCROACHMENT AREA = 0.84 SQ.MT (2) (3) (4) Incentive additional BUA = 15% x 957.03 sq.mt. = 143.55 sq.mt OR LINE DIAG. FOR ENTIRE PLOT AREA CALC. SANITARY STATEMENT FOR COMMERCIAL ADJ. PROP. COMP. WALL SCALE 1:500 EZ .1 C.T.S. NO.263 W.T ADJ. 9 270.00 C.T.S. NO.264 SCALE 1:500 GROUND FLOOR AREA UNDER ENCROACHMENT AREA = 0.10 SQ.MT 27 x 10 sq.mt. = 270.00 sq.mt … whichever is More OCCUPANCY LOAD FOR COMMERCIAL = 33.30 PERSONS \ 100 SQ. MTS. 9.15 IN ADVERSE POSSESSION AREA = 2.00 SQ.MT Built Up Area Due To “Additional FSI On Payment Of Premium” As Per 10 476.68 CARPET AREA OF COMMERCIAL = 49.09 SQ. MTS. ISMALIA 18.30 BLOCK PLAN Table No.12 Of Reg. No.30(A) On Remaining / Balance Plot. (953.36 X 0.50) EP - KE 75 TOTAL OCCUPANTS = 16.36 PERSONS SCALE 1:500 11 B.U.A. Due To Admissible “TDR”As Per Table No. 12 Of Reg. No.30(A) 397.35 50 % FOR MALE = 8.18 PERSONS 50 % FOR FEMALE = 8.18 PERSONS And 32 On Remaining / Balance Plot. 953.36 x 0.70 = 667.35 - 270.00 = 397.35 W.C. REQD. @ 1 FOR 25 PERSONS = 01 Nos. W.C. REQD. @ 1 FOR 15 PERSONS= 01 Nos. W.C. PROPOSED = 01 Nos. W.C. PROPOSED = 01 Nos. 12.0 0M WS 23 K / E RESIDENTIAL TENEMENT SLUM TDR = 667.35 X 20% = 134.92 SQ.MT Gen. TDR = {667.35 - 134.92 - 270.00} = 262.43 SQ.MT TW TOILET PROVIDED = 02 Nos. IDE NA STATEMENT 12 Permissible B.U.A.{As The Case May Be With / Without BUA As Per 2(c)} 2097.39 MOGRA 9.15 TW AR WING-A CAR PARKING AREA STATEMENT (AS PER 2034 DCPR) 13 Proposed BUA {As The Case May Be With / Without BUA As Per 2(c)} 2097.39 R NA GA RESI. UNIT SHOP UNIT NURSING 14 TDR Generated If Any As Per Regulation 30(A) And 32. NIL SANITARY STATEMENT FOR COMMERCIAL R RO AD HOME TDR STATEMENT CARPET AREA NO. OF PARKING PERMISSIBLE REQUIRED PARKING 15 (A) Permissible Fungible Compensatory Built Up Area ( 2097.39 x 35% ) 734.09 1ST FLOOR NO .0 5 FLOOR EXISTING SALE SALE SALE NO. OF FLAT FLAT AS PER D.C. RULE PARK. / FLAT REQUIRED (i) Residential Rehab Component 334.96 OCCUPANCY LOAD FOR COMMERCIAL = 33.30 PERSONS \ 100 SQ. MTS. TDR 70% OF PLOT AREA RR 2.1 ( Existing Area 957.03 x 35% = 334.96) CARPET AREA OF COMMERCIAL = 152.85 SQ. MTS. GROUND 05 -- 953.36 X 70% = 667.35 = 667.35 SQ.MT. UP TO 45 SQ.MT 09 NOS. 1 PARKING FOR 4 TENAMENT 09/4 2.25 NOS RR 1.1 TOTAL OCCUPANTS = 50.90 PERSONS (ii) Residential Sale Component Permissible 346.09 1ST -- -- 01 LESS INCENTIVE AREA = 270.00 SQ.MT. = 270.00 SQ.MT. 45 TO 60 SQ.MT 40 NOS. 1 PARKING FOR 2 TENAMENT 40/2 20.00 NOS 50 % FOR MALE = 25.45 PERSONS 50 % FOR FEMALE = 25.45 PERSONS 734.09 - 334.96 (Rehab Area) - 53.04 (Comm. Fung.) = 346.09) NET TDR AREA = 397.35 SQ.MT. 60 TO 90 SQ.MT -- 1 PARKING FOR 1 TENAMENT -- -- TOILET REQD. @ 1 FOR 25 PERSONS = 01 Nos. TOILET REQD. @ 1 FOR 15 PERSONS = 01 Nos. LOCATION PLAN 2ND -- 02 20% SLUM TDR:- (iii) Commercial Rehab Component Permissible NIL ABOVE 90 SQ.MT -- 1 PARKING FOR 1/2 TENAMENT -- -- TOILET PROPOSED = 01 Nos. TOILET PROPOSED = 01 Nos. SCALE = 1:4000 3RD -- 02 667.35 X 20% = 134.92 SQ.MT. (iv) Commercial Sale Component Permissible 53.04 GENERAL TDR:- TOTAL 49 NOS. 22.25 NOS (151.54 x 35% = 53.04 ) TOILET PROVIDED = 02 Nos. (B) Proposed Fungible Compensatory Built up area (refer BUA Summary) 705.49 4TH 01 01 (667.35 - 270.00 - 134.92) = 10% PARKING FOR VISITORS 02.23 NOS 262.43 SQ.MT. (i) Proposed Residential Rehab Component (Existing Area From Fung. Table) 306.68 308.56 5TH -- 02 (39.32 %) TOTAL 24.48 NOS SLUM TDR CLAIMED ALREADY = 123.50 SQ.MT. TOTAL PARKING REQUIRED SAY 24.00 NOS (ii) Commercial Sale Component Fungible Proposed 53.04 -- 02 A 6TH GENERAL TDR CLAIMED ALREADY = 222.22 SQ.MT. --- (iii) Residential Sale Component Fungible Area Proposed TOTAL PARKING PROPOSED 345.77 343.89 7TH 01 01 SLUM TDR NOW CLAIMED = 11.42 SQ.MT. ADJ. (705.49 - 308.56 - 53.04) = 343.89 GENERAL TDR NOW CLAIMED = 40.21 SQ.MT. Total proposed Built Up Area Including Fungible Compensatory Area 8TH 01 01 16 2802.88 TOTAL TDR CLAIMED = SHOP 05 1 PARKING FOR 40.00 SQ.MT B.U.A 61.67/40 1.54 NOS C.T.S. NO. 261 397.35 SQ.MT. WEST [13 + 15(b) (i) + (ii) + (iii)] ADJ. AREA UNDER ENCROACHMENT MR PLAN LINE 9TH -- 02 NURSING HOME 01 1 PARKING FOR 150 SQ.MT B.U.A 145.93/150 0.97 NOS 17 Area kept in abeyance for not Providing Fungible to Rehab Component 28.28 C.T.S. NO.259 AREA = 5.66 SQ.MT. Area from exist. Fungible Statement Table IN ADVERSE POSSESSION TOTAL 03 13 05 01 TOTAL (SHOP+ NURSING HOME) 2.51 NOS (Z) 18 Balance Area (734.09 - 28.28 - 705.49) 0.32 AREA = 4.04 SQ.MT 10% PARKING FOR VISITORS 2.51 x 10% = 0.25 NOS (MIN 2.00 = NOS) 2.00 NOS 16 NOS. 19 FSI Consumed On Net Plot [ 13/4 ] 2.20 T4 T13 T14 PERMISSIBLE & PROPOSED FITNESS CENTER AREA STATEMENT TOTAL 4.51 NOS IN ADVERSE POSSESSION T2 T3 T5 T7 T9 II OTHER REQUIREMENTS T8 T10 4.210 AREA = 1.35 SQ.MT (X) T6 TOTAL SAY 5.00 NOS B T11 T12 3.104 4.7233.303 T1 2.876 1) TOTAL PROPOSED B/ UP AREA INCL. FUNGIBLE(204.58+2598.30) = 2802.88 SQ.MT. A) Reservation / Designation 4.343 4.343 AREA IN ADVERSE POSSESSION 3.973 4.493 4.543 RESIDENTIAL TENEMENT TOTAL (A+B) 29.00 NOS 3.700 4.263 4.793 +0.00 LVL. C 3.303 +0.00 LVL. a) Name Of Reservation GATE +0.00 LVL. 2) PERMISSIBLE B/UP AREA FOR FITNESS CENTER, 2% OF 12.950 = 56.06 SQ.MT. ADDITIONAL 50% PARKING = 29.00 X 50% = 14.50 NOS SAY 15 NOS. 15.00 NOS D STATEMENT CHAJJA AT 1ST FLOOR BEAM BOTTOM CHAJJA AT 1ST FLOOR b) Area Of Reservation Affecting The Plot 2.600 3.250 7.100 BEAM BOTTOM TOTAL PROP. B/UP AREA SUBJECT TO 200 SQ.MT. MAXI. BLDG. LINE ABOVE TOTAL SAY (C+D) 44 NOS 0.760 c) Area Of Reservation Land To Be Handed/Handed Over As Per Reg. No.17 5.534 4.350 2.750 BLDG. LINE ABOVE WING-B 3) TOTAL PROP. B/UP AREA OF FITNESS CENTER = 45.72 SQ.MT. NA ENT. LOBBY UP RETAINING WALL BELOW GROUND LVL. RETAINING WALL BELOW GROUND LVL. GROSS PARKING REQUIRED FOR BUILDING 44 NOS d) Built Up Area Of Amenity To Be Handed Over As Per Reg. No.17 FOR NURSING HOME 1.500 UP (FREE OF FSI) SOCIETY FITNESS EXCESS B/ UP AREA OF FITNESS CENTER COUNTED IN F.S.I. UP UP RESI. UNIT 4) = -- SQ.MT. TOTAL PARKING PROVIDED FOR BUILDING 52 NOS 2.847 OFFICE CENTRE e) Area/Built Up Area Of Designation C.T.S. BOUNDARY 2.60 x 1.50 T29 +0.15 MT 3.200 +0.45 LVL. 14 RETAINING WALL B) Plot Area/Built Up Amenity To Be Handed Over As Per Reg. No. WING - A FLOOR EXISTING SALE ADJ. C.T.S. NO.253 4 7 11 BELOW GROUND LVL. 1 RETAINING WALL BELOW +0.00 LVL. 4.750 ENTRANCE 5 8 12 15 FLUSHING UGT PERMISSIBLE & PROPOSED SOC. OFFICE AREA STATEMENT CAR PARKING ARRANGEMENT (i) 14(A) 2 10 16 LOBBY 6 FOR WING-B GROUND TOTAL PARKING REQUIRED BY RULE M. 1.750 = 44 NO'S 12.00 MT WIDE EXISTING 3 9 13 (ii) 14(B) NA 0.400 LIFT (FREE OF FSI) SMALL PARKING CAP=10,000 LTR 1) PERMISSIBLE B/UP AREA = 20.00 SQ.MT. 5.040 5.040 CG 1.740 X 2.480 4.15 x 2.69 SMALL PARKING +0.45 LVL. SMALL PARKING 1ST 02 01 TOTAL PARKING PROVIDED = 52 NO'S M SMALL PARKING LIQ. DEPTH- 2.5MTR (iii) 15 4.50X2.30 WING - B 4.50X2.30 PHYSICAL SURVEY BOUNDARY SMALL PARKING GROUND LVL. TO +0.45 MT SMALL PARKING 4.50X2.30 TOTAL DEPTH-2.7MTR 2) FLOOR LARGE CAR SMALL CAR TOTAL TOTAL PROP. B/UP AREA OF SOC. OFFICE 1.460 1.500 1.500 4.50X2.30 = 22.28 SQ.MT. ER 4.150 4.50X2.30 2ND 02 01 01 C) Requirement Of Recreational Open Space In Layout/Plot As Per Reg. No. 27 NIL 1.500 STACK TO ENTRANCE OV 0.100 STACK TO PIT LOBBY ED CUTOUT 3.100 PIT STACK TO PIT 00 30 D) Tenement Statement PARKING STACK TO STACK TO T15 3) EXCESS B/ UP AREA OF SOC. OFFICE COUNTED IN F.S.I. = 2.28 SQ.MT. ND (FREE OF FSI) FLUSHING UGT GROUND 36 5.084 PARKING PIT PIT U.G. TANK FLUSH TO GRD. LVL. 3RD 04 -- HA 1.57 X 0.39 LOBBY LIFT STACK 00 04 Y FOR WING-A TOP SLAB TO BE DESIGNED TO (i) Proposed Built Up Area ( 16a ) Above ) 2802.88 1.42 X 1.98 1.940 X 1.520 PARKING PARKING AD 0.150 +0.45 LVL. 0.600 CAP=10,000 LTR TAKE 'A'-'A' CLASS LOADING 02 02 SURFACE 00 02 RE CHAJJA AT 1ST FLOOR CONVENIENCE 4TH (ii) Less Deduction Of Non- Residential Area ( Shop etc.) 204.58 AL BEAM BOTTOM RS LIQ. DEPTH- 2.5MTR SHOP-1 3.337 EA ROTARY 16 00 16 0.600 TOTAL DEPTH-2.7MTR 03 01 (iii) Area Available For Tenements [ (i) minus (ii) ] 2598.30 AR 5.27 X 1.83 1.570 2.750 1.580 RETAINING WALL 2.700 2.750 1.580 5TH PARKING 1.100 F.D. F.D. CK BELOW GROUND LVL. 7.030 RERA C.A. = 10.25 SQ.MT PARKING 5.900 LIFT 1.500 1.500 ROAD SET BA 2.220 X 1.440 UP TOTAL PARKING (iv) Tenements Permissible ( Density Of Tenements/Hectare )( Maximum 450T/(H) 116.92 WING-A UP CHOWK 6TH 03 01 PROVIDED 16 36 52 0.600 OPEN TO WING-B S 17 (v) Total Number Of Tenements Proposed On The Plot LOBBY 0.110 +0.00 LVL. 49 nos. 15.170 3.570 1.070 3.110 CONVENIENCE 1.570X 3.110 SKY UP LOBBY 7TH 04 -- RS SHOP-2 1.500 1940 X 1520 E) PARKING STATEMENT AS PER 5.27 X 1.89 SMALL = 4.50 X 2.30 T16 STATEMENT 1.500 LIFT U.G. TANK FLUSH TO GRD. LVL. RERA C.A. = 9.96 SQ.MT 0.110 2.220 X 1.440 TOP SLAB TO BE DESIGNED TO 8TH 03 01 0.600 E.D. 1.250 RETAINING WALL BELOW GROUND LVL. E.D. RETAINING WALL BELOW GROUND LVL. T17 TAKE 'A'-'A' CLASS LOADING RERA CARPET AREA STATEMENT F) TRANSPORT VEHICLES PARKING N.A. 3.766 9TH 01 03 CONVENIENCE RETAINING WALL FRD WING A (COMMERCIAL) PLAN FOR APPROVAL 10.510 METER NORTH 1.20 x SHOP-3 BELOW GROUND LVL. RS 3.62 X 1.90 1.70 x LOBBY LIFT STACK TO ROOM DOMESTIC UGT T18 TOTAL 24 09 1.00 1.00 CARPET TOTAL NO. 1.750 1.44 FOR WING-B 0.45 1.420X 1.830 STACK TO 2.50 X 1.20 FLOORS COMM. NO. OF NO. OF SHAIKH FLAIR +0.45 LVL. 1.940 X 1.520 PIT (FREE OF FSI) STACK TO CAP=16,000 LTR PIT LIQ. DEPTH- 2.5MTR 33 NOS. UNIT NO. FLOORS FLATS/FLR. AREA OF SHOP 4.585 COLUMN RERA C.A. = 9.38 SQ.MT PARKING PARKING PIT PARKING TOTAL DEPTH-2.7MTR (IN SQ. MTS.) CUTOUT 0.95 x STACK STACK (FREE OF FSI) T19 BUILT UP AREA CALCULATION EARLIER AND IN THE NAME OF MCGM. RETAINING WALL 0.70 PARKING PARKING SOUTH CONVENIENCE PUMP BELOW GROUND LVL. ASIF MUSA SHIVAD SMALL PARKING SMALL PARKING SMALL PARKING SMALL PARKING SMALL PARKING 1.500 SHOP-4 4.50X2.30 4.50X2.30 SMALL PARKING SMALL PARKING 4.50X2.30 4.50X2.30 ROOM 4.50X2.30 GROUND FLOOR GROUND FLOOR 1 1 FLRS 1 10.25 1 NOS. 4.50X2.30 4.50X2.30 2.500 X 2.910 5.800 1.05 x 3.77 X 1.88 (FREE OF FSI) 2 1 FLRS 1 9.96 1 NOS. RS 1.49 RERA C.A. = 9.35 SQ.MT METER 2.200 34 5.800 31 24 21 DOMESTIC UGT A 12.950 X 15.170 X 1 NO = 196.45 SQ.MT. Digitally signed by GAURAV Digitally signed by SHIVADAS 18 3 1 FLRS 1 9.38 1 NOS. 49.07 SQ.MT KRISHNA GURAV STACK TO GAURAV FOR WING-A SHASHIKANT KHANOLKAR ROOM 35 32 27 25 22 TOTAL ADDITION = 196.45 SQ.MT. X DN: c=IN, o=BRIHANMUMBAI DN: c=IN, o=MUNICIPAL T28 UP 2.00 X 3.14 TOILET TOILET 33 29 PIT 19 CAP=10,000 LTR LIQ. DEPTH- 2.5MTR T20 4 1 FLRS 1 9.35 1 NOS. MUNICIPAL CORPORATION, ou=SUB CORPORATION OF GREATER 36 SHASHIKAN ENGINEER, 26 PARKING 23 Digitally signed by SHAIKH ASIF MUSA 1.790 28 MUMBAI, ou=BUILDING AS TOTAL DEPTH-2.7MTR 2.5.4.20=8c143ecc232f95bdc25706be 900 X 1.00 30 20 5 1 +0.45 LVL. 1 FLRS 9.01 1 NOS. 7607c588de9d1a8a85f7d9e9187a60d DN: c=IN, o=BRIHANMUMBAI MUNICIPAL PROPOSAL, CHAJJA AT 1ST FLOOR CONVENIENCE 1490 X1490 FRD 4.406 DEDUCTIONS T e29ced457, postalCode=400093, st=MAHARASHTRA, serialNumber=306a422c7a07a0e0c3c CORPORATION, ou=BUILDING PROPOSAL, 2.5.4.20=a9ef4109d1f0761f64789 4d6fd84126d0ede3dafb9753314 RS SHOP-5 1ST FLOOR 1 1 FLRS 152.85 1 NOS. 152.85 SQ.MT KHANOLKAR KRISHNA BEAM BOTTOM 1 NO. eaf442717d29556810ebb9fbad36ca4 2.5.4.20=dc538dee2bc8ae44a2a24206efc4ca6d9817 181bb98565ed0ff5, NATWAR NAGAR ROAD NO. 5 BLDG. LINE ABOVE BLDG. LINE ABOVE +0.00 LVL. 0701bd2f1ba899, cn=GAURAV 4.82 X 1.87 RETAINING WALL BLDG. LINE ABOVE RETAINING WALL 1 7.100 X 0.760 X 1 NO = 5.40 SQ.MT. SHASHIKANT KHANOLKAR f07e6c4eed02678a87124ebb3c56, st=Maharashtra, postalCode=400093, FLAIR Date: 2024.10.01 13:57:16 +05'30' st=Maharashtra, RERA C.A. = 9.01 SQ.MT BELOW GROUND LVL. RETAINING WALL BELOW GROUND LVL. serialNumber=e673174400a2a913c86f1019b5be280 serialNumber=7AC5A48B02E3E2 COLUMN BELOW GROUND LVL. TOTAL NOS. OF FLATS 6 NOS. 3.259 GURAV 4.574 UP ±000MM LVL. CHAJJA AT 1ST FLOOR BEAM BOTTOM 2 2.750 X 5.040 X 1 NO = 13.86 SQ.MT. 24d407841b387a179d59e11e669bc8900, cn=SHAIKH ASIF MUSA AECF71E43FB159DB02A161EAC2 FEF6E75C1B69B3F1D29DD1C4, cn=SHIVADAS KRISHNA GURAV 3.082 3.161 4.346 FIRE UGT 2.279 0.880 4.970 4.350 2.750 U.G. TANK FLUSH TO GRD. LVL. CAP=1,00,000 LTR 3 0.600 X 0.150 X 1 NO = 0.09 SQ.MT. Date: 2024.10.01 15:54:26 +05'30' Date: 2024.10.08 17:59:56 +05'30' 3.681 CHAJJA AT 1ST FLOOR TOP SLAB TO BE DESIGNED TO LIQ. DEPTH- 2.5MTR BEAM BOTTOM 12.950 TAKE 'A'-'A' CLASS LOADING TOTAL DEPTH-2.7MTR 12.950 GATE PROP. RERA CARPET AREA STATEMENT FOR RESIDENTIAL 4 0.600 X 1.070 X 1 NO = 0.64 SQ.MT. 3.321 A. E. ( B. P. ) K/E E. E. ( B. P. ) K/E 2.856 S. E. ( B. P. ) K/E-C 3.605 +0.00 LVL. 2.600 3.250 7.100 0.760 5 2.750 X 5.800 X 1 NO = 15.95 SQ.MT. +0.00 LVL. T24 T27 T26 T25 T23 T22 PAVED R.G.-A AREA PROPOSED - 62.84 SQ.MT 1 6 1.150 X 1.500 X 1 NO = 1.73 SQ.MT. FLOORS FLAT NO. NO. OF RERA AREA / FLAT (IN SQ. MTS.) TOTAL NOS. PROFORMA 'B' 4.350 2.750 7 1.200 X 1.650 X 1 NO = 1.98 SQ.MT. FLOORS WING-A WING-B OF FLAT CONTENTS OF SHEET 5.500 WING-A WING-B 3.200 EAST 1.675 ST2 8 4.350 X 0.760 X 1 NO = 3.31 SQ.MT. SALE MEMBERS SALE MEMBERS GROUND FLOOR PLAN, LINE DIAG. FOR GROUND, AREA CALC.,SUMMARY OF BUILT 5.033 4.200 GROUND Y EXIST PHY PLOT BOUNDAR T21 ROTARY PARKING ST1 UP AREA, CAR PARKING STATEMENT, CARPET AREA STATEMENT (A & B WING) 3.440 EL1 9 0.880 X 10.510 X 1 NO = 9.25 SQ.MT. 1 37.98 F TOWER F 1ST NURSING HOME CARPET AREA CALC., LOCATION PLAN, BLOCK PLAN,PLOT AREA DIAG. & CALC., 0.400 0.480 10 0.400 X 1.460 X 1 NO = 0.58 SQ.MT. -- ETC. 5.040 NURSING HOME SOC. OFFICE 1.720 2 01 09 ED 0.600 X 1.250 X 1 NO = 0.75 SQ.MT. 1 FLR. 2 NOS. 3 33.94 02 10 1.460 10 ST4 1.460 ST3 1.310 3.700 EXISTING COMPOUND WALL & FD 0.600 X 1.100 X 1 NO = 0.66 SQ.MT. DESCRIPTION OF PROPOSAL & PROPERTY 5.500 5.960 03 11 NURSING HOME -- GATE ST5 3.900 04 12 STRUCTURES ALREADY DEMOLISHED 0.880 TOTAL DEDUCTION = 54.20 SQ.MT. Y1 1 1 53.27 41.74 C.T.S NO. L/V 0.233 05 06 13 14 0.700 0.600 0.150 TOTAL CONSTRUCTION AREA PER FLR [X - Y1] = 142.25 SQ.MT. X1 2ND 2 53.44 41.74 PROPOSED REDEVELOPMENT OF EXIST. RESIDENTIAL BUILDING KNOWN AS ROSE BLOSSOM CHS. LTD. ON PLOT BEARING CTS NO. 260A OF VILLAGE MOGRA, K/E -WARD, NATWAR 2 260/B L/V L/V 07 15 2.150 3 LESS INT. STAIRCASE AREA CALCULATION FITNESS CENTRE 1 FLR. -- 5 NOS. NAGAR ROAD NO. 05, JOGESHWARI EAST, MUMBAI - 400 060. 08 16 0.600 FD 1.100 4 37.01 L/V 0.600 GROUND FLOOR D/W ST1 3.250 X 4.200 X 1 NO = 13.65 SQ.MT. 1 1 53.27 43.28 NAME AND SIGNATURE OF OWNER / APPLICANT 15.170 15.170 L/V EXISTING 1.560 ROTARY PARKING TOWER 1.506 A ST1 6.770 ST2 3.570 4 1.070 ST2 2.600 X 3.200 X 1 NO = 8.32 SQ.MT. 3RD 2 2 1 FLR. 53.44 43.28 6 NOS. SHREE PRITESH DAMJI SAVLA VENUS APT 3 42.00 ST3 1.720 X 1.310 X 1 NO = 2.25 SQ.MT. 0.600 ED 1.250 4 42.00 of M/s VINI DEVELOPERS ST4 0.480 X 1.460 X 1 NO = 0.70 SQ.MT. PRITESH Digitally signed GR + 4TH FLOOR 3.629 TOTAL R.G.-A AREA PROPOSED - 143.05 SQ.MT by PRITESH D/W 4TH 1 1 53.27 46.75 UNPAVED R.G.-A AREA PROPOSED - 80.21 SQ.MT DAMJI DAMJI SAVLA 10.510 PROP. COMPOUND WALL 2.750 ST5 3.700 X 0.700 X 1 NO = 2.59 SQ.MT. 9 2 2 53.44 45.98 Date: HT. 15.10M. (APPROX) 0.150 TOTAL INT. STAIRCASE AREA PER FL. (GROUND FLR.) = 27.51 SQ.MT. Y2 1 FLR. 44.05 6 NOS. SAVLA 2024.10.01 PT 2.000 1.200 1.150 3 12:45:48 +05'30' L/V - H/5 = 3.02 M. US A C.T.S NO. ST3 LESS STAIRCASE AREA CALCULATION 46.77 C.A. TO OWNER VEN 4 D/W - 3.60M. 260/A GROUND FLOOR 1.650 7 6 1.500 1 1 53.27 46.75 1.150 5 5.800 ST1 3.900 X 6.770 X 1 NO = 26.40 SQ.MT. 5TH 2 2 53.44 45.98 CERTIFICATE OF PLOT AREA 3.440 1 FLR. (1) MT1 ST2 2.150 X 3.570 X 1 NO = 7.68 SQ.MT. 6 NOS. 3 46.75 CERTIFIED THAT I HAVE SURVEYED THE PLOT UNDER REFERENCE ON EXISTING COMPOUND WALL & ST3 1.150 X 0.150 X 1 NO = 0.17 SQ.MT. DATE : 14/12/2020 AND THAT THE DIMENSIONS OF THE SIDES, ETC. OF THE 4 46.77 STRUCTURES ALREADY DEMOLISHED PLOT STATED ON THE PLAN ARE AS MEASURED ON SITE AND THE AREA SO TOTAL STAIRCASE AREA PER FL. (GROUND FLR.) = 34.25 SQ.MT. Y2 1 1 53.27 46.75 WORKED OUT IS 959.02 SQ.MT AND TALLIES WITH THE AREA STATED IN 6TH 53.44 2 47.04 0.760 LESS METER AREA CALCULATION 2 1 FLR. THE DOCUMENT OF OWNERSHIP \ PROPERTY REGISTER CARD. IN ADVERSE POSSESSION (4) 8 6 NOS. UJWAL Digitally signed by AREA = 5.35 SQ.MT AREA UNDER ENCROACHMENT 3 46.75 UJWAL SATISH BHOLE AREA = 0.84 SQ.MT (2) 0.880 4.970 4.350 2.750 GROUND FLOOR 4 46.77 SATISH Date: 2024.09.27 (3) 12.950 MT1 2.000 X 3.440 X 1 NO = 6.88 SQ.MT. 1 1 53.27 46.75 BHOLE 16:04:15 +05'30' TOTAL METER AREA PER FL. (GROUND FLOOR) = 6.88 SQ.MT. Y3 7TH ADJ. SIGNATURE OF ARCHITECT PROP. COMP. WALL 2 2 1 FLR. 53.44 47.04 W.T 46.76 6 NOS. JOB NO. C.T.S. NO.263 ADJ. LINE DIAG. FOR GROUND FLOOR LESS - ENT. LOBBY AREA CALCULATION GROUND FLOOR 3 4 46.77 DRAWN BY TAWAKKAL DATE 27.09.2024 CHECKED BY P.R SCALE AS SHOWN C.T.S. NO.264 AREA CALC. NURSING HOME(WING - A) EL1 4.350 X 3.440 X 1 NO = 14.96 SQ.MT. 8TH 1 2 1 2 1 FLR. 53.44 53.27 46.75 47.04 6 NOS. NORTH DEEPAK A. NAME, ADDRESS AND SIGNATURE OF ARCHITECT SCALE - 1 : 100 TOTAL ENT. LOBBY AREA PER FL. (GROUND FLR.) = 14.96 SQ.MT. Y4 3 55.58 AREA UNDER ENCROACHMENT 4 55.58 AR. UJWAL SATISH BHOLE AREA = 0.10 SQ.MT GROUND FLOOR PLAN (WING A & B) NET BUILT UP AREA OF GROUND FLOOR [X1 - (Y2+Y3+Y4)] = 58.65 SQ.MT. 9TH 1 1 53.27 46.75 CA / 2010 / 47919 SCALE - 1 : 100 IN ADVERSE POSSESSION AREA = 2.00 SQ.MT 2 2 3 1 FLR. 53.44 47.04 55.58 6 NOS. N UJWAL Digitally signed by UJWAL 4 55.58 u b a r c h i t e c t s SATISH SATISH BHOLE TOTAL NOS. OF FLATS 13.00 03.00 09.00 24.00 49.00 NOS. 602 - B, Sarvoday 11, Kher Nagar, Date: 2024.09.27 Bandra (East), Mumbai- 400051. www.ubarchitects.in BHOLE 16:04:29 +05'30' P-8881/2021/(260/A AND OTHER)/K/E WARD/MOGRA 2/7 THIS PLAN IS DIGITALLY SIGNED AND PHYSICAL SIGH IS NOT REQUIRED APPROVED SUBJECT TO CONDITIONS MENTIONED IN THIS OFFICE LETTER UNDER P-8881/2021/(260 A And Other)/K/E Ward/MOGRA Dated : 08.10.204 BUILT UP AREA CALCULATION 3RD FLOOR ( WING A-& B) A 31.200 X 15.170 X 1 NO = 473.30 SQ.MT. TOTAL ADDITION = 473.30 SQ.MT. X 31.200 0.300 0.300 5.930 4.270 2.660 2.810 9.810 2.300 2.820 DEDUCTIONS BLDG. LINE ABOVE 31.200 0.300 0.300 0.350 0.35 M CHAJJA BLDG. LINE ABOVE BLDG. LINE ABOVE 1 4.270 X 0.760 X 2 NOS = 6.49 SQ.MT. 1.110 0.150 4.270 2.660 2.810 9.810 2.300 2.820 0.150 5.930 0.760 0.540 S.S. 0.540 BLDG. LINE ABOVE 0.630 0.390 BLDG. LINE ABOVE 0.390 1.390 2 2.660 X 1.390 X 2 NOS = 7.39 SQ.MT. 0.760 0.850 0.850 DUCT 0.45 M CHAJJA 1.000 1.000 1 0.80 M CHAJJA 3 5 6 5 1.390 1.390 1.390 0.24 M CHAJJA 0.24 M CHAJJA 0.63 M CHAJJA 0.63 M CHAJJA 0.63 M CHAJJA 0.45 M CHAJJA 2 4 7 3 2.810 X 1.000 X 2 NOS = 5.62 SQ.MT. BED ROOM 3.200 3.45 X 2.90 KITCHEN 4 9.810 X 1.390 X 1 NO = 13.64 SQ.MT. 3.200 1.95 X 3.00 TOILET 1.20 X 2.09 BED ROOM BED ROOM BED ROOM 5 0.300 X 0.850 X 2 NOS = 0.51 SQ.MT. 2.43 X 2.25 KITCHEN 2.43 X 2.25 2.90 X 3.14 KITCHEN 1.83 X 2.01 BED ROOM 1.83 X 2.01 BED ROOM 6 2.300 X 1.000 X 1 NO = 2.30 SQ.MT. 2.74 X 3.01 2.74 X 3.01 LIVING LIVING 0.400 0.400 4.640 TOILET 1.31 X PASSAGE 2.90 X 4.26 2.90 X 4.26 7 2.820 X 1.390 X 1 NO = 3.92 SQ.MT. 1.460 DUCT S.S. 2.00 X 1.21 1.95 X 1.21 1.45 X 9.00 4.640 0.90 0.85 X PASSAGE PASSAGE 0.85 X RERA CARPET AREA RERA CARPET AREA 8 2.270 X 1.100 X 2 NOS = 4.99 SQ.MT. 1.460 1.00 1.00 1.200 2.98 X 1.00 2.98 X 9.00 0.73 X 2.25 0.73 X 2.25 1.420 = 42.00 SQ.MT = 42.00 SQ.MT 16 0.350 LIFT 2.270 2.270 3.670 9 1.670 X 1.250 X 4 NOS = 8.35 SQ.MT. TOILET TOILET TOILET TOILET 1.250 1.250 1.940 X 1.520 DUCT S.S. DUCT 1.330 S.S. 0.750 2.270 2.270 1.750 0.750 2.00 X 1.10 DUCT DUCT 2.00 X 1.10 2.00 X 1.10 2.00 X 1.10 ST1 10 2.270 X 1.070 X 2 NOS = 4.86 SQ.MT. 1.100 1.100 EXISTING MEMBER 3 4 EXISTING MEMBER 8 8 LIVING F.R.D. F.R.D. 5.18 X 3.00 11 2.270 X 0.600 X 2 NOS = 2.72 SQ.MT. 1.790 2.000 2.030 2.150 3.000 2.000 2.030 2.300 RERA AREA F.D. 4.420 F.D. 0.600 1.670 0.600 1.670 12 2.300 X 3.110 X 1 NO = 7.15 SQ.MT. 1.580 5.820 LIFT 5.970 2.150 9.860 1.500 0.950 0.950 3.110 1.250 1.250 1.250 1.250 2.300 F.R.D. 0.75 M CHAJJA = 53.27 SQ.MT UP 0.450 2.22 X 1.440 UP 0.450 19 9 19 9 (SALE) 1 WING-A WING-B BLDG. LINE ABOVE 13 2.890 X 1.390 X 1 NO = 4.02 SQ.MT. CHOWK 15.170 LOBBY 3.110 3.270 3.270 3.270 3.110 3.270 5.850 LOBBY 1.42 X 6.77 OPEN TO SKY 3.00 X 3.27 13.780 2.270 2.270 15.170 15.170 14 2.730 X 1.000 X 1 NO = 2.73 SQ.MT. F.R.D. 3.270 1.070 3.270 3.270 1.070 3.110 (SALE) 17 ST2 10 A 18 ST3 10 12 2 0.110 0.600 0.110 5.850 1.500 1.580 DN 0.450 LIFT DN 0.450 15 9.910 X 1.390 X 1 NO = 13.77 SQ.MT. E.D. 0.950 2.22 X 1.440 E.D. 0.950 ST. CASE & 0.600 1.670 ST. CASE & 0.600 1.670 2.300 16 0.400 X 1.460 X 2 NOS = 1.17 SQ.MT. 0.600 1.250 0.600 1.250 1.250 1.250 2.270 2.150 LIVING LIFT & PASS. 19 9 LIFT & PASS. 19 9 0.830 5.25 X 3.00 0.750 0.750 F.R.D. F.R.D.EXISTING MEMBER DUCT S.S. DUCT EXISTING MEMBER 2 1 DUCT S.S. DUCT 17 0.750 X 5.850 X 1 NO = 4.39 SQ.MT. RERA AREA TOILET TOILET TOILET TOILET 3.670 = 53.44 SQ.MT LIFT 2.00 X 1.20 0.73 X 2.25 2.00 X 1.20 2.00 X 1.20 11 11 0.73 X 2.25 0.350 1.940 X 1.520 C.B. C.B. C.B. 1.92 X 1.20 18 2.150 X 3.270 X 1 NO = 7.03 SQ.MT. 1.750 0.68 X C.B. 1.49 X 0.60 0.68 X ST1 0.60 1.49 X 0.60 2.270 2.270 1.420 0.60 RERA CARPET AREA RERA CARPET AREA 0.400 19 0.600 X 1.250 X 4 NOS = 3.00 SQ.MT. 1.200 = 43.28 SQ.MT 1.460 1.00 X PASSAGE = 43.28 SQ.MT PASSAGE 1.00 X DUCT 4.640 S.S. TOILET 1.31 X PASSAGE 0.90 2.98 X 9.00 2.98 X 9.00 0.90 TOTAL DEDUCTION = 104.05 SQ.MT. Y1 1.460 2.00 X 1.21 0.90 1.95 X 1.21 1.35 X 9.00 LIVING LIVING 16 4.640 0.400 BED ROOM 2.90 X 4.26 2.90 X 4.26 TOTAL CONSTRUCTION AREA PER FLR = 369.25 SQ.MT. X1 BED ROOM 0.450 2.74 X 2.91 KITCHEN 2.74 X 2.91 KITCHEN BED ROOM BED ROOM 1.83 X 2.01 1.83 X 2.01 BED ROOM TOILET 0.390 LESS STAIRCASE & LIFT AREA CALCULATION 0.390 0.390 1.20 X 2.09 2.90 X 3.14 2.43 X 2.25 2.43 X 2.25 0.45 M CHAJJA KITCHEN 3.200 BED ROOM 1.95 X 3.00 3RD FLOOR 3.45 X 2.90 0.630 0.65 M CHAJJA 0.65 M CHAJJA 0.65 M CHAJJA 0.39 M CHAJJA 3.200 ST1 3.670 X 1.750 X 2 NOS = 12.85 SQ.MT. 0.26 M CHAJJA 0.26 M CHAJJA 0.760 DUCT 0.35 M CHAJJA 1.390 1.390 1.390 ST2 5.970 X 3.270 X 1 NO = 19.52 SQ.MT. 1.110 0.390 2 15 13 0.355 1.000 1.000 BLDG. LINE ABOVE 0.760 S.S. 3 14 0.350 BLDG. LINE ABOVE 1 0.35 M CHAJJA ST3 9.860 X 3.270 X 1 NO = 32.24 SQ.MT. 5.930 4.270 2.660 2.810 9.910 2.730 2.890 5.930 4.270 2.660 2.810 9.910 2.730 2.890 TOTAL STAIRCASE & LIFT AREA PER FL. (3RD FLR.) = 64.61 SQ.MT. Y2 31.200 31.200 NET BUILT UP AREA OF 3RD FLOOR = 304.64 SQ.MT. ( WING A-& B) 3RD FLOOR PLAN (WING A & B) LINE DIAG. FOR 3RD FLOOR AREA CALC.(WING - A+B ) SCALE - 1 : 100 SCALE - 1 : 100 BUILT UP AREA CALCULATION 2ND FLOOR 31.200 31.200 0.300 0.300 R.C.C CROSS- BEAM 0.300 0.300 A 31.200 X 15.170 X 1 NO = 473.30 SQ.MT. 5.930 BRICK WORK 4.270 2.660 2.810 9.810 2.300 1.570 1.250 TO BE PROPOSED 5.930 4.270 2.660 2.810 9.810 2.300 1.570 1.250 3RD FLR BUILDING LINE TO AVOID MIS-USE TOTAL ADDITION = 473.30 SQ.MT. 0.350 0.760 1.000 0.850 0.850 0.35 M CHAJJA 0.35 M CHAJJA ABOVE 1 5 5 1.110 3 2 1.390 4 1.390 6 1.390 7 1.390 S.S. 0.450 0.540 0.540 0.540 0.540 0.390 DEDUCTIONS 0.390 DUCT 0.45 M CHAJJA 2.730 0.80 M CHAJJA 0.65 M CHAJJA 0.630 8 3.200 1.04 M CHAJJA 0.65 M CHAJJA 1 4.270 X 0.760 X 2 NOS = 6.49 SQ.MT. 2.730 1.04 M CHAJJA 0.65 M CHAJJA 0.65 M CHAJJA 0.45 M CHAJJA BED ROOM 3.200 3.45 X 2.90 KITCHEN 1.95 X 3.00 TOILET 2 2.660 X 1.390 X 1 NO = 3.70 SQ.MT. 1.20 X 2.09 1.020 BED ROOM 3 2.810 X 1.000 X 1 NO = 2.81 SQ.MT. 2.43 X 3.40 KITCHEN 0.400 FITNESS CENTER 1.020 RCC WALL 0.800 2.90 X 3.14 1.83 X 2.11 BED ROOM 3.160 REFER SEPARATE DIAG. FOR DEDUCTION 4 9.810 X 1.390 X 1 NO = 13.64 SQ.MT. VOID 2.89 X 3.01 FITNESS CENTER 1.820 LIVING 4.07 X 3.01 5.03 X 3.01 9 1.460 FITNESS CENTER 2.86 X 4.26 19 5 0.300 X 0.850 X 2 NOS = 0.51 SQ.MT. 0.400 TOILET 1.05 X PASSAGE 1.45 X 9.00 (FREE OF F.S.I.) 1.460 DUCT 3.300 PERMISSIBLE FITNESS CENTER AREA :- S.S. 2.00 X 1.21 1.21 1.95 X 1.21 - 2% OF PROP. B.U.A. (RESI.) = PASSAGE 3.670 6 2.300 X 1.390 X 1 NO = 3.20 SQ.MT. 3.300 - PROP. AREA = 2802.88 x 2% = 56.06 SQ.MT PERM. RERA CARPET AREA 1.25 X 9.00 1.200 0.73 X 2.15 2.270 2.270 1.750 1.420 - FITNESS CENTER PROPOSED = 45.72 SQ.MT. = 37.01 SQ.MT ST1 1.100 1.100 0.750 10 10 7 1.570 X 1.390 X 1 NO = 2.18 SQ.MT. LIFT 2.270 2.270 0.350 1.100 1.100 TOILET TOILET TOILET 1.250 1.940 X 1.520 1.330 2.00 X 1.10 DUCT S.S. DUCT 2.00 X 1.10 DUCT S.S. DUCT 1.92 X 1.10 8 1.250 X 2.730 X 1 NO = 3.41 SQ.MT. 0.750 5.78 X 1.25 3 4 EXISTING MEMBER 0.600 1.670 0.600 1.670 LIVING 5.970 2.150 9.860 1.250 1.250 1.250 1.250 F.R.D. F.R.D. 22 11 22 11 2.300 9 1.020 X 1.820 X 1 NO = 1.86 SQ.MT. 5.18 X 3.00 0.600 0.600 1.250 1.250 1.790 2.000 2.030 2.150 3.000 2.000 2.030 RERA AREA F.D. 0.950 F.D. 1.670 2.300 10 2.270 X 1.100 X 2 NOS = 4.99 SQ.MT. 1.580 LIFT 1.500 0.950 = 53.27 SQ.MT 3.970 2.270 F.R.D. 2.270 0.75 M CHAJJA UP 0.450 UP 0.450 2.22 X 1.440 15.170 3.110 3.270 1.070 3.270 3.270 1.070 (SALE) 1 WING-A WING-B 20 ST2 12 A 21 ST3 12 14 11 1.670 X 1.250 X 4 NOS = 8.35 SQ.MT. 15.170 LOBBY 0.600 CHOWK 3.110 5.850 6.770 3.110 3.270 3.270 1.070 3.270 1.070 LOBBY 15.170 5.850 1.42 X 6.77 5.870 OPEN TO SKY 3.00 X 3.27 5.870 3RD FLR 15.170 ST. CASE & 0.600 1.670 ST. CASE & 0.600 1.670 12 2.270 X 1.070 X 2 NOS = 4.86 SQ.MT. F.R.D. (SALE) 0.110 0.600 0.110 0.600 BUILDING LINE 1.250 1.250 1.250 1.250 2 DN 1.500 0.450 3.820 LIFT DN 1.580 0.450 ABOVE LIFT & PASS. 22 11 LIFT & PASS. 22 11 13 2.270 X 1.200 X 2 NOS = 5.45 SQ.MT. 1.250 1.250 2.22 X 1.440 E.D. 0.950 E.D. 0.950 1.670 2.300 14 2.300 X 3.110 X 1 NO = 7.15 SQ.MT. LIVING 2.150 3.670 2.270 2.270 F1 1.200 1.200 5.25 X 3.00 F.R.D. F.R.D. 15 2.890 X 1.390 X 1 NO = 4.02 SQ.MT. 1.750 (SALE) 0.600 1.670 ST1 13 13 1.430 0.400 1.350 0.390 RERA AREA TOILET EXISTING MEMBER 2 1 2.810 1.200 1.200 0.750 LIFT TOILET DUCT S.S. DUCT TOILET TOILET 2.150 = 53.44 SQ.MT 16 2.730 X 1.000 X 2 NOS = 5.46 SQ.MT. 0.73 X 2.25 2.00 X 1.20 2.00 X 1.20 2.00 X 1.20 0.73 X 2.25 0.350 1.940 X 1.520 1.92 X 1.20 2.270 8.200 1.460 17 9.910 X 1.390 X 1 NO = 13.77 SQ.MT. 2.810 19 4.640 1.420 F2 3.310 1.200 PASSAGE RERA CARPET AREA PASSAGE 1.460 RERA CARPET AREA F4 1.05 X DUCT PASSAGE = 41.74 SQ.MT 18 2.740 X 1.390 X 1 NO = 3.81 SQ.MT. 4.640 TOILET 3.98 X 9.00 3.98 X 9.00 S.S. 1.21 = 41.74 SQ.MT 2.00 X 1.21 1.95 X 1.21 1.35 X 9.00 0.400 LIVING LIVING 19 0.400 X 1.460 X 2 NOS = 1.17 SQ.MT. BED ROOM BED ROOM 2.74 X 2.91 KITCHEN 2.90 X 4.26 2.90 X 4.26 KITCHEN 2.74 X 2.91 20 0.750 X 5.850 X 1 NO = 4.39 SQ.MT. BED ROOM BED ROOM 1.83 X 2.01 1.83 X 2.01 BED ROOM 2.300 TOILET 3.200 2.90 X 3.14 2.43 X 2.25 1.750 1.20 X 2.09 2.43 X 2.25 21 2.150 X 3.270 X 1 NO = 7.03 SQ.MT. F3 5.930 0.80 M CHAJJA KITCHEN 3.200 BED ROOM 1.95 X 3.00 22 0.60 X 1.25 X 4 NOS = 3.00 SQ.MT. F5 1.250 3.45 X 2.90 18 1.390 17 1.390 15 1.390 1.000 1.000 0.65 M CHAJJA 0.65 M CHAJJA 0.65 M CHAJJA 0.65 M CHAJJA 0.39 M CHAJJA 0.760 0.65 M CHAJJA 16 16 TOTAL DEDUCTION = 111.25 SQ.MT. 1.390 0.26 M CHAJJA 0.26 M CHAJJA 1 0.760 0.390 0.390 DUCT 0.35 M CHAJJA 1.110 0.630 0.390 TOTAL CONSTRUCTION AREA PER FLR = 362.05 SQ.MT. 0.355 0.390 S.S. 5.930 4.270 2.740 2.730 9.910 2.730 2.890 LINE DIAG. FOR FITNESS 0.35 M CHAJJA 0.35 M CHAJJA BRICK WORK 31.200 5.930 4.270 2.740 2.730 9.910 2.730 2.890 LESS STAIRCASE & LIFT AREA CALCULATION CENTER AREA CALC. ( BLOCK - C ) 31.200 LINE DIAG. FOR 2ND FLOOR AREA CALC.(WING - A+B ) 2ND FLOOR ST1 3.670 X 1.750 X 2 NOS = 12.85 SQ.MT. SCALE - 1 : 100 SCALE - 1 : 100 ST2 5.970 X 3.270 X 1 NO = 19.52 SQ.MT. 2ND FLOOR PLAN (WING A & B) ST3 9.860 X 3.270 X 1 NO = 32.24 SQ.MT. BUILT UP AREA CALCULATION FITNESS CENTER AREA ( 2ND FLOOR ) (WING -B) TOTAL STAIRCASE & LIFT AREA PER FL. (2ND FLR.) = 64.61 SQ.MT. SCALE - 1 : 100 1 2.810 X 0.390 X 1 NO = 1.10 SQ.MT. LESS-FITNESS CENTER AREA AS PER = 45.72 SQ.MT. 2 2.150 X 2.810 X 1 NO = 6.04 SQ.MT. SEPARATE STATEMENT ( BLOCK - C ) 3 2.300 X 1.750 X 1 NO = 4.03 SQ.MT. 4 8.200 X 3.310 X 1 NO = 27.14 SQ.MT. NET BUILT UP AREA OF = 251.72 SQ.MT. 2ND FLOOR ( WING - A & B ) 5 5.930 X 1.250 X 1 NO = 7.41 SQ.MT. TOTAL FITNESS CENTER B/UP AREA PROPOSED = 45.72 SQ.MT. BUILT UP AREA CALCULATION 1ST FLOOR (NURSING HOME)(WING-A) 1 18.475 X 15.170 X 1 NO = 280.27 SQ.MT. TOTAL ADDITION = 280.27 SQ.MT. 18.475 12.725 0.230 GLASS FACADE 5.700 4.040 0.230 2.660 0.230 5.385 7.005 0.300 2.300 0.300 2.820 DEDUCTIONS PLAN FOR APPROVAL GLAZING 1 4.040 X 1.390 X 1 NO = 5.62 SQ.MT. 18.475 0.230 0.230 0.230 2ND FLR BLDG. 2 0.230 X 0.760 X 1 NO = 0.17 SQ.MT. 0.540 5.700 4.040 2.660 5.385 SHAIKH 3.950 1.500 DUCT GLASS LINE ABOVE GLASS 2.955 DUCT R.C.C. COLUMN BUILT UP AREA CALCULATION 1.500 1.500 1.040 LOBBY FACADE COUNTED IN F.S.I. 3 2.660 X 1.390 X 1 NO = 3.70 SQ.MT. 0.760 FACADE 1ST FLOOR (WING B) 1.000 GLAZING GLAZING 0.60 M CHAJJA 0.60 M CHAJJA 2 4 1.390 1.390 1.390 1.390 PARDI/RAILING 4 0.230 X 1.000 X 1 NO = 0.23 SQ.MT. ASIF MUSA ST2 1 3 5 3.200 SHIVAD Digitally signed by SHIVADAS 1 15.680 X 13.320 X 1 NO = 208.86 SQ.MT. Digitally signed by GAURAV SHASHIKANT KHANOLKAR KRISHNA GURAV 5 5.385 X 1.390 X 1 NO = 7.49 SQ.MT. DN: c=IN, o=BRIHANMUMBAI DN: c=IN, o=MUNICIPAL 2.880 3.200 3.200 GAURAV GLASS 15.680 TOTAL ADDITION = 208.86 SQ.MT. X MUNICIPAL CORPORATION, ou=SUB CORPORATION OF GREATER 4.750 ST1 AS 0.300 0.300 ENGINEER, MUMBAI, ou=BUILDING 2.5.4.20=8c143ecc232f95bdc25706be FACADE 6 2.270 X 1.100 X 1 NO = 2.50 SQ.MT. 2.955 7.005 2.300 2.820 PROPOSAL, 1.750 4.35 X 2.51 SHASHIKANT 7607c588de9d1a8a85f7d9e9187a60d Digitally signed by SHAIKH ASIF MUSA 2.5.4.20=a9ef4109d1f0761f647894 RCC WALL e29ced457, postalCode=400093, GLAZING LIFT NURSING HOME DEDUCTIONS DN: c=IN, o=BRIHANMUMBAI MUNICIPAL 2.73 X 3.01 0.540 0.540 st=MAHARASHTRA, d6fd84126d0ede3dafb975331418 0.400 BED ROOM KITCHEN LIVING 7 1.670 X 1.250 X 2 NOS = 4.18 SQ.MT. 2 3 KHANOLKAR serialNumber=306a422c7a07a0e0c3c CORPORATION, ou=BUILDING PROPOSAL, KRISHNA 1.740 X 2.480 1bb98565ed0ff5, 5.24 X 3.01 RCC WALL 1.500 1.500 2.51 X 4.26 3.08 X 3.01 eaf442717d29556810ebb9fbad36ca4 2.5.4.20=dc538dee2bc8ae44a2a24206efc4ca6d9 postalCode=400093, 2.04 X 4.26 1 2.955 X 5.100 X 1 NO = 15.07 SQ.MT. 0701bd2f1ba899, cn=GAURAV st=Maharashtra, SHASHIKANT KHANOLKAR 817f07e6c4eed02678a87124ebb3c56, 1.450 DUCT 0.100 0.400 0.370 8 2.270 X 1.070 X 1 NO = 2.43 SQ.MT. 1.460 LIFT CLOSED AT 1ST FLOOR Date: 2024.10.01 13:57:38 +05'30' TO OPEN DIRECTLY 2ND FLOOR st=Maharashtra, serialNumber=7AC5A48B02E3E2A R.C.C CROSS- BEAM ABOVE 1.500 GURAV ECF71E43FB159DB02A161EAC2FE 0.300 2 7.005 X 0.540 X 1 NO = 3.78 SQ.MT. 1.000 ONWARDS FOR RES USER serialNumber=e673174400a2a913c86f1019b5b 1.830 3.100 2.880 DN RERA CARPET AREA 4.560 F6E75C1B69B3F1D29DD1C4, 6 e28024d407841b387a179d59e11e669bc8900, = 33.94 SQ.MT TO AVOID MISUSE 9 2.270 X 1.200 X 1 NO = 2.72 SQ.MT. 1.310 2.340 cn=SHIVADAS KRISHNA GURAV 1.460 1.460 2.110 ST4 cn=SHAIKH ASIF MUSA 1.700 18ST3 4 3 2.300 X 0.540 X 1 NO = 1.24 SQ.MT. Date: 2024.10.08 18:00:11 +05'30' 2.300 ST5 5 Date: 2024.10.01 15:54:49 +05'30' 1.200 1.53 X 0.39 FRD LIFT 2.270 PASS. 10 3.855 X 4.620 X 1 NO = 17.81 SQ.MT. 0.300 TOILET 1.100 2.100 1.250 TOILET DUCT 1.94 X 1.52 2.270 4 1.450 X 2.340 X 1 NO = 3.39 SQ.MT. 5.100 0.93 OPENING 1.65 X 1.83 2.00 X 1.10 S.S VOID 3.63 X 1.25 3 X 1.25 2.00 X 1.10 11 2.805 X 4.600 X 1 NO = 12.90 SQ.MT. 1 S. E. ( B. P. ) K/E-C A. E. ( B. P. ) K/E E. E. ( B. P. ) K/E 0.770 1.750 EXISTING MEMBER STL1 1.100 0.930 IN SHEAR FRD 5 0.300 X 2.110 X 1 NO = 0.63 SQ.MT. 6 4.340 GLASS WALL 1.870 2.000 2.030 0.600 F.D. 1.250 1.670 2.150 3.000 2.000 2.030 F.D. 1.670 3.855 12 5.470 X 1.390 X 1 NO = 7.60 SQ.MT. 6 2.820 X 2.880 X 1 NO = 8.12 SQ.MT. PROFORMA 'B' LIFT 7.030 1.580 2.070 5.900 1.500 FACADE 0.950 3.820 0.950 0.600 2.300 UP 0.450 2.22 X 1.44 UP 0.450 13 4.270 X 0.760 X 1 NO = 3.25 SQ.MT. 7 CONTENTS OF SHEET GLAZING 1.650 4.400 1.250 1.250 7 4.340 X 2.070 X 1 NO = 8.98 SQ.MT. 0.110 WING-B 3.270 D1 7 1.20 M CHAJJA NURSING HOME + WING-A 0.600 CHOWK 3.110 14 0.550 X 0.230 X 1 NO = 0.13 SQ.MT. 1.070 3.270 3.570 1ST TO 3RD FLOOR PLAN, LINE DIAG. & CALC., SUMMARY OF BUILT UP AREA, LOBBY OPEN TO LOBBY SHOP -1 AT GRD FLR. 3.110 2.70 X 3.27 0.110 2ND FLR. BUILDING 8 3.070 X 1.250 X 2 NOS = 7.68 SQ.MT. 15.170 1.57 X 3.11 SYK 13.320 2.270 15 0.770 X 4.130 X 1 NO = 3.18 SQ.MT. ETC. 2ND FLR BLDG. 0.600 LINE ABOVE 0.600 3.070 15.170 5.23 X 5.46 5.850 3.110 3.270 1.070 4.620 1.500 5.850 LIFT 9 3.670 X 1.070 X 1 NO = 3.93 SQ.MT. 1.580 1.250 8.960 0.900 0.900 1.250 1.250 DN DN 17 STL2 1 STL3 8 0.450 2.22 X 1.44 0.450 16 0.700 X 0.300 X 1 NO = 0.21 SQ.MT. D1 8 E.D. 1.250 RERA CA = 152.85 SQ.MT 0.950 LIFT & PASS. E.D. 0.950 10 5.240 X 1.200 X 1 NO = 6.29 SQ.MT. NURSING HOME + STAIRCASE 0.600 2.570 1.250 0.600 1.670 10 15.170 17 0.770 X 5.850 X 1 NO = 4.50 SQ.MT. LINE ABOVE 3.670 1.250 1.250 13.320 3.110 RERA C.A. = 10.25 SQ.MT (SHOP-1) FRD FRD EXISTING MEMBER 11 0.900 X 3.110 X 1 NO = 2.80 SQ.MT. DESCRIPTION OF PROPOSAL & PROPERTY 3.270 1.070 D1 7 3.420 0.900 15 ST1 1 9 11 ST2 1.350 1.430 W.C. 2 1 RERA CARPET AREA 18 0.400 X 1.460 X 1 NO = 0.58 SQ.MT. 3.270 1.200 TOTAL RERA C.A. = 163.10 SQ.MT TOILET TOILET 13.320 LIFT DUCT S.S VOID S.S DUCT 1.10 X 1.20 3.59X 1.35 = 37.98 SQ.MT 1.83 X 1.20 12 2.890 X 0.390 X 1 NO = 1.13 SQ.MT. PROPOSED REDEVELOPMENT OF EXIST. RESIDENTIAL BUILDING KNOWN AS ROSE BLOSSOM 2.00 X 1.20 2.100 1.42 X 1.94 X 1.52 3.170 5.470 2.270 D1 0.600 X 1.250 X 2 NOS 1.50 SQ.MT. ST. CASE & 0.600 3.070 CHS. LTD. ON PLOT BEARING CTS NO. 260A OF VILLAGE MOGRA, K/E -WARD, NATWAR 1.200 1.83 1.250 1.250 13 10.060 X 0.390 X 1 NO = 3.92 SQ.MT. 1.750 STL1 9 D1 8 NAGAR ROAD NO. 05, JOGESHWARI EAST, MUMBAI - 400 060. RCC WALL 5.32 X 0.40 0.700 TOTAL DEDUCTION = 80.70 SQ.MT. 0.300 DUCT PASSAGE RCC WALL LIFT CLOSED AT 1ST FLOOR LIVING 4.71 X 0.90 16 14 0.150 X 3.210 X 1 NO = 0.48 SQ.MT. TO OPEN DIRECTLY 2ND FLOOR SOCIETY OFFICE 2.94 X 4.26 TOTAL CONSTRUCTION AREA PER FLR [X - Y1] = 199.57 SQ.MT. 4.990 5.240 0.300 ONWARDS FOR RES USER 1.350 1.350 4.84 X 2.91 0.770 1.200 SO1 15 1.250 X 3.270 X 1 NO = 4.09 SQ.MT. 3.210 5.55 X 2.51 BED ROOM 10 FREE OF F.S.I.AREA = 20.00SQ.MT KITCHEN NAME AND SIGNATURE OF OWNER / APPLICANT 1.20 M CHAJJA 0.45 X 2.74 X 2.91 NURSING HOME B/UP AREA = 22.28 SQ.MT LESS - EXT. STAIRCASE AREA CALCULATION D1 0.600 X 1.250 X 2 NOS 1.50 SQ.MT. 3.70 1.83 X 2.91 4.130 3.82 X 3.14 BED ROOM 4.840 SHREE PRITESH DAMJI SAVLA COUNTED IN F.S.I.= 2.28 SQ.MT 2.43 X 2.25 1ST FLOOR 0.150 TOTAL DEDUCTION = 73.03 SQ.MT. 4.78 X 4.51 GLASS 4.130 4.600 SOCIETY OFFICE 4.640 FACADE 15 11 ST1 5.700 X 3.200 X 1 NO = 18.24 SQ.MT. TOTAL CONSTRUCTION AREA PER FLR = 135.83 SQ.MT. Y of M/s VINI DEVELOPERS 0.650 0.650 PRITESH Digitally 0.39 M CHAJJA signed 3.210 3.210 GLAZING 0.65 M CHAJJA 0.65 M CHAJJA 0.65 M CHAJJA GLASS DUCT 0.26 M CHAJJA ST2 0.230 X 1.390 X 1 NO = 0.32 SQ.MT. 14 SO2 by PRITESH 0.350 0.390 LESS - STAIRCASE AREA CALCULATION 0.759 0.390 0.390 2ND FLR BLDG. DAMJI DAMJI 0.35 M CHAJJA FACADE SAVLA DUCT 0.630 LINE ABOVE GLAZING ST3 0.370 X 1.460 X 1 NO = 0.54 SQ.MT. Date: 1.390 12 1ST FLOOR 0.230 0.35 M CHAJJA 14 13 0.760 ST4 1.830 X 1.310 X 1 NO = 2.40 SQ.MT. ST1 8.960 X 3.270 X 1 NO = 29.30 SQ.MT. SAVLA 2024.10.01 12:46:12 +05'30' 0.390 GLASS 13 12 0.230 C.A. TO OWNER FACADE 0.550 5.380 4.270 5.470 2.805 ST5 3.100 X 1.700 X 1 NO = 5.27 SQ.MT. ST2 0.900 X 3.420 X 1 NO = 3.08 SQ.MT. 0.550 GLAZING 0.390 5.380 4.270 5.470 9.910 2.730 2.890 18.475 10.060 2.730 2.890 TOTAL EXT. STAIRCASE AREA PER FL. (1ST FLOOR) = 26.77 SQ.MT. TOTAL STAIRCASE AREA PER FL. (1ST FLOOR) = 32.38 SQ.MT. 15.670 15.530 15.680 JOB NO. LINE DIAG. FOR 1ST FLOOR LESS - STAIRCASE LOBBY AREA CALCULATION LINE DIAG. FOR 1ST FLOOR LESS - SOCIETY OFFICE AREA CALCULATION DRAWN BY TAWAKKAL DATE 27.09.2024 1ST FLOOR PLAN (WING A & B) AREA CALC. NURSING HOME(WING - A) 1ST FLOOR 1ST FLOOR CHECKED BY DEEPAK A. SCALE - 1 : 100 STL1 2.100 X 1.750 X 2 NOS = 7.35 SQ.MT. AREA CALC. (WING - B) SO1 4.990 X 1.350 X 1 NO = 6.74 SQ.MT. NORTH SCALE AS SHOWN NAME, ADDRESS AND SIGNATURE OF ARCHITECT SCALE - 1 : 100 STL2 1.650 X 3.110 X 1 NO = 5.13 SQ.MT. SCALE - 1 : 100 SO2 4.840 X 3.210 X 1 NO = 15.54 SQ.MT. TOTAL SOCIETY OFFICE AREA PER FL. (1ST FLOOR) = 22.28 SQ.MT. AR. UJWAL SATISH BHOLE STL3 4.400 X 3.270 X 1 NO = 14.39 SQ.MT. CA / 2010 / 47919 UJWAL Digitally signed TOTAL STAIRCASE AREA PER FL. (1ST FLOOR) = 26.87 SQ.MT. NET BUILT UP AREA = 81.17 SQ.MT. N by UJWAL SATISH NET BUILT UP AREA OF 1ST FLOOR = 145.93 SQ.MT. u b a r c h i t e c t s SATISH BHOLE 602 - B, Sarvoday 11, Kher Nagar, Date: 2024.09.27 BHOLE Bandra (East), Mumbai- 400051. www.ubarchitects.in 16:04:47 +05'30' P-8881/2021/(260/A AND OTHER)/K/E WARD/MOGRA 3/7 BUILT UP AREA CALCULATION THIS PLAN IS DIGITALLY SIGNED AND PHYSICAL SIGH IS NOT REQUIRED 6TH & 7TH FLOOR APPROVED SUBJECT TO CONDITIONS MENTIONED IN THIS OFFICE LETTER UNDER P-8881/2021/(260 A And Other)/K/E Ward/MOGRA Dated : 08.10.2024 A 31.200 X 15.170 X 1 NO = 473.30 SQ.MT. TOTAL ADDITION = 473.30 SQ.MT. 31.200 5.930 4.270 2.660 2.810 1.980 5.950 1.880 2.900 2.820 DEDUCTIONS 3 0.350 7 0.350 0.760 31.200 1.000 1.000 1.000 1.000 1 2 4 6 8 1 4.270 X 0.760 X 2 NOS = 6.49 SQ.MT. 1.390 5.930 4.270 2.660 2.810 1.980 5.950 1.880 2.900 2.820 5 0.25 M CHAJJA 2 2.660 X 1.000 X 1 NO = 2.66 SQ.MT. 0.250 BLDG. LINE ABOVE BLDG. LINE ABOVE BLDG. LINE ABOVE 0.350 0.650 0.35 M CHAJJA 1.110 0.240 0.450 0.450 3.200 3 2.810 X 0.350 X 1 NO = 0.98 SQ.MT. 0.760 S.S. 0.45 M CHAJJA 0.45 M CHAJJA 0.450 0.690 0.390 0.650 0.650 0.450 DUCT 0.45 M CHAJJA 4 1.980 X 1.000 X 2 NOS = 3.96 SQ.MT. 0.750 0.69 M CHAJJA 0.36 M CHAJJA 0.45 M CHAJJA 0.45 M CHAJJA 0.63 M CHAJJA 0.390 0.75 M CHAJJA 0.75 M CHAJJA BED ROOM 5 5.950 X 1.390 X 2 NOS = 16.54 SQ.MT. 3.200 3.45 X 2.90 KITCHEN 0.400 1.95 X 3.00 TOILET BED ROOM 5.030 1.20 X 2.09 6 1.880 X 1.000 X 1 NO = 1.88 SQ.MT. BED ROOM 2.46 X 2.90 KITCHEN KITCHEN 1.460 BED ROOM 2.43 X 2.90 0.450 2.90 X 3.14 1.83 X 2.40 1.83 X 2.40 17 7 2.900 X 0.350 X 1 NO = 1.02 SQ.MT. BED ROOM BED ROOM 2.74 X 3.40 2.74 X 3.40 3.670 8 2.820 X 1.000 X 1 NO = 2.82 SQ.MT. LIVING 5.030 LIVING 0.750 1.750 0.400 TOILET PASSAGE 2.90 X 4.26 2.270 2.270 1.31 X 2.90 X 4.26 ST1 DUCT 9 2.270 X 0.600 X 3 NOS = 4.09 SQ.MT. 1.460 S.S. 2.00 X 1.21 1.95 X 1.21 1.45 X 9.00 1.250 0.600 1.250 0.600 0.90 1.00 X PASSAGE PASSAGE 1.00 X 0.90 2.98 X 1.00 RERA CARPET AREA RERA CARPET AREA 2.98 X 1.00 1.00 0.600 9 0.600 9 1.200 0.73 X 2.25 0.73 X 2.25 = 46.75 SQ.MT = 46.77 SQ.MT 10 1.670 X 1.250 X 3 NOS = 6.26 SQ.MT. 1.420 C.B. C.B. C.B. C.B. 1.670 1.670 5.976 2.150 9.860 2.300 1.250 1.250 LIFT 1.49 X 0.60 0.68 X 0.68 X 1.49 X 0.50 11 2.270 X 1.070 X 2 NOS = 4.86 SQ.MT. 0.350 1.940 X 1.520 TOILET 0.50 TOILET 603 & 703 TOILET 0.50 TOILET D1 10 D1 10 2.00 X 1.10 604 & 704 2.00 X 1.10 1.100 0.750 0.750 0.750 0.750 2.00 X 1.10 EXISTING MEMBER 2.00 X 1.10 0.830 DUCT S.S. DUCT 3 4 EXISTING MEMBER DUCT S.S. DUCT CHOWK 12 2.300 X 3.110 X 1 NO = 7.15 SQ.MT. LIVING F.R.D. F.R.D. 2.270 2.270 3.110 15.170 5.850 3.259 1.070 3.270 3.270 1.070 5.18 X 3.00 2.270 2.150 18 ST2 11 A 20 ST4 11 12 13 2.890 X 1.000 X 1 NO = 2.89 SQ.MT. 1.790 2.000 2.030 F.D. 3.000 2.000 2.030 0.600 RERA AREA F.D. 0.950 2.270 2.300 0.600 15.170 = 53.27 SQ.MT 5.820 1.500 0.950 LIFT 1.580 F.R.D. 14 2.730 X 0.350 X 1 NO = 0.96 SQ.MT. 0.75 M CHAJJA EXISTING MEMBER 1 WING-A UP 0.450 2.22 X 1.440 UP 0.450 ST. CASE & 1.670 ST. CASE & 1.670 3.270 1.100 1.100 3.110 WING-B 1.250 0.600 1.250 601 (SALE), 701 LIFT & PASS. D2 19 LIFT & PASS. D1 10 13.170 LOBBY CHOWK 15 4.710 X 0.760 X 1 NO = 3.58 SQ.MT. 5.850 1.070 3.270 3.270 3.270 3.110 LOBBY 6.770 1.42 X 6.77 0.110 OPEN TO SKY 3.00 X 3.27 0.110 2.270 F.R.D. (SALE) 0.600 3.670 16 2.740 X 1.390 X 1 NO = 3.81 SQ.MT. 2 1.500 9 1.580 DN 4.420 LIFT DN 1.761 0.450 0.450 1.100 2.22 X 1.440 17 0.400 X 1.460 X 2 NOS = 1.17 SQ.MT. E.D.0.950 E.D. 0.950 2.270 2.300 0.400 ST3 LIVING 18 0.750 X 5.850 X 1 NO = 4.39 SQ.MT. 0.750 0.830 5.25 X 3.00 F.R.D. F.R.D. 702 2 1 EXISTING MEMBER 1.460 0.750 RERA AREA TOILET TOILET EXISTING MEMBER TOILET DUCT S.S. DUCT TOILET 17 19 1.670 X 1.100 X 1 NO = 1.84 SQ.MT. = 53.44 SQ.MT LIFT 2.00 X 1.10 5.030 0.73 X 2.25 2.13 X 1.10 2.14 X 1.10 0.73 X 2.15 0.350 1.940 X 1.520 2.00 X 1.25 602 (SALE) C.B. 1.92 X 1.20 0.68 X C.B. 20 2.150 X 3.270 X 1 NO = 7.03 SQ.MT. 0.50 1.49 X 0.60 1.420 1.200 PASSAGE PASSAGE D1 0.600 X 1.250 X 3 NOS 2.25 SQ.MT. 1.460 0.31 X DUCT TOILET 1.31 X 3.67 X 9.00 2.98 X 1.00 S.S. PASSAGE 0.90 LIVING LIVING 1.00 X 9.00 5.030 0.400 2.00 X 1.21 0.90 1.95 X 1.21 1.35 X 9.00 2.90 X 4.26 2.90 X 4.26 D2 0.600 X 1.100 X 1 NO 0.66 SQ.MT. 3.200 BED ROOM RERA CARPET AREA RERA CARPET AREA 2.74 X 3.01 = 46.75 SQ.MT BED ROOM TOTAL DEDUCTION = 87.29 SQ.MT. KITCHEN = 47.04 SQ.MT 2.74 X 3.30 0.400 KITCHEN BED ROOM BED ROOM 1.83 X 2.74 1.83 X 2.01 = 386.01 SQ.MT. TOILET TOTAL CONSTRUCTION AREA PER FLR 0.390 1.390 1.390 2.90 X 3.14 2.43 X 2.59 BED ROOM 16 5 1.000 1.000 1.20 X 2.09 0.760 0.760 0.45 M CHAJJA KITCHEN 2.43 X 2.90 4 13 1 15 3.200 0.350 BED ROOM 1.95 X 3.00 14 LESS - STAIRCASE AREA CALCULATION 3.45 X 2.90 0.630 0.630 0.630 0.650 4.270 2.740 4.710 5.950 1.980 2.730 2.890 0.980 0.89 M CHAJJA 0.65 M CHAJJA 5.930 6TH & 7TH FLOOR 0.650 0.650 0.35 M CHAJJA 0.39 M CHAJJA 0.760 DUCT 0.35 M CHAJJA 0.26 M CHAJJA 0.65 M CHAJJA 31.200 ST1 3.670 X 1.750 X 1 NO = 6.42 SQ.MT. 0.355 1.110 S.S. 0.45 M CHAJJA 0.35 M CHAJJA ST2 5.976 X 3.260 X 1 NO = 19.48 SQ.MT. 5.930 4.270 2.740 4.710 5.950 1.980 2.730 2.890 31.200 LINE DIAG. FOR 6TH & 7TH FLOOR AREA CALC.(WING - A&B ) ST3 3.670 X 1.761 X 1 NO = 6.46 SQ.MT. ST4 9.860 X 3.270 X 1 NO = 32.24 SQ.MT. SCALE - 1 : 100 TOTAL STAIRCASE AREA PER FL.(6TH & 7TH FLR.) = 64.60 SQ.MT. 6TH & 7TH FLOOR PLAN (WING A & B) NET BUILT UP AREA 6TH & 7TH FLOOR = 321.41 SQ.MT. SCALE - 1 : 100 31.200 5.930 4.270 2.660 2.810 1.980 5.950 1.880 2.900 2.820 BUILT UP AREA CALCULATION 0.25 M CHAJJA 0.250 5TH FLOOR 0.350 0.650 0.35 M CHAJJA 1.110 0.240 0.450 0.450 0.760 S.S. 0.45 M CHAJJA 0.45 M CHAJJA 0.390 A 31.200 X 15.170 X 1 NO = 473.30 SQ.MT. 0.450 0.690 0.650 0.650 0.450 DUCT 0.45 M CHAJJA 31.200 0.750 0.69 M CHAJJA 0.36 M CHAJJA 0.45 M CHAJJA 0.45 M CHAJJA 0.63 M CHAJJA TOTAL ADDITION = 473.30 SQ.MT. X 0.390 0.75 M CHAJJA 0.75 M CHAJJA BED ROOM 5.930 4.270 2.660 2.810 1.980 5.950 1.880 2.900 2.820 3.200 3.45 X 2.90 DEDUCTIONS 0.350 0.350 KITCHEN 3 7 0.760 1.95 X 3.00 TOILET BED ROOM 1.000 1.000 1.000 1.000 1.20 X 2.09 1 2 4 6 8 1 4.270 X 0.760 X 2 NOS = 6.49 SQ.MT. 1.390 BED ROOM 2.46 X 2.90 BED ROOM 2.43 X 2.90 KITCHEN KITCHEN 5 2.90 X 3.14 1.83 X 2.40 1.83 X 2.40 0.450 2 2.660 X 1.000 X 1 NO = 2.66 SQ.MT. BED ROOM BED ROOM 2.74 X 3.40 LIVING 2.74 X 3.40 3.200 3 2.810 X 0.350 X 1 NO = 0.98 SQ.MT. 5.030 LIVING 0.400 TOILET PASSAGE 2.90 X 4.26 2.90 X 4.26 1.31 X 1.460 DUCT S.S. 2.00 X 1.21 1.95 X 1.21 1.45 X 9.00 4 1.980 X 1.000 X 2 NOS = 3.96 SQ.MT. 0.90 1.00 X PASSAGE PASSAGE 1.00 X 0.90 RERA CARPET AREA RERA CARPET AREA 1.00 1.200 2.98 X 1.00 2.98 X 1.00 0.73 X 2.25 0.73 X 2.25 = 46.75 SQ.MT = 46.77 SQ.MT 1.420 C.B. C.B. 0.400 5 5.950 X 1.390 X 2 NOS = 16.54 SQ.MT. C.B. C.B. LIFT 0.68 X 0.68 X 5.030 1.49 X 0.60 0.50 1.49 X 0.50 0.350 1.940 X 1.520 TOILET 0.50 TOILET 503 TOILET TOILET 6 1.880 X 1.000 X 1 NO = 1.88 SQ.MT. 1.460 2.00 X 1.10 504 2.00 X 1.10 1.100 0.750 0.750 0.750 0.750 2.00 X 1.10 EXISTING MEMBER 2.00 X 1.10 0.830 DUCT S.S. DUCT 3 4 EXISTING MEMBER DUCT S.S. DUCT 17 LIVING F.R.D. F.R.D. 7 2.900 X 0.350 X 1 NO = 1.02 SQ.MT. 5.18 X 3.00 2.270 2.150 3.670 1.790 2.000 2.030 F.D. 3.000 2.000 2.030 8 2.820 X 1.000 X 1 NO = 2.82 SQ.MT. F.D. 0.950 2.270 2.300 0.750 1.750 RERA AREA 1.580 5.820 LIFT 2.270 2.270 1.500 0.950 = 53.27 SQ.MT ST1 F.R.D. 0.75 M CHAJJA UP UP 3.110 0.450 0.450 2.22 X 1.440 9 2.270 X 0.600 X 3 NOS = 4.09 SQ.MT. 1.250 0.600 1.250 0.600 (SALE) 1 WING-A WING-B 3.270 0.600 9 0.600 9 13.170 LOBBY CHOWK 5.850 6.770 1.070 3.270 3.270 3.270 3.110 LOBBY 10 1.670 X 1.250 X 3 NOS = 6.26 SQ.MT. 0.110 1.670 1.670 1.42 X 6.77 OPEN TO SKY 3.00 X 3.27 0.110 5.976 2.150 9.860 2.300 F.R.D. 1.250 1.250 (SALE) 0.600 D1 10 D1 10 2 11 2.270 X 1.070 X 2 NOS = 4.86 SQ.MT. 1.500 1.580 DN 0.450 4.420 LIFT DN 0.450 1.100 CHOWK 2.22 X 1.440 E.D. 0.950 E.D. 0.950 2.270 2.270 12 2.300 X 3.110 X 1 NO = 7.15 SQ.MT. 3.110 15.170 2.270 2.300 5.850 3.259 1.070 3.270 3.270 1.070 LIVING 18 ST2 11 A 20 ST4 11 12 0.600 13 2.890 X 1.000 X 1 NO = 2.89 SQ.MT. 0.830 5.25 X 3.00 0.600 0.750 502 (SALE) F.R.D. F.R.D. 15.170 RERA AREA TOILET TOILET 2 1 EXISTING MEMBER TOILET DUCT S.S. DUCT 0.750 = 53.44 SQ.MT LIFT 2.00 X 1.10 TOILET ST. CASE & 1.670 ST. CASE & 1.670 14 2.730 X 0.350 X 1 NO = 0.96 SQ.MT. 0.73 X 2.25 2.13 X 1.10 2.14 X 1.10 1.100 1.100 0.73 X 2.15 2.00 X 1.25 1.92 X 1.20 1.250 0.600 1.250 0.350 1.940 X 1.520 LIFT & PASS. D2 19 C.B. 0.68 X C.B. 1.49 X 0.60 LIFT & PASS. D1 10 15 4.710 X 1.000 X 1 NO = 4.71 SQ.MT. 0.50 1.200 1.420 PASSAGE 2.270 PASSAGE 3.670 1.460 0.31 X 16 2.740 X 1.390 X 1 NO = 3.81 SQ.MT. DUCT TOILET 1.31 X 3.67 X 9.00 2.98 X 1.00 9 S.S. PASSAGE 0.90 LIVING LIVING 1.00 X 9.00 5.030 1.761 2.00 X 1.21 0.90 1.95 X 1.21 1.35 X 9.00 0.400 2.90 X 4.26 2.90 X 4.26 ST3 17 0.400 X 1.460 X 2 NOS = 1.17 SQ.MT. BED ROOM RERA CARPET AREA RERA CARPET AREA 0.400 2.74 X 3.01 = 46.75 SQ.MT BED ROOM KITCHEN = 45.98 SQ.MT 2.74 X 3.30 18 0.750 X 5.850 X 1 NO = 4.39 SQ.MT. 0.400 KITCHEN 1.460 BED ROOM BED ROOM 1.83 X 2.50 1.83 X 2.01 TOILET 17 0.390 19 1.670 X 1.100 X 1 NO = 1.84 SQ.MT. 0.390 0.390 2.90 X 3.14 2.43 X 2.35 BED ROOM 5.030 1.20 X 2.09 0.45 M CHAJJA KITCHEN 2.43 X 2.90 3.200 BED ROOM 1.95 X 3.00 20 2.150 X 3.270 X 1 NO = 7.03 SQ.MT. 3.45 X 2.90 0.630 0.650 0.650 D1 0.600 X 1.250 X 3 NOS 2.25 SQ.MT. 0.980 0.65 M CHAJJA 0.89 M CHAJJA 0.650 0.650 0.35 M CHAJJA 0.39 M CHAJJA 0.760 DUCT 0.35 M CHAJJA 0.59 M CHAJJA 0.59 M CHAJJA D2 0.600 X 1.100 X 1 NO 0.66 SQ.MT. 0.355 1.110 3.200 S.S. BLDG. LINE ABOVE 0.45 M CHAJJA 0.35 M CHAJJA TOTAL DEDUCTION = 88.42 SQ.MT. 5.930 4.270 2.740 4.710 5.950 1.980 2.730 2.890 = 384.88 SQ.MT. 1.390 1.390 TOTAL CONSTRUCTION AREA PER FLR 16 5 1.000 1.000 1.000 31.200 0.760 1 15 4 13 14 0.350 LESS - STAIRCASE AREA CALCULATION 5.930 4.270 2.740 4.710 5.950 1.980 2.730 2.890 5TH FLOOR 31.200 5TH FLOOR PLAN (WING A & B) ST1 3.670 X 1.750 X 1 NO = 6.42 SQ.MT. ST2 5.976 X 3.260 X 1 NO = 19.48 SQ.MT. SCALE - 1 : 100 LINE DIAG. FOR 5TH FLOOR AREA CALC.(WING - A&B ) ST3 3.670 X 1.761 X 1 NO = 6.46 SQ.MT. SCALE - 1 : 100 ST4 9.860 X 3.270 X 1 NO = 32.24 SQ.MT. TOTAL STAIRCASE AREA PER FL. (5TH FLOOR) = 64.60 SQ.MT. NET BUILT UP AREA 5TH FLOOR = 320.28 SQ.MT. BUILT UP AREA CALCULATION 4TH FLOOR PLAN FOR APPROVAL A 31.200 X 15.170 X 1 NO = 473.30 SQ.MT. TOTAL ADDITION = 473.30 SQ.MT. X 5.930 4.270 2.660 2.810 31.200 1.980 5.950 1.880 2.900 2.820 DEDUCTIONS 1 4.270 X 0.760 X 2 NOS = 6.49 SQ.MT. SHAIKH ASIF MUSA 31.200 0.350 0.350 5.930 4.270 2.660 2.810 1.980 5.950 1.880 2.900 2.820 3 7 0.760 SHIVADA Digitally signed by SHIVADAS 2 2.660 X 1.390 X 1 NO = 3.70 SQ.MT. Digitally signed by GAURAV 1.000 1.000 1 1.150 KRISHNA GURAV 0.25 M CHAJJA GAURAV SHASHIKANT KHANOLKAR 4 6 8 0.250 1.390 1.390 BLDG. LINE ABOVE DN: c=IN, o=MUNICIPAL 0.800 DN: c=IN, o=BRIHANMUMBAI 0.350 0.35 M CHAJJA 2 5 0.240 0.450 0.450 MUNICIPAL CORPORATION, ou=SUB CORPORATION OF GREATER 3 2.810 X 0.350 X 1 NO = 0.98 SQ.MT. 1.110 BLDG. LINE ABOVE SHASHIKAN S ENGINEER, MUMBAI, ou=BUILDING PROPOSAL, 0.760 S.S. 0.45 M CHAJJA 0.45 M CHAJJA 2.5.4.20=8c143ecc232f95bdc25706be Digitally signed by SHAIKH ASIF MUSA 0.450 0.240 7607c588de9d1a8a85f7d9e9187a60d 2.5.4.20=a9ef4109d1f0761f647894 0.650 0.650 DN: c=IN, o=BRIHANMUMBAI MUNICIPAL T e29ced457, postalCode=400093, d6fd84126d0ede3dafb9753314181 0.450 3.200 DUCT 0.45 M CHAJJA 4 1.980 X 1.000 X 1 NOS = 1.98 SQ.MT. 1.080 st=MAHARASHTRA, CORPORATION, ou=BUILDING PROPOSAL, bb98565ed0ff5, 0.750 1.08 M CHAJJA KRISHNA 0.36 M CHAJJA 0.45 M CHAJJA serialNumber=306a422c7a07a0e0c3c 0.45 M CHAJJA 0.51 M CHAJJA 2.5.4.20=dc538dee2bc8ae44a2a24206efc4ca6d9817f postalCode=400093, 0.390 KHANOLKAR eaf442717d29556810ebb9fbad36ca4 0.75 M CHAJJA 0.75 M CHAJJA 0701bd2f1ba899, cn=GAURAV st=Maharashtra, BED ROOM 4a 1.980 X 1.150 X 1 NOS = 2.28 SQ.MT. SHASHIKANT KHANOLKAR 07e6c4eed02678a87124ebb3c56, st=Maharashtra, serialNumber=7AC5A48B02E3E2AE 3.200 Date: 2024.10.01 13:57:54 +05'30' serialNumber=e673174400a2a913c86f1019b5be280 CF71E43FB159DB02A161EAC2FEF6 3.45 X 2.90 GURAV KITCHEN 24d407841b387a179d59e11e669bc8900, E75C1B69B3F1D29DD1C4, 1.95 X 3.00 TOILET BED ROOM 5 5.950 X 1.390 X 2 NOS = 16.54 SQ.MT. cn=SHAIKH ASIF MUSA cn=SHIVADAS KRISHNA GURAV 1.20 X 2.09 BED ROOM 2.46 X 2.90 0.400 Date: 2024.10.01 15:55:12 +05'30' Date: 2024.10.08 18:00:24 +05'30' BED ROOM KITCHEN KITCHEN 2.43 X 2.90 6 1.880 X 1.000 X 1 NO = 1.88 SQ.MT. 5.030 0.450 2.90 X 3.14 1.83 X 2.25 1.83 X 2.40 S. E. ( B. P. ) K/E-C A. E. ( B. P. ) K/E E. E. ( B. P. ) K/E 1.460 BED ROOM BED ROOM 7 2.900 X 0.350 X 1 NO = 1.02 SQ.MT. 2.74 X 3.01 2.74 X 3.40 17 LIVING 5.030 LIVING TOILET 0.400 1.460 S.S. DUCT 2.00 X 1.21 1.31 X 0.90 PASSAGE 1.95 X 1.21 1.45 X 9.00 1.00 X PASSAGE 2.90 X 4.26 2.90 X 4.26 PASSAGE 1.00 X 0.750 3.670 8 2.820 X 1.000 X 1 NO = 2.82 SQ.MT. PROFORMA 'B' 1.750 0.90 RERA CARPET AREA RERA CARPET AREA 1.00 2.270 2.270 2.98 X 1.00 ST1 9 2.270 X 0.600 X 2 NOS = 2.72 SQ.MT. 1.100 1.200 2.98 X 1.00 CONTENTS OF SHEET 0.73 X 2.25 0.73 X 2.25 = 44.05 SQ.MT = 46.77 SQ.MT 1.250 0.600 1.420 9a 9 LIFT C.B. 0.68 X C.B. 0.600 0.600 9a 2.270 X 1.100 X 1 NOS = 2.50 SQ.MT. 1.49 X 0.50 0.350 TOILET TOILET TOILET 0.50 TOILET 1.670 1.670 4TH TO 9TH FLOOR PLAN, TERRACE FLOOR PLAN, LINE DIAG. & CALC., SUMMARY 1.250 1.250 1.940 X 1.520 2.00 X 1.10 404 2.00 X 1.10 2.150 9.860 0.750 0.750 DUCT DUCT 2.00 X 1.10 2.00 X 1.10 5.976 2.300 10 1.670 X 1.250 X 3 NOS = 6.26 SQ.MT. OF BUILT UP AREA, LINE AREA DAIG. AREA UNDER ENCROACHMENT, & IN 0.830 1.250 1.250 1.250 S.S. 403 (SALE) 3 4 EXISTING MEMBER DUCT S.S. DUCT D1 10 D1 10 LIVING F.R.D. F.R.D. 5.18 X 3.00 11 2.270 X 1.070 X 2 NOS = 4.86 SQ.MT. ADVANCE POSSESSION (Y) (X) & Z CALC., ETC. 1.790 2.000 2.030 2.270 2.150 3.000 2.000 2.030 CHOWK 1.100 RERA AREA F.D. F.D. 0.950 2.270 2.300 2.270 2.270 15.170 3.110 1.580 5.850 3.259 3.270 3.270 5.820 1.070 1.070 LIFT 1.500 = 53.27 SQ.MT 0.950 12 2.300 X 3.110 X 1 NO = 7.15 SQ.MT. F.R.D. 18 ST2 11 A 20 ST4 11 12 0.75 M CHAJJA UP UP 3.110 0.450 0.450 2.22 X 1.440 0.600 EXISTING MEMBER 1 WING-A WING-B 3.270 0.600 15.170 13 2.890 X 1.000 X 1 NO = 2.89 SQ.MT. DESCRIPTION OF PROPOSAL & PROPERTY 401 13.170 LOBBY CHOWK 5.850 6.770 3.270 3.270 3.270 3.110 ST. CASE & 1.070 LOBBY 1.670 ST. CASE & 1.670 0.110 PROPOSED REDEVELOPMENT OF EXIST. RESIDENTIAL BUILDING KNOWN AS ROSE BLOSSOM 1.42 X 6.77 0.110 1.100 1.100 3.00 X 3.27 1.250 0.600 1.250 OPEN TO SKY LIFT & PASS. D2 19 LIFT & PASS. 14 2.730 X 0.350 X 1 NO = 0.96 SQ.MT. CHS. LTD. ON PLOT BEARING CTS NO. 260A OF VILLAGE MOGRA, K/E -WARD, NATWAR F.R.D. (SALE) 0.600 D1 10 2 1.500 1.580 NAGAR ROAD NO. 05, JOGESHWARI EAST, MUMBAI - 400 060. 4.420 LIFT 2.270 DN 0.450 DN 0.450 15 4.710 X 1.000 X 1 NO = 4.71 SQ.MT. 1.100 2.22 X 1.440 3.670 E.D. 0.950 E.D. 0.950 2.270 2.300 9 16 2.740 X 1.390 X 1 NO = 3.81 SQ.MT. 1.761 LIVING ST3 0.830 5.25 X 3.00 0.750 402 (SALE) F.R.D. F.R.D. 0.400 RERA AREA 2 1 EXISTING MEMBER TOILET DUCT S.S. DUCT 17 0.400 X 1.460 X 2 NOS = 1.17 SQ.MT. TOILET TOILET 0.750 = 53.44 SQ.MT LIFT 2.00 X 1.10 TOILET NAME AND SIGNATURE OF OWNER / APPLICANT 0.73 X 2.25 2.13 X 1.10 2.14 X 1.10 0.73 X 2.15 0.350 1.940 X 1.520 2.00 X 1.25 1.92 X 1.20 18 0.750 X 5.850 X 1 NO = 4.39 SQ.MT. 1.460 C.B. C.B. 17 SHREE PRITESH DAMJI SAVLA 0.68 X 1.49 X 0.60 5.030 0.50 1.200 1.420 PASSAGE 19 1.670 X 1.100 X 1 NO = 1.84 SQ.MT. PASSAGE 1.460 of M/s VINI DEVELOPERS 0.31 X DUCT TOILET 1.31 X 3.67 X 9.00 2.98 X 1.00 S.S. PASSAGE 0.90 LIVING LIVING 1.00 X 9.00 20 2.150 X 3.270 X 1 NO = 7.03 SQ.MT. 5.030 PRITESH Digitally 2.00 X 1.21 0.90 1.95 X 1.21 1.35 X 9.00 2.90 X 4.26 0.400 2.90 X 4.26 signed BED ROOM RERA CARPET AREA RERA CARPET AREA D1 0.600 X 1.250 X 3 NOS 2.25 SQ.MT. by PRITESH BED ROOM 0.400 2.74 X 3.01 KITCHEN = 45.98 SQ.MT = 46.75 SQ.MT KITCHEN 2.74 X 3.30 DAMJI DAMJI SAVLA 3.200 D2 0.600 X 1.100 X 1 NO 0.66 SQ.MT. 0.390 1.83 X 2.50 0.390 TOILET BED ROOM BED ROOM 1.83 X 2.01 Date: 2024.10.01 1.20 X 2.09 2.90 X 3.14 2.43 X 2.35 0.390 BED ROOM SAVLA 12:46:45 +05'30' 0.45 M CHAJJA KITCHEN 2.43 X 2.90 TOTAL DEDUCTION = 90.89 SQ.MT. 3.200 1.390 1.390 BED ROOM 1.95 X 3.00 16 5 3.45 X 2.90 0.760 1.000 4a 1.000 13 1.000 TOTAL CONSTRUCTION AREA PER FLR = 382.41 SQ.MT. C.A. TO OWNER 0.630 0.650 0.650 1 15 0.980 14 0.350 0.65 M CHAJJA 0.89 M CHAJJA 0.650 0.650 0.59 M CHAJJA 0.59 M CHAJJA 0.35 M CHAJJA 0.39 M CHAJJA 1.980 2.730 2.890 0.760 DUCT 0.35 M CHAJJA 5.930 4.270 2.740 4.710 5.950 LESS - STAIRCASE AREA CALCULATION JOB NO. 0.355 1.110 S.S. 0.45 M CHAJJA 31.200 4TH FLOOR 0.35 M CHAJJA DRAWN BY TAWAKKAL DATE 27.09.2024 5.930 4.270 2.740 4.710 5.950 1.980 2.730 2.890 ST1 3.670 X 1.750 X 1 NO = 6.42 SQ.MT. CHECKED BY DEEPAK A. 31.200 SCALE AS SHOWN LINE DIAG. FOR 4TH FLOOR AREA CALC.(WING - A&B ) ST2 5.976 X 3.260 X 1 NO = 19.48 SQ.MT. NORTH NAME, ADDRESS AND SIGNATURE OF ARCHITECT ST3 3.670 X 1.761 X 1 NO = 6.46 SQ.MT. SCALE - 1 : 100 AR. UJWAL SATISH BHOLE 4TH FLOOR PLAN (WING A & B) ST4 9.860 X 3.270 X 1 NO = 32.24 SQ.MT. CA / 2010 / 47919 UJWAL Digitally signed TOTAL STAIRCASE AREA PER FL. (4TH FLOOR) = 64.60 SQ.MT. SCALE - 1 : 100 N by UJWAL NET BUILT UP AREA 4TH FLOOR = 317.81 SQ.MT. u b a r c h i t e c t s SATISH SATISH BHOLE 602 - B, Sarvoday 11, Kher Nagar, Date: 2024.09.27 BHOLE Bandra (East), Mumbai- 400051. www.ubarchitects.in 16:05:04 +05'30' P-8881/2021/(260/A AND OTHER)/K/E WARD/MOGRA 4/7 0.503 THIS PLAN IS DIGITALLY SIGNED AND PHYSICAL SIGH IS NOT REQUIRED APPROVED SUBJECT TO CONDITIONS MENTIONED IN THIS OFFICE LETTER UNDER P-8881/2021/(260 A And Other)/K/E Ward/MOGRA Dated : 08.10.2024 1 22.490 LINE DIAG. FOR AREA CALC. OF AREA UNDER ENCROACHMENT SCALE 1:100 0.320 1 10.122 0.588 2 0.280 1 4.584 LINE DIAG. FOR AREA CALC. OF AREA IN ADVERSE POSSESSION (X) SCALE 1:100 17.260 S.S. 1.50 M. HIGH PARAPET WALL DUCT 1.50 M. HIGH PARAPET WALL 1.50 M. HIGH PARAPET WALL 1.50 M. HIGH PARAPET WALL 1.50 M. HIGH PARAPET WALL TERRACE OPEN TO SKY UP V (ABOVE 9TH FLOOR) S.S. DUCT LIFT MACHINE M. S. LADDER ROOM 1.50 M. HIGH PARAPET WALL LIFT SHAFT BELOW DUCT S.S. DUCT 1.50 M. HIGH PARAPET WALL F.D. F.D. OVER HEAD OVER HEAD TANK ABOVE STAIRCASE LIFT TANK ABOVE STAIRCASE MACHINE F.R.D. V ROOM CHOWK OPEN TO SKY TERRACE OPEN TO SKY (ABOVE 9TH FLOOR) DN LIFT SHAFT DN E.D. BELOW E.D. LIFT MACHINE 1.50 M. HIGH PARAPET WALL F.R.D. DUCT DUCT 1.50 M. HIGH PARAPET WALL ROOM UP LIFT SHAFT LINE DIAG. FOR AREA CALC. OF AREA IN ADVERSE POSSESSION (Z) BELOW M. S. LADDER M. S. LADDER SCALE 1:100 S.S. DUCT V UP TERRACE OPEN TO SKY (ABOVE 9TH FLOOR) 1.50 M. HIGH PARAPET WALL 1.50 M. HIGH PARAPET WALL 1.50 M. HIGH PARAPET WALL DUCT 1.50 M. HIGH PARAPET WALL S.S. TERRACE FLOOR PLAN (WING A & B) SCALE - 1 : 100 PLAN FOR APPROVAL BUILT UP AREA CALCULATION SHAIKH ASIF MUSA 8TH & 9TH FLOOR 31.200 SHIVADA Digitally signed by GAURAV 1 31.200 X 15.170 X 1 NO = 473.30 SQ.MT. GAURAV Digitally signed by SHIVADAS 0.110 SHASHIKANT KHANOLKAR 31.200 5.930 4.120 21.150 DN: c=IN, o=BRIHANMUMBAI MUNICIPAL CORPORATION, ou=SUB KRISHNA GURAV SHASHIKAN DN: c=IN, o=MUNICIPAL ENGINEER, 2.5.4.20=8c143ecc232f95bdc25706be7 2 TOTAL ADDITION = 473.30 SQ.MT. 0.250 Digitally signed by SHAIKH ASIF MUSA CORPORATION OF GREATER S 607c588de9d1a8a85f7d9e9187a60de2 4.120 21.150 0.760 5.930 T 9ced457, postalCode=400093, DN: c=IN, o=BRIHANMUMBAI MUNICIPAL MUMBAI, ou=BUILDING PROPOSAL, 1 st=MAHARASHTRA, serialNumber=306a422c7a07a0e0c3ce CORPORATION, ou=BUILDING PROPOSAL, 2.5.4.20=a9ef4109d1f0761f647894d 0.350 af442717d29556810ebb9fbad36ca407 6fd84126d0ede3dafb9753314181b KHANOLKAR 0.650 01bd2f1ba899, cn=GAURAV 2.5.4.20=dc538dee2bc8ae44a2a24206efc4ca6d98 KRISHNA b98565ed0ff5, postalCode=400093, 0.350 0.35 M CHAJJA 0.25 M CHAJJA SHASHIKANT KHANOLKAR 17f07e6c4eed02678a87124ebb3c56, st=Maharashtra, 1.110 0.30M CHAJJA 0.30M CHAJJA 0.30M CHAJJA 0.30M CHAJJA 0.30M CHAJJA DEDUCTIONS Date: 2024.10.01 13:58:10 +05'30' 0.760 S.S. st=Maharashtra, serialNumber=7AC5A48B02E3E2AE 3.200 CF71E43FB159DB02A161EAC2FEF6 serialNumber=e673174400a2a913c86f1019b5be2 GURAV E75C1B69B3F1D29DD1C4, DUCT 0.45 M CHAJJA 1 4.120 X 0.760 X 1 NO = 3.13 SQ.MT. 8024d407841b387a179d59e11e669bc8900, cn=SHIVADAS KRISHNA GURAV 0.45 M CHAJJA cn=SHAIKH ASIF MUSA Date: 2024.10.08 18:00:43 +05'30' Date: 2024.10.01 15:55:29 +05'30' BED ROOM 2 21.150 X 0.110 X 1 NO = 2.33 SQ.MT. 3.200 3.45 X 2.90 KITCHEN S. E. ( B. P. ) K/E-C TOILET 0.400 3 2.270 X 0.600 X 3 NOS = 4.09 SQ.MT. A. E. ( B. P. ) K/E E. E. ( B. P. ) K/E 5.920 1.95 X 3.00 BED ROOM 1.20 X 2.09 BED ROOM 2.46 X 3.14 BED ROOM KITCHEN KITCHEN 2.43 X 3.14 4 1.670 X 1.250 X 3 NOS = 6.26 SQ.MT. 2.90 X 3.14 1.83 X 3.29 1.83 X 3.29 PROFORMA 'B' BED ROOM LIVING LIVING BED ROOM 5.920 1.460 14 5 2.270 X 1.070 X 2 NOS = 4.86 SQ.MT. 2.74 X 4.29 2.90 X 5.54 2.90 X 5.54 2.74 X 4.29 3.670 CONTENTS OF SHEET 0.400 TOILET PASSAGE 6 2.300 X 3.110 X 1 NO = 7.15 SQ.MT. 1.31 X RERA AREA RERA AREA 1.460 DUCT 2.00 X 1.21 1.45 X 9.00 S.S. 1.95 X 1.21 0.750 4TH TO 9TH FLOOR PLAN, TERRACE FLOOR PLAN, LINE DIAG. & CALC., SUMMARY 1.750 0.90 PASSAGE = 55.58 SQ.MT = 55.58 SQ.MT 1.00 X 0.90 PASSAGE 1.00 X 0.90 ST1 2.270 2.270 1.200 2.98 X 1.00 2.98 X 1.00 7 2.890 X 1.000 X 1 NO = 2.89 SQ.MT. OF BUILT UP AREA, LINE AREA DAIG. AREA UNDER ENCROACHMENT, & IN 1.250 0.600 1.250 0.600 0.73 X 2.25 0.73 X 2.25 1.420 C.B. C.B. 0.600 3 0.600 3 C.B. LIFT C.B. 1.49 X 0.60 0.68 X 0.50 0.68 X 0.50 1.49 X 0.90 1.670 1.670 2.300 8 2.730 X 0.350 X 1 NO = 0.96 SQ.MT. ADVANCE POSSESSION (Y) (X) & Z CALC., ETC. 0.350 1.940 X 1.520 TOILET TOILET TOILET TOILET 2.150 9.860 1.250 1.250 EXISTING MEMBER 5.970 2.00 X 1.10 2.00 X 1.10 0.750 2.270 2.00 X 1.10 2.00 X 1.10 D1 4 D1 4 9 1.980 X 1.000 X 1 NO = 1.98 SQ.MT. 0.830 S.S. 0.75 M CHAJJA DUCT DUCT 804 DUCT DUCT 0.750 LIVING S.S. 803, 903 (SALE) 3 4 904 (SALE) 2.270 5.850 DESCRIPTION OF PROPOSAL & PROPERTY 5.18 X 3.00 F.R.D. F.R.D. 10 5.950 X 1.390 X 1 NO = 8.27 SQ.MT. RERA AREA 1.670 2.150 2.270 2.270 1.250 1.250 1.790 2.000 2.030 3.000 2.000 2.030 1.670 2.300 15.170 F.D. F.D. PROPOSED REDEVELOPMENT OF EXIST. RESIDENTIAL BUILDING KNOWN AS ROSE BLOSSOM 15.170 5.850 3.270 1.070 3.270 3.270 1.070 3.110 = 53.27 SQ.MT 5.820 1.500 0.950 3.820 LIFT 7.030 1.580 0.950 3.970 15 ST2 5 17 ST3 5 6 11 4.710 X 0.760 X 1 NO = 3.58 SQ.MT. F.R.D. CHS. LTD. ON PLOT BEARING CTS NO. 260A OF VILLAGE MOGRA, K/E -WARD, NATWAR UP 0.450 UP 0.450 0.600 0.600 14.060 2.22 X 1.440 EXISTING MEMBER 1 WING-A WING-B 801, 901 (SALE) LOBBY 3.110 3.270 ST. CASE & 1.670 ST. CASE & 1.670 12 2.740 X 1.390 X 1 NO = 3.81 SQ.MT. NAGAR ROAD NO. 05, JOGESHWARI EAST, MUMBAI - 400 060. 1.070 3.270 1.070 4.420 LOBBY 6.770 1.100 1.100 1.250 0.600 1.250 1.42 X 6.77 0.110 3.00 X 3.27 0.110 LIFT3.670 & PASS. D2 16 LIFT & PASS. D1 4 3.110 CHOWK 13 4.270 X 0.760 X 1 NO = 3.25 SQ.MT. F.R.D. (SALE) 0.75 M CHAJJA 2 2.270 1.500 1.580 DN 0.450 OPEN TO SKY LIFT DN 0.450 14 0.400 X 1.460 X 2 NOS = 1.17 SQ.MT. 1.100 0.600 1.250 2.22 X 1.440 3 E.D. 0.950 E.D. 0.950 NAME AND SIGNATURE OF OWNER / APPLICANT 1.750 2.270 2.300 15 0.750 X 5.850 X 1 NO = 4.39 SQ.MT. LIVING ST1 0.400 5.25 X 3.00 RERA AREA TOILET 902 (SALE) F.R.D. 2 F.R.D. 1 EXISTING 801, 901 TOILET DUCT S.S. 0.830 DUCT 16 1.670 X 1.100 X 1 NO = 1.84 SQ.MT. SHREE PRITESH DAMJI SAVLA LIFT TOILET 802 MEMBER TOILET = 53.44 SQ.MT EXISTING MEMBER 2.00 X 1.10 1.460 of M/s VINI DEVELOPERS 0.73 X 2.25 2.13 X 1.10 2.14 X 1.10 0.73 X 2.15 0.350 1.940 X 1.520 2.00 X 1.25 C.B. 1.92 X 1.20 14 17 2.150 X 3.270 X 1 NO = 7.03 SQ.MT. C.B. 5.030 0.68 X PRITESH Digitally 0.50 1.49 X 0.60 1.420 signed 1.200 PASSAGE D1 0.600 X 1.250 X 3 NOS 2.25 SQ.MT. PASSAGE by PRITESH 1.460 0.31 X S.S. DUCT TOILET 1.31 X PASSAGE 0.90 3.67 X 9.00 2.98 X 1.00 1.00 X 9.00 D2 0.600 X 1.100 X 1 NO 0.66 SQ.MT. DAMJI DAMJI SAVLA 5.030 2.00 X 1.21 0.90 1.95 X 1.21 1.35 X 9.00 Date: 2024.10.01 0.400 BED ROOM 2.74 X 3.01 LIVING 2.90 X 4.26 LIVING BED ROOM TOTAL DEDUCTION = 69.90 SQ.MT. SAVLA 12:47:07 +05'30' 2.90 X 4.26 3.200 KITCHEN KITCHEN 2.74 X 3.30 TOILET BED ROOM BED ROOM 1.83 X 2.74 RERA CARPET AREA = 47.04 SQ.MT RERA CARPET AREA = 46.75 SQ.MT 1.83 X 2.01 TOTAL BUILT UP AREA [X - Y1] = 403.40 SQ.MT. C.A. TO OWNER 0.350 1.20 X 2.09 2.90 X 3.14 2.43 X 2.59 BED ROOM KITCHEN 0.45 M CHAJJA 2.43 X 2.90 3.200 BED ROOM 12 1.390 10 1.390 1.000 1.000 1.95 X 3.00 0.760 0.760 3.45 X 2.90 9 7 STAIRCASE AREA CALCULATION JOB NO. 13 11 0.630 0.650 0.98 M CHAJJA 8 0.980 0.65 M CHAJJA 0.65 M CHAJJA 0.390 TAWAKKAL 27.09.2024 8TH & 9TH FLOOR DRAWN BY DATE 0.450 0.350 0.35 M CHAJJA 0.39 M CHAJJA 4.270 2.740 4.710 5.950 1.980 2.730 2.890 0.390 DUCT 0.35 M CHAJJA 0.26 M CHAJJA 0.26 M CHAJJA 5.930 0.630 DEEPAK A. CHECKED BY 1.110 ST1 3.670 X 1.750 X 2 NOS = 12.85 SQ.MT. SCALE AS SHOWN 0.355 31.200 0.650 S.S. 0.630 0.45 M CHAJJA 0.35 M CHAJJA 0.350 0.25 M CHAJJA 0.650 ST2 5.970 X 3.270 X 1 NO = 19.52 SQ.MT. NORTH NAME, ADDRESS AND SIGNATURE OF ARCHITECT 5.930 4.270 2.740 4.710 5.950 1.980 2.730 2.890 ST3 9.860 X 3.270 X 1 NO = 32.24 SQ.MT. 0.250 AR. UJWAL SATISH BHOLE 31.200 LINE DIAG. FOR 8TH & 9TH FLOOR AREA CALC. (WING - B) TOTAL STAIRCASE AREA PER FL.(8TH & 9TH FLR.) = 64.61 SQ.MT. CA / 2010 / 47919 SCALE - 1 : 100 NET BUILT UP AREA PER FLOOR = 338.79 SQ.MT. N UJWAL Digitally signed by UJWAL 8TH & 9TH FLOOR PLAN (WING A & B) u b a r c h i t e c t s SATISH SATISH BHOLE 602 - B, Sarvoday 11, Kher Nagar, Date: 2024.09.27 SCALE - 1 : 100 BHOLE Bandra (East), Mumbai- 400051. www.ubarchitects.in 16:05:21 +05'30' 2.000 2.570 4.680 1.100 P-8881/2021/(260/A AND OTHER)/K/E WARD/MOGRA 5/7 RERA CARPET AREA STATEMENT 5.550 THIS PLAN IS DIGITALLY SIGNED AND PHYSICAL SIGH IS NOT REQUIRED 0.760 FLAT NO. 3 & 4, (8TH & 9TH FLR.) (WING -B) 7 1 1.10 X 5.69 X 1 NO = 6.26 SQ.MT. APPROVED SUBJECT TO CONDITIONS MENTIONED IN THIS OFFICE LETTER UNDER RERA CARPET AREA STATEMENT P-8881/2021/(260 A And Other)/K/E Ward/MOGRA Dated : 08.10.2024 5.930 3.970 2 4.68 X 5.54 X 1 NO = 25.93 SQ.MT. 2.140 8 FLAT NO. 1, (2ND TO 9TH FLR.) (WING -A) 4.790 3 2.57 X 4.79 X 1 NO = 12.31 SQ.MT. 3.140 3 5.540 5.540 5.690 12 7 5.550 X 0.760 X 1 NO = 4.22 SQ.MT. 4 2 1 4 2.00 X 5.54 X 1 NO = 11.08 SQ.MT. 8 5.930 X 2.140 X 1 NO = 12.69 SQ.MT. 5.530 TOTAL ADDITION = 55.58 SQ.MT. X 9 1.310 9 5.530 X 1.310 X 1 NO = 7.24 SQ.MT. 10 5.180 X 2.050 X 1 NO = 10.62 SQ.MT. 5.180 11 5.480 X 1.100 X 1 NO = 6.03 SQ.MT. 10 2.050 12 3.970 X 3.140 X 1 NO = 12.47 SQ.MT. RERA CARPET AREA DIAGRAM TOTAL ADDITION = 53.27 SQ.MT. X 5.480 (8TH & 9THTH FLOOR WING - B) 11 1.100 (FLAT -3 & 4) SCALE : 1.100 RERA CARPET AREA DIAGRAM 2.460 (2ND FLOOR WING - A) 6 0.650 (FLAT -1) RERA CARPET AREA STATEMENT SCALE : 1.100 2.730 2.570 2.000 FLAT NO. 4, (4TH TO 7TH FLR.) (WING -B) 1.100 1.950 1 1.10 X 4.41 X 1 NO = 4.85 SQ.MT. 2 1.95 X 4.26 X 1 NO = 8.31 SQ.MT. 4 3.900 4.650 4.650 4.260 3 5 4.410 3 2.73 X 4.65 X 1 NO = 12.69 SQ.MT. 1 2 4 2.57 X 3.90 X 1 NO = 10.02 SQ.MT. 5.480 5 2.00 X 4.65 X 1 NO = 9.30 SQ.MT. 11 1.100 6 2.46 X 0.65 X 1 NO = 1.60 SQ.MT. 5.250 TOTAL ADDITION = 46.77 SQ.MT. X RERA CARPET AREA STATEMENT 13 2.050 FLAT NO. 2, (2ND TO 9TH FLR.) (WING -A) RERA CARPET AREA DIAGRAM (4TH TO 7TH FLOOR WING - B) 7 5.550 X 0.760 X 1 NO = 4.22 SQ.MT. 9.250 1.100 5.600 (FLAT -4) 11 5.480 X 1.100 X 1 NO = 6.03 SQ.MT. 1.310 14 SCALE : 1.100 RERA CARPET AREA STATEMENT 3.900 13 5.250 X 2.050 X 1 NO = 10.76 SQ.MT. 2.430 FLAT NO. 2, (4TH & 5TH FLR.) (WING -B) 14 5.600 X 1.310 X 1 NO = 7.34 SQ.MT. 6.000 16 3.140 0.650 6 RERA CARPET AREA STATEMENT 1 1.10 X 4.41 X 1 NO = 4.85 SQ.MT. 2.140 15 6.000 X 2.140 X 1 NO = 12.84 SQ.MT. 15 4.410 2 9.25 X 4.26 X 1 NO = 39.41 SQ.MT. 4.260 FLAT NO. 3, (5TH TO 7TH FLR.) (WING -B) 2 1 16 3.900 X 3.140 X 1 NO = 12.25 SQ.MT. 2.000 2.570 2.730 1.950 3 4.41 X 0.39 X 1 NO = 1.72 SQ.MT. 1 1.10 X 4.41 X 1 NO = 4.85 SQ.MT. TOTAL ADDITION = 53.44 SQ.MT. X 0.760 TOTAL ADDITION = 45.98 SQ.MT. X 0.390 7 2 1.95 X 4.26 X 1 NO = 8.31 SQ.MT. 3.900 4 4.410 4.650 4.650 5.550 3 2.73 X 4.65 X 1 NO = 12.69 SQ.MT. 4.260 5 3 RERA CARPET AREA DIAGRAM 2 1 4.410 4 2.57 X 3.90 X 1 NO = 10.02 SQ.MT. 3 (2ND FLOOR WING - A) 5 2.00 X 4.65 X 1 NO = 9.30 SQ.MT. (FLAT -2) RERA CARPET AREA DIAGRAM 6 2.43 X 0.65 X 1 NO = 1.58 SQ.MT. SCALE : 1.100 TOTAL ADDITION = 46.75 SQ.MT. X (4TH & 5TH FLOOR WING - B) (FLAT -2) 1.100 SCALE : 1.100 RERA CARPET AREA DIAGRAM (5TH TO 7TH FLOOR WING - B) (FLAT -3) SCALE : 1.100 2.430 9.250 1.100 0.800 7 RERA CARPET AREA STATEMENT RERA CARPET AREA STATEMENT FLAT NO. 3, (4TH FLR.) (WING -B) FLAT NO. 2, (6TH TO 9TH FLR.) (WING -B) 1.060 3.860 RERA CARPET AREA STATEMENT 2.000 0.890 1.680 2.730 1.950 1 1.10 X 4.41 X 1 NO = 4.85 SQ.MT. 1 1.10 X 4.41 X 1 NO = 4.85 SQ.MT. FLAT NO. 1, 1ST., FLR. (WING -B) 3.250 2 1.95 X 4.26 X 1 NO = 8.31 SQ.MT. 3.010 4.410 2 9.25 X 4.26 X 1 NO = 39.41 SQ.MT. 4.260 1 5 4 1 1.060 X 4.410 X 1 NO = 4.67 SQ.MT. 4.410 4.500 2 3 2.73 X 4.50 X 1 NO = 12.29 SQ.MT. 4.260 4.260 4.260 5.470 6 3 4.410 1 2 3 4.41 X 0.63 X 1 NO = 2.78 SQ.MT. 2 1 2 3.860 X 4.260 X 1 NO = 16.44 SQ.MT. 4 1.68 X 3.25 X 1 NO = 5.46 SQ.MT. 3 2.910 3 5.470 X 2.910 X 1 NO = 15.92 SQ.MT. TOTAL ADDITION = 47.04 SQ.MT. X 5 0.89 X 3.01 X 1 NO = 2.68 SQ.MT. 4.410 4 2.430 X 0.390 X 1 NO = 0.95 SQ.MT. 6 2.00 X 4.26 X 1 NO = 8.52 SQ.MT. 0.630 TOTAL ADDITION = 37.98 SQ.MT. X 0.390 3 7 2.43 X 0.80 X 1 NO = 1.94 SQ.MT. 4 2.430 TOTAL ADDITION = 44.05 SQ.MT. X RERA CARPET AREA DIAGRAM RERA CARPET AREA DIAGRAM 1.100 RERA CARPET AREA DIAGRAM (6TH TO 9TH FLOOR WING - B) (4TH FLOOR WING - B) (1ST FLOOR WING - B) (FLAT -2) (FLAT -3) (FLAT -1) SCALE : 1.100 SCALE : 1.100 SCALE : 1.100 RERA CARPET AREA STATEMENT FLAT NO. 1, (4TH TO 9TH FLR.) (WING -B) 1.100 1.950 2.730 2.000 1 1.10 X 4.41 X 1 NO = 4.85 SQ.MT. RERA CARPET AREA STATEMENT 2.570 2 1.95 X 4.26 X 1 NO = 8.31 SQ.MT. 2.150 1.060 4.720 4.410 4.260 FLAT NO. 3, 1ST. FLR. (WING -B) 1 3 2.73 X 4.65 X 1 NO = 12.69 SQ.MT. 4.650 4.650 2 3 5 3.900 1 1.060 X 4.410 X 1 NO = 4.67 SQ.MT. 4 2.57 X 3.90 X 1 NO = 10.02 SQ.MT. 4 5 4.260 1 4.410 6 4.260 5 2.150 X 4.260 X 1 NO = 9.16 SQ.MT. 5 2.00 X 4.65 X 1 NO = 9.30 SQ.MT. 6 4.720 X 4.260 X 1 NO = 20.11 SQ.MT. 6 2.43 X 0.65 X 1 NO = 1.58 SQ.MT. TOTAL ADDITION = 33.94 SQ.MT. X TOTAL ADDITION = 46.75 SQ.MT. X 6 0.650 2.430 RERA CARPET AREA DIAGRAM (1ST FLOOR WING - B) RERA CARPET AREA DIAGRAM (FLAT -3) (4TH TO 7TH FLOOR WING - B) SCALE : 1.100 (FLAT -1) SCALE : 1.100 RERA CARPET AREA STATEMENT 1.100 4.680 FLAT NO. 1, (2ND. FLR.) (WING -B) 1 1.10 X 4.41 X 1 NO = 4.85 SQ.MT. 1 4.410 2 4.260 2.570 4 4.260 2 4.68 X 4.26 X 1 NO = 19.94 SQ.MT. 2.910 3 2.57 X 2.91 X 1 NO = 7.48 SQ.MT. 3 PLAN FOR APPROVAL 4 2.00 X 4.26 X 1 NO = 8.52 SQ.MT. 5 2.43 X 0.39 X 1 NO = 0.95 SQ.MT. 5 0.390 TOTAL ADDITION = 41.74 SQ.MT. X 2.430 2.000 SHAIKH Digitally signed by SHAIKH ASIF MUSA RERA CARPET AREA DIAGRAM GAURAV Digitally signed by GAURAV SHASHIKANT KHANOLKAR DN: c=IN, o=BRIHANMUMBAI DN: c=IN, o=BRIHANMUMBAI MUNICIPAL CORPORATION, 0.390 SHIVADAS MUNICIPAL CORPORATION, ou=SUB Digitally signed by SHIVADAS KRISHNA ou=BUILDING PROPOSAL, ASIF (2ND FLOOR WING - B) 5 SHASHIKAN ENGINEER, 2.5.4.20=8c143ecc232f95bdc25706be7 607c588de9d1a8a85f7d9e9187a60de2 2.5.4.20=dc538dee2bc8ae44a2a2420 6efc4ca6d9817f07e6c4eed02678a87 GURAV DN: c=IN, o=MUNICIPAL CORPORATION OF GREATER MUMBAI, ou=BUILDING 2.430 RERA CARPET AREA STATEMENT T 9ced457, postalCode=400093, (FLAT -1) KRISHNA 124ebb3c56, st=Maharashtra, PROPOSAL, st=MAHARASHTRA, serialNumber=e673174400a2a913c8 2.5.4.20=a9ef4109d1f0761f647894d6fd8412 serialNumber=306a422c7a07a0e0c3ce MUSA 1.100 4.680 2.570 2.000 af442717d29556810ebb9fbad36ca407 6f1019b5be28024d407841b387a179 6d0ede3dafb9753314181bb98565ed0ff5, SCALE : 1.100 FLAT NO. 3 & 4, (3RD. FLR.) (WING -B) KHANOLKAR 01bd2f1ba899, cn=GAURAV d59e11e669bc8900, cn=SHAIKH ASIF postalCode=400093, st=Maharashtra, GURAV SHASHIKANT KHANOLKAR serialNumber=7AC5A48B02E3E2AECF71E43 Date: 2024.10.01 13:58:25 +05'30' MUSA FB159DB02A161EAC2FEF6E75C1B69B3F1D 3.010 Date: 2024.10.01 15:55:47 +05'30' 29DD1C4, cn=SHIVADAS KRISHNA GURAV 3 1 1.10 X 4.41 X 1 NO = 4.85 SQ.MT. Date: 2024.10.08 18:01:00 +05'30' 4.410 1 2 4.260 4 4.260 2 4.68 X 4.26 X 1 NO = 19.94 SQ.MT. 2.000 4.680 1.100 S. E. ( B. P. ) K/E-C A. E. ( B. P. ) K/E E. E. ( B. P. ) K/E 3 2.57 X 3.01 X 1 NO = 7.74 SQ.MT. RERA CARPET AREA STATEMENT 4 2.00 X 4.26 X 1 NO = 8.52 SQ.MT. PROFORMA 'B' FLAT NO. 2, (2ND. FLR.) (WING -B) 2.570 5 2.43 X 0.39 X 1 NO = 0.95 SQ.MT. CONTENTS OF SHEET 1 1.10 X 4.41 X 1 NO = 4.85 SQ.MT. TOTAL ADDITION = 42.00 SQ.MT. X RERA CARPET AREA DIAGRAM AND CALCULATION ETC. 2 4.68 X 4.26 X 1 NO = 19.94 SQ.MT. 4.260 4 4.260 2 4.410 1 3 2.57 X 2.91 X 1 NO = 7.48 SQ.MT. RERA CARPET AREA DIAGRAM 2.910 3 DESCRIPTION OF PROPOSAL & PROPERTY 4 2.00 X 4.26 X 1 NO = 8.52 SQ.MT. (3RD FLOOR WING - B) PROPOSED REDEVELOPMENT OF EXIST. RESIDENTIAL BUILDING KNOWN AS ROSE BLOSSOM 5 2.43 X 0.39 X 1 NO = 0.95 SQ.MT. (FLAT -3 & 4) CHS. LTD. ON PLOT BEARING CTS NO. 260A OF VILLAGE MOGRA, K/E -WARD, NATWAR TOTAL ADDITION = 41.74 SQ.MT. X SCALE : 1.100 NAGAR ROAD NO. 05, JOGESHWARI EAST, MUMBAI - 400 060. 0.390 5 2.430 RERA CARPET AREA DIAGRAM NAME AND SIGNATURE OF OWNER / APPLICANT (2ND FLOOR WING - B) SHREE PRITESH DAMJI SAVLA (FLAT -2) of M/s VINI DEVELOPERS SCALE : 1.100 PRITESH Digitally by PRITESH signed RERA CARPET AREA STATEMENT DAMJI DAMJI Date: SAVLA 1.100 4.680 2.000 FLAT NO. 1 & 2, (3RD. FLR.) (WING -B) SAVLA 2024.10.01 12:47:31 +05'30' RERA CARPET AREA STATEMENT 2.570 1 1.10 X 4.41 X 1 NO = 4.85 SQ.MT. C.A. TO OWNER 4.410 1.100 4.680 2.570 0.750 4.260 4.260 FLAT NO. 3, (2ND. FLR.) (WING -B) 1 2 4 2 4.68 X 4.26 X 1 NO = 19.94 SQ.MT. 3.010 3.510 JOB NO. 3.160 3 1 1.10 X 4.41 X 1 NO = 4.85 SQ.MT. 3 4 3 2.57 X 3.51 X 1 NO = 9.02 SQ.MT. 4.260 DRAWN BY TAWAKKAL DATE 27.09.2024 4.410 2 4.68 X 4.26 X 1 NO = 19.94 SQ.MT. 1 2 4 2.00 X 4.26 X 1 NO = 8.52 SQ.MT. 3 2.57 X 3.01 X 1 NO = 7.74 SQ.MT. 5 2.43 X 0.39 X 1 NO = 0.95 SQ.MT. CHECKED BY DEEPAK A. SCALE AS SHOWN NAME, ADDRESS AND SIGNATURE OF ARCHITECT 0.390 4 0.75 X 3.16 X 1 NO = 2.37 SQ.MT. 5 TOTAL ADDITION = 43.28 SQ.MT. X NORTH 5 1.100 5 1.92 X 1.10 X 1 NO = 2.11 SQ.MT. 2.430 AR. UJWAL SATISH BHOLE 1.920 TOTAL ADDITION = 37.01 SQ.MT. X CA / 2010 / 47919 RERA CARPET AREA DIAGRAM RERA CARPET AREA DIAGRAM (3RD FLOOR WING - B) N UJWAL Digitally signed by UJWAL (2ND FLOOR WING - B) (FLAT -3) (FLAT -1 & 2) u b a r c h i t e c t s SATISH SATISH BHOLE SCALE : 1.100 602 - B, Sarvoday 11, Kher Nagar, Date: 2024.09.27 SCALE : 1.100 BHOLE Bandra (East), Mumbai- 400051. www.ubarchitects.in 16:05:39 +05'30' P-8881/2021/(260/A AND OTHER)/K/E WARD/MOGRA 6/7 THIS PLAN IS DIGITALLY SIGNED AND PHYSICAL SIGH IS NOT REQUIRED APPROVED SUBJECT TO CONDITIONS MENTIONED IN THIS OFFICE LETTER UNDER P-8881/2021/(260 A And Other)/K/E Ward/MOGRA Dated : 08.10.204 2.000 2.000 2.000 PERGOLA V OVERHEAD OVERHEAD OVERHEAD 3.100 3.100 WATER TANK WATER TANK WATER TANK LIFT MACHINE LIFT LIFT ROOM MACHINE MACHINE ROOM ROOM STAIRCASE CABIN STAIRCASE CABIN STAIRCASE CABIN 2.600 2.600 2.600 1.500 1.500 1.500 1.500 1.500 1.500 1.500 PARAPET WALL 1.50 MT. HT. TERRACE FLOOR LEVEL TERRACE TERRACE FLOOR LEVEL TERRACE TERRACE TERRACE FLOOR LEVEL TERRACE TERRACE FLOOR LEVEL TERRACE CHAJJA 0.600 CHAJJA 0.600 0.600 CHAJJA 0.600 CHAJJA L I F T W E L L 0.750 0.350 0.450 0.300 2.900 2.900 2.900 2.900 2.900 DUCT 0.90M HIGH SAFETY 0.90M HIGH SAFETY 0.90M HIGH SAFETY 0.90M HIGH SAFETY L I F T W E L L L I F T W E L L RAILING FLUSH TO RAILING FLUSH TO RAILING FLUSH TO RAILING FLUSH TO BUILDING LINE CHOWK OPEN TO SYK BUILDING LINE BUILDING LINE BUILDING LINE WITH WINDOW SILL WITH WINDOW SILL WITH WINDOW SILL WITH WINDOW SILL OF LVL. 0.30 M OF LVL. 0.30 M OF LVL. 0.30 M TOILET OF LVL. 0.30 M LIVING ROOM BEDROOM BEDROOM TOILET KITCHEN PASS. LOBBY BEDROOM 9TH FLOOR LEVEL 9TH FLOOR LEVEL 9TH FLOOR LEVEL 9TH FLOOR LEVEL 0.600 0.600 0.600 0.600 200 MM SUNK 200 MM SUNK CHAJJA CHAJJA CHAJJA S.S CHAJJA 0.750 0.350 0.450 0.300 2.900 2.900 2.900 2.900 2.900 DUCT 0.90M HIGH SAFETY 0.90M HIGH SAFETY 0.90M HIGH SAFETY 0.90M HIGH SAFETY RAILING FLUSH TO RAILING FLUSH TO RAILING FLUSH TO RAILING FLUSH TO BUILDING LINE BUILDING LINE BUILDING LINE BUILDING LINE WITH WINDOW SILL WITH WINDOW SILL WITH WINDOW SILL WITH WINDOW SILL OF LVL. 0.30 M OF LVL. 0.30 M OF LVL. 0.30 M TOILET OF LVL. 0.30 M LIVING ROOM LOBBY BEDROOM BEDROOM TOILET KITCHEN PASS. LOBBY BEDROOM 8TH FLOOR LEVEL 8TH FLOOR LEVEL 8TH FLOOR LEVEL 8TH FLOOR LEVEL 0.600 0.600 0.600 0.600 200 MM SUNK 200 MM SUNK CHAJJA CHAJJA CHAJJA S.S CHAJJA 0.750 0.350 0.450 0.890 0.300 2.900 2.900 2.900 2.900 2.900 DUCT 0.90M HIGH SAFETY 0.90M HIGH SAFETY 0.90M HIGH SAFETY 0.90M HIGH SAFETY RAILING FLUSH TO RAILING FLUSH TO RAILING FLUSH TO RAILING FLUSH TO BUILDING LINE BUILDING LINE BUILDING LINE BUILDING LINE WITH WINDOW SILL WITH WINDOW SILL WITH WINDOW SILL WITH WINDOW SILL OF LVL. 0.30 M OF LVL. 0.30 M OF LVL. 0.30 M TOILET OF LVL. 0.30 M LIVING ROOM LOBBY BEDROOM BEDROOM TOILET KITCHEN PASS. LOBBY BEDROOM 7TH FLOOR LEVEL 7TH FLOOR LEVEL 7TH FLOOR LEVEL 7TH FLOOR LEVEL 0.600 0.600 0.600 0.600 200 MM SUNK 200 MM SUNK CHAJJA CHAJJA S.S L I F T W E L L CHAJJA CHAJJA 0.750 0.350 0.450 0.450 2.900 2.900 2.900 2.900 2.900 DUCT 0.90M HIGH SAFETY 0.90M HIGH SAFETY 0.90M HIGH SAFETY 0.90M HIGH SAFETY RAILING FLUSH TO RAILING FLUSH TO RAILING FLUSH TO RAILING FLUSH TO BUILDING LINE BUILDING LINE BUILDING LINE BUILDING LINE WITH WINDOW SILL WITH WINDOW SILL WITH WINDOW SILL WITH WINDOW SILL OF LVL. 0.30 M OF LVL. 0.30 M OF LVL. 0.30 M TOILET OF LVL. 0.30 M LIVING ROOM LOBBY BEDROOM BEDROOM TOILET KITCHEN PASS. LOBBY BEDROOM 6TH FLOOR LEVEL 6TH FLOOR LEVEL 6TH FLOOR LEVEL 6TH FLOOR LEVEL 0.600 0.600 0.600 0.600 200 MM SUNK 200 MM SUNK CHAJJA CHAJJA CHAJJA S.S CHAJJA 0.750 0.350 0.450 0.450 2.900 2.900 2.900 2.900 2.900 DUCT 0.90M HIGH SAFETY 0.90M HIGH SAFETY 0.90M HIGH SAFETY 0.90M HIGH SAFETY RAILING FLUSH TO RAILING FLUSH TO RAILING FLUSH TO RAILING FLUSH TO BUILDING LINE BUILDING LINE BUILDING LINE BUILDING LINE WITH WINDOW SILL WITH WINDOW SILL WITH WINDOW SILL WITH WINDOW SILL OF LVL. 0.30 M OF LVL. 0.30 M OF LVL. 0.30 M TOILET OF LVL. 0.30 M LIVING ROOM LOBBY L I F T W E L L L I F T W E L L CHOWK OPEN TO SYK LOBBY BEDROOM BEDROOM TOILET KITCHEN PASS. BEDROOM 5TH FLOOR LEVEL 5TH FLOOR LEVEL 5TH FLOOR LEVEL 5TH FLOOR LEVEL 0.600 0.600 0.600 0.600 200 MM SUNK 200 MM SUNK CHAJJA CHAJJA CHAJJA S.S CHAJJA 30.750 0.750 30.750 0.350 0.450 30.750 30.750 0.450 2.900 2.900 2.900 2.900 2.900 DUCT 0.90M HIGH SAFETY 0.90M HIGH SAFETY 0.90M HIGH SAFETY 0.90M HIGH SAFETY RAILING FLUSH TO RAILING FLUSH TO RAILING FLUSH TO RAILING FLUSH TO BUILDING LINE BUILDING LINE BUILDING LINE BUILDING LINE WITH WINDOW SILL WITH WINDOW SILL WITH WINDOW SILL WITH WINDOW SILL OF LVL. 0.30 M OF LVL. 0.30 M OF LVL. 0.30 M TOILET OF LVL. 0.30 M LIVING ROOM LOBBY BEDROOM BEDROOM TOILET KITCHEN PASS. LOBBY BEDROOM 4TH FLOOR LEVEL 4TH FLOOR LEVEL 4TH FLOOR LEVEL 4TH FLOOR LEVEL 0.600 0.600 0.600 0.600 200 MM SUNK 200 MM SUNK L I F T W E L L CHAJJA CHAJJA CHAJJA S.S CHAJJA 0.750 0.350 0.450 0.390 0.450 2.900 2.900 2.900 2.900 2.900 DUCT 0.90M HIGH SAFETY 0.90M HIGH SAFETY 0.90M HIGH SAFETY 0.90M HIGH SAFETY RAILING FLUSH TO RAILING FLUSH TO RAILING FLUSH TO RAILING FLUSH TO BUILDING LINE BUILDING LINE BUILDING LINE BUILDING LINE WITH WINDOW SILL WITH WINDOW SILL WITH WINDOW SILL WITH WINDOW SILL OF LVL. 0.30 M OF LVL. 0.30 M OF LVL. 0.30 M TOILET OF LVL. 0.30 M LIVING ROOM LOBBY BEDROOM BEDROOM TOILET KITCHEN LOBBY BEDROOM 3RD FLOOR LEVEL 3RD FLOOR LEVEL 3RD FLOOR LEVEL 3RD FLOOR LEVEL 0.600 0.600 0.600 0.600 200 MM SUNK 200 MM SUNK CHAJJA CHAJJA CHAJJA S.S CHAJJA 0.750 0.350 0.450 0.450 (FIS=1.00)16.250HT. 2.900 2.900 2.900 2.900 2.900 DUCT 0.90M HIGH SAFETY 0.90M HIGH SAFETY 0.90M HIGH SAFETY 0.90M HIGH SAFETY RAILING FLUSH TO RAILING FLUSH TO RAILING FLUSH TO RAILING FLUSH TO BUILDING LINE BUILDING LINE BUILDING LINE BUILDING LINE WITH WINDOW SILL WITH WINDOW SILL WITH WINDOW SILL TOILET WITH WINDOW SILL OF LVL. 0.30 M OF LVL. 0.30 M OF LVL. 0.30 M OF LVL. 0.30 M LIVING ROOM LOBBY BEDROOM BEDROOM TOILET KITCHEN LOBBY BEDROOM 2ND FLOOR LEVEL 2ND FLOOR LEVEL 2ND FLOOR LEVEL 2ND FLOOR LEVEL 0.600 0.600 0.600 200 MM SUNK 200 MM SUNK CHAJJA 0.350 0.450 S.S 1.200 CHAJJA CHAJJA CHAJJA 0.750 0.450 2.900 2.900 2.900 2.900 2.900 2.900 R.C.C CROSS- BEAM GLASS GLASS BELOW 1.12M FROM FLR 1.400 GLAZING NURSING NURSING GLAZING LVL. NURSING HOME HOME NURSING TO AVOID MISUSE HOME LOBBY LOBBY HOME 1ST FLOOR LEVEL 1ST FLOOR LEVEL 1ST FLOOR LEVEL 1ST FLOOR LEVEL L I F T W E L L L I F T W E L L 0.450 CHAJJA 0.750 0.300 L I F T W E L L 0.350 0.300 W E L L CHOWK OPEN TO SYK CHAJJA 0.450 0.750 1.200 4.200 4.200 4.200 4.200 4.200 4.200 2.400 L I F T ENTRANCE STACK TO PIT LOBBY LOBBY FOR ENTRANCE ENTRANCE PARKING LOBBY TOILET NURSING HOME LOBBY PLINTH LEVEL SHOP PLINTH LEVEL LOBBY PLINTH LEVEL PLINTH LEVEL 0.450 0.450 0.450 0.450 0.450 200 MM SUNK GROUND LEVEL GROUND LEVEL GROUND LEVEL GROUND LEVEL GROUND LEVEL 1.950 1.950 0.450 1.650 0.150 0.150 0.450 LIFT PIT LIFT PIT LIFT PIT LIFT PIT 2.500 SECTION "A" - "A" SECTION "B" - "B" SECTION "C" - "C" SCALE - 1 : 100 SCALE - 1 : 100 SCALE - 1 : 100 SECTION "D" - "D" SCALE - 1 : 100 2.100 PLAN FOR APPROVAL SHAIKH Digitally signed by GAURAV Digitally signed by SHAIKH ASIF MUSA 2.100 GAURAV SHASHIKANT KHANOLKAR DN: c=IN, o=BRIHANMUMBAI DN: c=IN, o=BRIHANMUMBAI MUNICIPAL CORPORATION, ou=SUB SHIVADAS MUNICIPAL CORPORATION, SHASHIKAN ENGINEER, ou=BUILDING PROPOSAL, ASIF 2.5.4.20=8c143ecc232f95bdc25706be Digitally signed by SHIVADAS KRISHNA GURAV 7607c588de9d1a8a85f7d9e9187a60d 2.5.4.20=dc538dee2bc8ae44a2a24 DN: c=IN, o=MUNICIPAL CORPORATION OF LIVING ROOM LIVING ROOM KITCHEN BED RM. T e29ced457, postalCode=400093, GREATER MUMBAI, ou=BUILDING PROPOSAL, 206efc4ca6d9817f07e6c4eed0267 KRISHNA st=MAHARASHTRA, 3RD FLOOR LEVEL serialNumber=306a422c7a07a0e0c3ce 8a87124ebb3c56, st=Maharashtra, 2.5.4.20=a9ef4109d1f0761f647894d6fd84126 d0ede3dafb9753314181bb98565ed0ff5, KHANOLKAR af442717d29556810ebb9fbad36ca407 postalCode=400093, st=Maharashtra, serialNumber=e673174400a2a913 MUSA 01bd2f1ba899, cn=GAURAV serialNumber=7AC5A48B02E3E2AECF71E43FB 1.120 SHASHIKANT KHANOLKAR c86f1019b5be28024d407841b387 159DB02A161EAC2FEF6E75C1B69B3F1D29DD a179d59e11e669bc8900, GURAV Date: 2024.10.01 13:58:43 +05'30' 1C4, cn=SHIVADAS KRISHNA GURAV Date: 2024.10.08 18:01:12 +05'30' cn=SHAIKH ASIF MUSA 2.100 Date: 2024.10.01 15:56:07 +05'30' R.C.C CROSS- BEAM 2.900 BELOW 1.12M FROM FLR LVL. S. E. ( B. P. ) K/E-C A. E. ( B. P. ) K/E E. E. ( B. P. ) K/E 1.480 TO AVOID MISUSE FITNESS CENTER LIVING ROOM KITCHEN BED RM. 2ND FLOOR LEVEL R.C.C WALL PROFORMA 'B' 1.120 1.120 R.C.C WALL 2.100 CONTENTS OF SHEET SECTION "A"-"A", "B"-"B", "C"-"C", "D"-"D", SECTION DETAIL OF ROTARY PARKING 1.480 0.300 R.C.C CROSS- BEAM 2.900 17.850 SYSTEM ETC. BELOW 1.12M FROM FLR LVL. TO AVOID MISUSE DESCRIPTION OF PROPOSAL & PROPERTY 2.100 KITCHEN LIVING ROOM BED RM. 1ST FLOOR LEVEL PROPOSED REDEVELOPMENT OF EXIST. RESIDENTIAL BUILDING KNOWN AS ROSE BLOSSOM CHS. LTD. ON PLOT BEARING CTS NO. 260A OF VILLAGE MOGRA, K/E -WARD, NATWAR NAGAR ROAD NO. 05, JOGESHWARI EAST, MUMBAI - 400 060. STACK TO PIT PARKING 4.200 2.100 NAME AND SIGNATURE OF OWNER / APPLICANT SHREE PRITESH DAMJI SAVLA STACK TO PIT PARKING ENTRANCE of M/s VINI DEVELOPERS PLINTH LEVEL LOBBY 2.100 PRITESH Digitally by PRITESH signed GROUND LEVEL GROUND LEVEL DAMJI DAMJI SAVLA Date: 2024.10.01 SAVLA 12:47:54 +05'30' 0.450 2.500 2.950 C.A. TO OWNER 2.100 CAR PIT CAR PIT JOB NO. GR LVL GR LVL 2.240 2.240 ± 0.00 M LVL ± 0.00 M LVL DRAWN BY TAWAKKAL DATE 27.09.2024 ( -2.10 M LVL. ) CHECKED BY DEEPAK A. SCALE AS SHOWN 2.100 PIT FOR NORTH NAME, ADDRESS AND SIGNATURE OF ARCHITECT SECTION "E" - "E" CAR PARKING TOWER SCALE - 1 : 100 AR. UJWAL SATISH BHOLE CA / 2010 / 47919 SECTION "F"-"F" DETAIL OF UJWAL Digitally signed N by UJWAL ROTARY PARKING SYSTEM u b a r c h i t e c t s SATISH SATISH BHOLE SCALE - 1 : 100 TOTAL PARKING 16 NOS 602 - B, Sarvoday 11, Kher Nagar, Date: 2024.09.27 BHOLE Bandra (East), Mumbai- 400051. www.ubarchitects.in 16:05:57 +05'30' 10.575 10.575 P-8881/2021/(260/A AND OTHER)/K/E WARD/MOGRA 7/7 PROP. BUILT UP AREA CALCULATION 6.005 2.270 0.080 THIS PLAN IS DIGITALLY SIGNED AND PHYSICAL SIGH IS NOT REQUIRED PROP. BUILT UP AREA CALCULATION 1 0.830 FLAT NO. 4, 8TH. FLOOR (WING- B) EXIST. MEMBER 2 APPROVED SUBJECT TO CONDITIONS MENTIONED IN THIS OFFICE LETTER UNDER FLAT NO. 1, 8TH & 9TH FLOOR (WING- B) EXIST. MEMBER A 10.575 X 5.920 X 1 NO = 62.60 SQ.MT. A 10.575 X 5.680 X 1 NO = 60.07 SQ.MT. P-8881/2021/(260 A And Other)/K/E Ward/MOGRA Dated : 08.10.2024 TOTAL ADDITION = 62.60 SQ.MT. X TOTAL ADDITION = 60.07 SQ.MT. X DEDUCTIONS 5.920 5.680 DEDUCTIONS A A 1 6.005 X 0.080 X 1 NO = 0.48 SQ.MT. 1 6.005 X 0.080 X 1 NO = 0.48 SQ.MT. 2 2.270 X 0.830 X 1 NO = 1.88 SQ.MT. 2 2.270 X 0.830 X 1 NO = 1.88 SQ.MT. TOTAL DEDUCTION = 2.36 SQ.MT. Y1 3 2.975 X 1.040 X 1 NO = 3.09 SQ.MT. 2.975 2.270 1.980 2.890 TOTAL BUILT UP AREA [X - Y1] = 60.24 SQ.MT. X1 1.040 0.830 0.650 0.650 4 1.980 X 0.650 X 1 NO = 1.29 SQ.MT. 3 2 0.080 4 5 6.005 1 5 2.890 X 0.650 X 1 NO = 1.88 SQ.MT. TOTAL DEDUCTION = 8.62 SQ.MT. Y1 LINE DIAG. FOR PROP. B.U.A. AREA LINE DIAG. FOR PROP. B.U.A. AREA TOTAL BUILT UP AREA [X - Y1] = 51.45 SQ.MT. X1 CALC. OF FLAT NO. 1 FOR EXIST. MEMBER CALC. OF FLAT NO. 4 FOR EXIST. MEMBER 10.200 10.200 10.125 5.930 4.270 5.930 4.195 5.930 4.270 8TH & 9TH FLOOR (WING- B) 8TH FLOOR (WING- B) 0.760 0.760 0.760 5 5 4 SCALE - 1 : 100 SCALE - 1 : 100 3.200 0.240 3.200 3.200 0.630 10.575 0.075 0.075 PROP. BUILT UP AREA CALCULATION 3.200 3.440 2.810 FLAT NO. 2, 8TH. FLOOR (WING- B) EXIST. MEMBER 0.400 4 0.400 4 0.400 7.585 A 10.575 X 5.190 X 1 NO = 54.88 SQ.MT. 7.585 1.460 7.585 A 1.460 1.460 TOTAL ADDITION = 54.88 SQ.MT. X 1 A 1 1 A DEDUCTIONS 5.190 A 3.385 1 2.890 X 0.630 X 1 NO = 1.82 SQ.MT. 3.385 2.925 3.385 3 2.925 3 2.925 3 2 2 2.975 X 0.630 X 1 NO = 1.87 SQ.MT. 2 2 TOTAL DEDUCTION = 3.69 SQ.MT. Y1 2.890 2.975 EXISTING MEMBER 0.630 0.630 EXISTING MEMBER 701 EXISTING MEMBER 1 2 401 801 TOTAL BUILT UP AREA [X - Y1] = 51.19 SQ.MT. X1 0.750 5.630 3.820 0.750 5.630 3.745 0.750 5.630 3.820 LINE DIAG. FOR PROP. B.U.A. AREA LINE DIAG. FOR PROP. B.U.A. AREA LINE DIAG. FOR PROP. B.U.A. AREA LINE DIAG. FOR PROP. B.U.A. AREA CALC. OF FLAT NO. 2 FOR EXIST. MEMBER CALC. OF FLAT NO. 1 FOR EXIST. MEMBER CALC. OF FLAT NO. 1 FOR EXIST. MEMBER CALC. OF FLAT NO. 1 FOR EXIST. MEMBER 8TH FLOOR (WING- B) 4TH FLOOR (WING- A) 7TH FLOOR (WING- A) 8TH FLOOR (WING- A) SCALE - 1 : 100 SCALE - 1 : 100 SCALE - 1 : 100 SCALE - 1 : 100 PROP. BUILT UP AREA CALCULATION PROP. BUILT UP AREA CALCULATION 10.575 10.575 PROP. BUILT UP AREA CALCULATION PROP. BUILT UP AREA CALCULATION 10.575 10.575 FLAT NO. 4, 5TH. FLOOR (WING- B) EXIST. MEMBER FLAT NO. 3, 6TH & 7TH. FLOOR (WING- B) EXIST. MEMBER 2.810 1.980 2.975 2.975 1.880 2.820 2.810 1.980 2.975 2.975 1.880 2.820 FLAT NO. 4, 6TH & 7TH. FLOOR (WING- B) EXIST. MEMBER 0.650 0.650 0.650 0.650 FLAT NO. 3, 5TH. FLOOR (WING- B) EXIST. MEMBER A 10.575 X 5.680 X 1 NO = 60.07 SQ.MT. 0.650 0.650 0.650 0.650 A 10.575 X 5.600 X 1 NO = 59.22 SQ.MT. 1.040 1.040 1 2 2 3 1.040 1.040 1 2 2 3 3 1 A 10.575 X 5.680 X 1 NO = 60.07 SQ.MT. A 10.575 X 5.600 X 1 NO = 59.22 SQ.MT. 3 1 TOTAL ADDITION = 60.07 SQ.MT. X TOTAL ADDITION = 59.22 SQ.MT. X TOTAL ADDITION = 60.07 SQ.MT. X TOTAL ADDITION = 59.22 SQ.MT. X DEDUCTIONS DEDUCTIONS 1 2.975 X 1.040 X 1 NO = 3.09 SQ.MT. DEDUCTIONS DEDUCTIONS 1 2.810 X 0.650 X 1 NO = 1.83 SQ.MT. 5.600 5.680 5.600 5.680 2 1.880 X 0.650 X 1 NO = 1.22 SQ.MT. A A 1 2.975 X 1.040 X 1 NO = 3.09 SQ.MT. 1 2.810 X 0.650 X 1 NO = 1.83 SQ.MT. A A 2 1.980 X 0.650 X 1 NO = 1.29 SQ.MT. 3 2.820 X 0.650 X 1 NO = 1.83 SQ.MT. 2 1.880 X 0.650 X 1 NO = 1.22 SQ.MT. 2 1.980 X 0.650 X 1 NO = 1.29 SQ.MT. 3 2.975 X 1.040 X 1 NO = 3.09 SQ.MT. 4 6.005 X 0.080 X 1 NO = 0.48 SQ.MT. 3 2.820 X 0.650 X 1 NO = 1.83 SQ.MT. 3 2.975 X 1.040 X 1 NO = 3.09 SQ.MT. 3 0.005 X 0.001 X 1 NO = 0.00 SQ.MT. 5 2.270 X 0.830 X 1 NO = 1.88 SQ.MT. 2.270 2.270 4 6.005 X 0.080 X 1 NO = 0.48 SQ.MT. 4 2.270 X 0.750 X 1 NO = 1.70 SQ.MT. 2.270 2.270 4 2.270 X 0.750 X 1 NO = 1.70 SQ.MT. 0.750 3 0.830 0.750 0.830 TOTAL DEDUCTION = 8.50 SQ.MT. Y1 4 5 5 2.270 X 0.830 X 1 NO = 1.88 SQ.MT. TOTAL DEDUCTION = 7.91 SQ.MT. Y1 4 6.005 0.080 5 TOTAL DEDUCTION = 7.91 SQ.MT. Y1 0.080 6.005 4 4 TOTAL BUILT UP AREA [X - Y1] = 51.57 SQ.MT. X1 TOTAL DEDUCTION = 8.50 SQ.MT. Y1 TOTAL BUILT UP AREA [X - Y1] = 51.31 SQ.MT. X1 TOTAL BUILT UP AREA [X - Y1] = 51.31 SQ.MT. X1 TOTAL BUILT UP AREA [X - Y1] = 51.57 SQ.MT. X1 LINE DIAG. FOR PROP. B.U.A. AREA LINE DIAG. FOR PROP. B.U.A. AREA LINE DIAG. FOR PROP. B.U.A. AREA LINE DIAG. FOR PROP. B.U.A. AREA CALC. OF FLAT NO. 3 FOR EXIST. MEMBER CALC. OF FLAT NO. 4 FOR EXIST. MEMBER CALC. OF FLAT NO. 3 FOR EXIST. MEMBER CALC. OF FLAT NO. 4 FOR EXIST. MEMBER 5TH FLOOR (WING- B) 5TH FLOOR (WING- B) 6TH & 7TH FLOOR (WING- B) 6TH & 7TH FLOOR (WING- B) SCALE - 1 : 100 SCALE - 1 : 100 SCALE - 1 : 100 SCALE - 1 : 100 PROP. BUILT UP AREA CALCULATION PROP. BUILT UP AREA CALCULATION 10.575 10.575 10.575 FLAT NO. 1, 5TH. FLOOR (WING- B) EXIST. MEMBER 0.080 6.005 2.270 6.005 2.270 0.080 PROP. BUILT UP AREA CALCULATION FLAT NO. 1, 6TH & 7TH. FLOOR (WING- B) EXIST. MEMBER 1 1 2 0.830 A 10.575 X 5.680 X 1 NO = 60.07 SQ.MT. FLAT NO. 2, 7TH. FLOOR (WING- B) EXIST. MEMBER 2 0.830 A 10.575 X 5.680 X 1 NO = 60.07 SQ.MT. TOTAL ADDITION = 60.07 SQ.MT. X TOTAL ADDITION = 60.07 SQ.MT. X A 10.575 X 5.190 X 1 NO = 54.88 SQ.MT. TOTAL ADDITION = 54.88 SQ.MT. X DEDUCTIONS DEDUCTIONS 5.190 1 6.005 X 0.080 X 1 NO = 0.48 SQ.MT. 5.680 5.680 DEDUCTIONS A 1 6.005 X 0.080 X 1 NO = 0.48 SQ.MT. A A 2 2.270 X 0.830 X 1 NO = 1.88 SQ.MT. 2 2.270 X 0.830 X 1 NO = 1.88 SQ.MT. 1 2.890 X 0.630 X 1 NO = 1.82 SQ.MT. 3 2.975 X 1.040 X 1 NO = 3.09 SQ.MT. 3 2.975 X 1.040 X 1 NO = 3.09 SQ.MT. 2 2.975 X 0.630 X 1 NO = 1.87 SQ.MT. 2.975 4 1.980 X 0.650 X 1 NO = 1.29 SQ.MT. 2.890 2.975 2.975 4 1.980 X 0.650 X 1 NO = 1.29 SQ.MT. TOTAL DEDUCTION = 3.69 SQ.MT. Y1 0.630 0.630 1.980 2.890 1.980 2.890 1.040 1.040 5 2.890 X 0.650 X 1 NO = 1.88 SQ.MT. 1 2 5 2.890 X 0.650 X 1 NO = 1.88 SQ.MT. 0.650 0.650 0.650 0.650 3 TOTAL BUILT UP AREA [X - Y1] = 51.19 SQ.MT. X1 3 4 5 4 5 TOTAL DEDUCTION = 8.62 SQ.MT. Y1 TOTAL DEDUCTION = 8.62 SQ.MT. Y1 TOTAL BUILT UP AREA [X - Y1] = 51.45 SQ.MT. X1 TOTAL BUILT UP AREA [X - Y1] = 51.45 SQ.MT. X1 LINE DIAG. FOR PROP. B.U.A. AREA LINE DIAG. FOR PROP. B.U.A. AREA LINE DIAG. FOR PROP. B.U.A. AREA CALC. OF FLAT NO. 1 FOR EXIST. MEMBER CALC. OF FLAT NO. 2 FOR EXIST. MEMBER CALC. OF FLAT NO. 1 FOR EXIST. MEMBER 5TH FLOOR (WING- B) 7TH FLOOR (WING- B) 6TH & 7TH FLOOR (WING- B) SCALE - 1 : 100 SCALE - 1 : 100 SCALE - 1 : 100 10.575 PROP. BUILT UP AREA CALCULATION 10.575 10.575 RERA CARPET AREA STATEMENT 2.975 1.880 2.820 PROP. BUILT UP AREA CALCULATION 0.650 0.650 FLAT NO. 4, 4TH. FLOOR (WING- B) EXIST. MEMBER 1.040 2.810 4.955 4.855 2.820 FLAT NO. 4, 3RD. FLOOR (WING- B) EXIST. MEMBER 2 3 0.390 0.390 0.390 0.390 FLAT NO. 3, 3RD. FLOOR (WING- B) EXIST. MEMBER 1 1 2 1 2 A 10.575 X 5.680 X 1 NO = 60.07 SQ.MT. A 10.575 X 5.030 X 1 NO = 53.19 SQ.MT. A 10.575 X 4.950 X 1 NO = 52.35 SQ.MT. TOTAL ADDITION = 60.07 SQ.MT. X TOTAL ADDITION = 53.19 SQ.MT. X TOTAL ADDITION = 52.35 SQ.MT. X DEDUCTIONS DEDUCTIONS 4.950 5.680 5.030 DEDUCTIONS 1 2.975 X 1.040 X 1 NO = 3.09 SQ.MT. A A A 1 4.855 X 0.390 X 1 NO = 1.89 SQ.MT. 1 2.810 X 0.390 X 1 NO = 1.10 SQ.MT. 2 1.880 X 0.650 X 1 NO = 1.22 SQ.MT. 2 2.820 X 0.390 X 1 NO = 1.10 SQ.MT. 2 4.955 X 0.390 X 1 NO = 1.93 SQ.MT. 2.270 2.270 3 2.820 X 0.650 X 1 NO = 1.83 SQ.MT. 3 6.005 X 0.080 X 1 NO = 0.48 SQ.MT. 1.250 3 2.270 X 1.250 X 1 NO = 2.84 SQ.MT. 1.330 4 6.005 X 0.080 X 1 NO = 0.48 SQ.MT. 2.270 3 4 4 2.270 X 1.330 X 1 NO = 3.02 SQ.MT. TOTAL DEDUCTION = 5.87 SQ.MT. Y1 0.830 0.080 6.005 5 2.270 X 0.830 X 1 NO = 1.88 SQ.MT. 6.005 5 0.080 3 TOTAL DEDUCTION = 6.49 SQ.MT. Y1 4 TOTAL BUILT UP AREA [X - Y1] = 46.48 SQ.MT. X1 TOTAL DEDUCTION = 8.50 SQ.MT. Y1 TOTAL BUILT UP AREA [X - Y1] = 46.70 SQ.MT. X1 LINE DIAG. FOR PROP. B.U.A. AREA LINE DIAG. FOR PROP. B.U.A. AREA TOTAL BUILT UP AREA [X - Y1] = 51.57 SQ.MT. X1 LINE DIAG. FOR PROP. B.U.A. AREA CALC. OF FLAT NO. 3 FOR EXIST. MEMBER CALC. OF FLAT NO. 4 FOR EXIST. MEMBER CALC. OF FLAT NO. 4 FOR EXIST. MEMBER 3RD FLOOR (WING- B) 3RD FLOOR (WING- B) 4TH FLOOR (WING- B) SCALE - 1 : 100 SCALE - 1 : 100 SCALE - 1 : 100 PROP. BUILT UP AREA CALCULATION 10.575 10.575 10.575 FLAT NO. 1, 3RD. FLOOR (WING- B) EXIST. MEMBER 0.080 PROP. BUILT UP AREA CALCULATION 6.005 2.270 PROP. BUILT UP AREA CALCULATION 6.005 2.270 1 0.080 2.270 0.830 1 A 10.575 X 5.030 X 1 NO = 53.19 SQ.MT. FLAT NO. 1, 4TH. FLOOR (WING- B) EXIST. MEMBER 2 0.750 0.830 FLAT NO. 2, 3RD. FLOOR (WING- B) EXIST. MEMBER 1 2 TOTAL ADDITION = 53.19 SQ.MT. X A 10.575 X 5.680 X 1 NO = 60.07 SQ.MT. A 10.575 X 4.950 X 1 NO = 52.35 SQ.MT. TOTAL ADDITION = 60.07 SQ.MT. X TOTAL ADDITION = 52.35 SQ.MT. X DEDUCTIONS 1 6.005 X 0.080 X 1 NO = 0.48 SQ.MT. 4.950 5.030 5.680 DEDUCTIONS DEDUCTIONS A A A 2 2.270 X 0.830 X 1 NO = 1.88 SQ.MT. 1 6.005 X 0.080 X 1 NO = 0.48 SQ.MT. 1 2.270 X 0.750 X 1 NO = 1.70 SQ.MT. 3 4.955 X 0.390 X 1 NO = 1.93 SQ.MT. 2 2.270 X 0.830 X 1 NO = 1.88 SQ.MT. 2 2.810 X 0.390 X 1 NO = 1.10 SQ.MT. 4 2.890 X 0.390 X 1 NO = 1.13 SQ.MT. 3 2.975 X 1.040 X 1 NO = 3.09 SQ.MT. 3 4.955 X 0.390 X 1 NO = 1.93 SQ.MT. 2.975 2.810 4.955 4.955 2.890 1.980 2.890 0.390 0.390 0.390 0.390 TOTAL DEDUCTION = 5.42 SQ.MT. Y1 1.040 4 1.980 X 0.650 X 1 NO = 1.29 SQ.MT. 0.650 0.650 TOTAL DEDUCTION = 4.73 SQ.MT. Y1 2 3 3 4 3 4 5 TOTAL BUILT UP AREA [X - Y1] = 47.77 SQ.MT. X1 5 2.890 X 0.650 X 1 NO = 1.88 SQ.MT. TOTAL BUILT UP AREA [X - Y1] = 47.62 SQ.MT. X1 TOTAL DEDUCTION = 8.62 SQ.MT. Y1 LINE DIAG. FOR PROP. B.U.A. AREA LINE DIAG. FOR PROP. B.U.A. AREA TOTAL BUILT UP AREA [X - Y1] = 51.45 SQ.MT. X1 LINE DIAG. FOR PROP. B.U.A. AREA CALC. OF FLAT NO. 2 FOR EXIST. MEMBER CALC. OF FLAT NO. 1 FOR EXIST. MEMBER CALC. OF FLAT NO. 1 FOR EXIST. MEMBER 3RD FLOOR (WING- B) 3RD FLOOR (WING- B) 4TH FLOOR (WING- B) SCALE - 1 : 100 SCALE - 1 : 100 SCALE - 1 : 100 PLAN FOR APPROVAL PROP. BUILT UP AREA CALCULATION 10.570 SHAIKH Digitally signed by SHAIKH ASIF 1.170 FLAT NO. 4, 2ND. FLOOR (WING- B) EXIST. MEMBER Digitally signed by GAURAV MUSA GAURAV SHASHIKANT KHANOLKAR DN: c=IN, o=BRIHANMUMBAI MUNICIPAL CORPORATION, ou=SUB DN: c=IN, o=BRIHANMUMBAI MUNICIPAL CORPORATION, A 10.57 X 4.640 X 1 NO = 49.04 SQ.MT. ou=BUILDING PROPOSAL, SHASHIKAN ASIF SHIVADAS ENGINEER, 2.5.4.20=8c143ecc232f95bdc25706be76 2.5.4.20=dc538dee2bc8ae44a2a24 07c588de9d1a8a85f7d9e9187a60de29c Digitally signed by SHIVADAS KRISHNA GURAV 206efc4ca6d9817f07e6c4eed0267 T ed457, postalCode=400093, DN: c=IN, o=MUNICIPAL CORPORATION OF TOTAL ADDITION = 49.04 SQ.MT. X st=MAHARASHTRA, 8a87124ebb3c56, st=Maharashtra, GREATER MUMBAI, ou=BUILDING PROPOSAL, PROP. BUILT UP AREA CALCULATION 8.155 KRISHNA serialNumber=306a422c7a07a0e0c3ceaf 2.5.4.20=a9ef4109d1f0761f647894d6fd84126d0 serialNumber=e673174400a2a913 3.160 MUSA 442717d29556810ebb9fbad36ca40701b ede3dafb9753314181bb98565ed0ff5, FLAT NO. 3, 1ST. FLOOR (WING- B) EXIST. MEMBER 1 KHANOLKAR d2f1ba899, cn=GAURAV SHASHIKANT KHANOLKAR c86f1019b5be28024d407841b387 a179d59e11e669bc8900, postalCode=400093, st=Maharashtra, serialNumber=7AC5A48B02E3E2AECF71E43FB1 59DB02A161EAC2FEF6E75C1B69B3F1D29DD1C GURAV Date: 2024.10.01 13:59:03 +05'30' cn=SHAIKH ASIF MUSA 4, cn=SHIVADAS KRISHNA GURAV DEDUCTIONS Date: 2024.10.01 15:56:24 +05'30' Date: 2024.10.08 18:01:26 +05'30' A 8.155 X 4.560 X 1 NO = 37.19 SQ.MT. 4.640 A 4.560 1 1.170 X 3.160 X 1 NO = 3.70 SQ.MT. A TOTAL ADDITION = 37.19 SQ.MT. X 2.270 2 2.270 X 1.330 X 1 NO = 3.02 SQ.MT. S. E. ( B. P. ) K/E-C A. E. ( B. P. ) K/E E. E. ( B. P. ) K/E 3 6.080 X 0.080 X 1 NO = 0.49 SQ.MT. 6.080 2 1.330 PROFORMA 'B' TOTAL DEDUCTION = 7.21 SQ.MT. Y1 3 0.080 CONTENTS OF SHEET TOTAL BUILT UP AREA [X - Y1] = 41.83 SQ.MT. X1 PROPOSED B.U. AREA STATEMENT OF EXISTING MEMBER, EXISTING MEMBERS LINE DIAG. FOR PROP. B.U.A. AREA FUNGIBLE STATEMENT ETC. LINE DIAG. FOR PROP. B.U.A. AREA CALC. OF FLAT NO. 3 FOR EXIST. MEMBER DESCRIPTION OF PROPOSAL & PROPERTY CALC. OF FLAT NO. 4 FOR EXIST. MEMBER PROPOSED REDEVELOPMENT OF EXIST. RESIDENTIAL BUILDING KNOWN AS ROSE BLOSSOM 1ST FLOOR (WING- B) 2ND FLOOR (WING- B) CHS. LTD. ON PLOT BEARING CTS NO. 260A OF VILLAGE MOGRA, K/E -WARD, NATWAR NAGAR ROAD NO. 05, JOGESHWARI EAST, MUMBAI - 400 060. SCALE - 1 : 100 SCALE - 1 : 100 NAME AND SIGNATURE OF OWNER / APPLICANT PROP. BUILT UP AREA CALCULATION 10.575 2.270 FLAT NO. 2, 2ND. FLOOR (WING- B) EXIST. MEMBER SHREE PRITESH DAMJI SAVLA PROP. BUILT UP AREA CALCULATION 10.690 A 10.575 X 4.950 X 1 NO = 52.35 SQ.MT. of M/s VINI DEVELOPERS FLAT NO. 1, 1ST. FLOOR (WING- B) EXIST. MEMBER 5.470 1 1.350 TOTAL ADDITION = 52.35 SQ.MT. X PRITESH Digitally signed by PRITESH A 10.690 X 4.950 X 1 NO = 52.92 SQ.MT. DAMJI DAMJI SAVLA 1 1.350 Date: 2024.10.01 TOTAL ADDITION = 52.92 SQ.MT. X DEDUCTIONS SAVLA 12:48:25 +05'30' 4.950 A 1 2.270 X 1.350 X 1 NO = 3.06 SQ.MT. DEDUCTIONS 2 2.900 X 0.390 X 1 NO = 1.13 SQ.MT. C.A. TO OWNER 1 5.470 X 1.350 X 1 NO = 7.38 SQ.MT. 4.950 A 3 5.030 X 0.390 X 1 NO = 1.96 SQ.MT. JOB NO. 2 5.070 X 0.390 X 1 NO = 1.98 SQ.MT. 2.890 4.955 TOTAL DEDUCTION = 6.15 SQ.MT. Y1 DRAWN BY TAWAKKAL DATE 27.09.2024 3 2.890 X 0.390 X 1 NO = 1.13 SQ.MT. 2 0.390 3 0.390 CHECKED BY TOTAL BUILT UP AREA [X - Y1] = 46.61 SQ.MT. X1 DEEPAK A. SCALE AS SHOWN TOTAL DEDUCTION = 10.49 SQ.MT. Y1 5.070 2.890 NORTH NAME, ADDRESS AND SIGNATURE OF ARCHITECT TOTAL BUILT UP AREA [X - Y1] = 42.43 SQ.MT. X1 2 0.390 3 0.390 AR. UJWAL SATISH BHOLE LINE DIAG. FOR PROP. B.U.A. AREA LINE DIAG. FOR PROP. B.U.A. AREA CA / 2010 / 47919 CALC. OF FLAT NO. 1 FOR EXIST. MEMBER CALC. OF FLAT NO. 2 FOR EXIST. MEMBER UJWAL Digitally signed N by UJWAL SATISH 1ST FLOOR (WING- B) 2ND FLOOR (WING- B) u b a r c h i t e c t s SATISH BHOLE 602 - B, Sarvoday 11, Kher Nagar, Date: 2024.09.27 BHOLE SCALE - 1 : 100 SCALE - 1 : 100 Bandra (East), Mumbai- 400051. www.ubarchitects.in 16:06:16 +05'30'