HARSHAD MAANOHAAR MORE B.E. Civil, M.I.E., Chartered Engineer (India) Licensed Surveyor ●Engineer●Consultant Regd Off: S.No.1, Priyadarshanee CHSL, Plot No.-111, RSC-11, Sector No.-1, Charkop, Kandivli (West), Mumbai-400 067. Corporate Off: Unit No. 417, Hive-67, Near Raghuleela Mall, Boraspada Road, Poisar, Mumbai - 400067, Tel: +91 22 46007019, +91 22 35220054, Email:: info@harshadmore.com ● Website: : www.harshadmore.in Annexure B FORM 2 [see Regulation 3] ENGINEER'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account-Project Wise) Date: 15/01/2026 To, BORIVALI KESAR KRIPA CHS LTD Mumbai Suburban, MAHARASHTRA,400092 Subject: Certificate of Cost Incurred for Development of BORIVALI KESAR KRIPA CHS LTD having MahaRERA Registration Number P51800053824 (Only Applicable after project Registartion) being developed by BORIVALI KESAR KRIPA CHS LTD Sir, I/We HARSHAD MAANOHAAR MORE have of Certifying Estimated Cost for BORIVALI KESAR KRIPA CHS LTD having MahaRERA Registration Number P51800053824 (Only Applicable after project Registration, being developed by BORIVALI KESAR KRIPA CHS LTD ) 2. We have Estimated the cost of Civil, MEP and allied works required for completion of the apartments and proportionate completion of internal & external works of the project as per specifications mentioned in agreements of sale. Our estimated cost calculations are bassd on the drawings/plans made available to us for the project under reference by the Developer / Consulatants. The Schedule of items and quantity required for the entire work as calculated by Quantity Surveyor* appointed by Developer/Engineer, the assumption of the cost of material,labour and other inputs made by developer,and the site inspection carried out by us to ascertain / confirm the above analysis given to us. 3. We estimate Total estimated the Cost of completion of thc aforesaid project under reference at Rs. 191718822.00 (Total of Table A and B) at the time of Registration. The estimated Total Cost of project is with reference to the Civil, MEP and Allied works required for completion of the apartments and proportionate completion of internal & external works as per specifications mentioned in agreements of sale and for the purpose of the obtaining occupation certificate / completion certificate for the Building(s) /Wing(s)/ Layout /Plotted Development from the P9034/2021/(17)/R/C Ward/FP being the Planning Authority under whose jurisidiction the aforesaid project is being implemented. 4. The Estimated Cost incured till date is calculated at Rs. 88343263.00 (Total of Table A and B).The amount of Estimated Cost incurred is calculated on the basis of input materials/services used and unit cost of these items. WE WORK ON PORTAL @ portal.harshadmore.com Integrated Multi‐Task Centralized Online Professional Services at One desk at HMM Online Portal Continuing sheet no.2 5. The Balance Cost of Completion of the Civil, MEP and Allied works for completion of the apartments andproportionate Complition of internal & external works, as per specification mentioned in agreement of sale, of the Project is estimated at Rs 103375559.00 (Total of Table A and B) 6. I certify that the Cost of the Civil, MEP and allied works the for the apartments and proportionate ate internal &external works,as per specification mentioned in agreement of sale, of the aforesaid Project as completed on the date of this certificate is as given in Table A and B below: Table-A Building/ Wing /Layout Plotted Development bearing Number :BORIVALI KESAR KRIPA CHSL/NA Sr. No. Particulars Amount (In Rs.) 1 Total Estimated Cost of the Building/Wing/Layout 177339910.00 Plotted Development as on date of Registration is 2 88343263.00 Cost incurred as on date of certificate 3 Work done in Percentage (as Percentage of the estimated cost) 49.82 4 Balance Cost to be Incurred**(Based on Estimated Cost) 88996647.00 5 Cost Incurred on the Additional/Extra items not included in the Estimated 0 Cost (Table-C) WE WORK ON PORTAL @ portal.harshadmore.com Integrated Multi‐Task Centralized Online Professional Services at One desk at HMM Online Portal Continuing sheet no.3 Table B Internal and External Development Works in respect of the Registered Phase Sr. No. Particulars Amount (In Rs.) (1) 1 Total Estimated Cost of the Building/Wing/Layout 14378912.00 Plotted Development as on date of Registration is 2 Cost incurred as on date of certificate 0 3 Work done in Percentage (as percentage of the estimated cost) 0 4 Balance Cost to be Incurred**(Based on Estimated Cost) 14378912.00 5 Cost Incurred on the Additional/Extra items not included in the Estimated Cost (Tablc -C) Yours Faithfully Digitally signed by HARSHAD MAANOHAAR MORE HARSHAD DN: c=IN, o=Personal, title=2026, pseudonym=133523704481301066aGEN2VI3442uWm, 2.5.4.20=18995ac26e64b9c7d987a775fa71ddb3d85eb4c77e736defa26a95f1 MAANOHAAR MORE e1f881d8, postalCode=400067, st=MAHARASHTRA, serialNumber=97fabe3f806890a6b178d1cdac07442d562edd4d87e56b1fd7f 5158415505575, cn=HARSHAD MAANOHAAR MORE Date: 2026.01.15 17:47:38 +05'30' HARSHAD MAANOHAAR MORE Signature & Name (IN BLOCK LETTERS) with Stamp of Engineer [Not Less than bachelor's Degree Holder or equivalent as per Scction 2(u) of thc Act] Local Authority license no. STR:840009956 (if applicable) Date of Certificate: Agreed and Accepted by: RAJENDRAKUMAR Digitally signed by RAJENDRAKUMAR NARENDRAKUMAR DAMANI DN: c=IN, o=Personal, title=1652, pseudonym=1333388521914696322H68lgE569ibR5, NARENDRAKUMAR 2.5.4.20=dad4e50afa756e7929cfa5267e7319bbfb27330815d3b8b9ac194 56373722046, postalCode=400092, st=Maharashtra, serialNumber=e031879a1fd82abe787701f77b091ed7829308057d557184 DAMANI 2f0d4e45a50eed65, cn=RAJENDRAKUMAR NARENDRAKUMAR DAMANI Date: 2026.01.15 11:52:44 +05'30' Signature of Promoter Name: BORIVALI KESAR KRIPA CHS LTD Date: 1.The scope of work is to complete Registered Real Estate Project as per drawings approved from time to time and as per specifications mentioned in agreement of sale. 2.(*) Quantity survey can be done by office of Engineer or can be done by an independent Quantity Surveyor,whose certificate of In case of independent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marked (*) and in case quantity are being calculated by office of Engineer,the name of the person in the office of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked (*). 3.(**) Balance Cost to be incurred (4) may vary from Difference between Total estimated Cost (1) and Actual Cost incurred (2) due to deviation in quantity required / escalation of cost etc. As this is an estimated cost, any deviation in quantity required for development of the Real Estate Project will result in amendment of the cost incurred / to be incurred. 4. All components of work with specifications are indicative and not exhaustive WE WORK ON PORTAL @ portal.harshadmore.com Integrated Multi‐Task Centralized Online Professional Services at One desk at HMM Online Portal Continuing sheet no.4 5. Please specify if there are any deviations / qualifications. Example: Any deviations in input material used from specifications in agreement of sale. TABLE C List of Extra/Additional/Deleted Items considered in Cost. ( which were not part of the original Estimate of Total Cost) Sr. No. List of Extra/Additional/Deleted Items Amount (In Rs) 1 0.00 2 0.00 WE WORK ON PORTAL @ portal.harshadmore.com Integrated Multi‐Task Centralized Online Professional Services at One desk at HMM Online Portal