HARSHAD MAANOHAAR MORE B.E. Civil, .M.I.E., Chartered Engineer (India) Licensed Surveyor ●Engineer●Consultant Corporate Off: S.No.1, Priyadarshanee CHSL, Plot No.-111, RSC-11, Sector No.-1, Charkop, Kandivli (West), Mumbai-67. Tel: +91 22 28671662 /+91 22 28671750 City Off: B/315, 3rd Floor, Antop Hill Warehousing Company Limited, Salt Pan Road, Near V.I.T. College, Antop Hill, Wadala (E), Mumbai-37, Tel: +91 22 24109662 Email:: info@harshadmore.com ● Website: : www.harshadmore.com Date: 18/10/2025 FORM-2 ENGINEER’S CERTIFICATE To, BORIVALI KESAR KRIPA CHSL, PLOT BEARING F.P. NO. 17 OF VILLAGE BORIVALI, T.P.S. NO. I, CHANDAVARKAR ROAD, R/C WARD, BORIVALI (WEST), MUMBAI. Subject: Certificate of Cost Incurred for Development of “BORIVALI KESAR KRIPA CO. OP. HO. SOCIETY LTD.", having MahaRERA Registration NumberP51800053824 being Developed by “BORIVALI KESAR KRIPA CO. OP. HO. SOCIETY LTD." Sir, I Harshad Maanohaar More have undertaken assignment of certifying estimated cost for “BORIVALI KESAR KRIPA CO. OP. HO. SOCIETY LTD."having MahaRERA Registration Number P51800053824 being developed by “BORIVALI KESAR KRIPA CO. OP. HO. SOCIETY LTD." 2. We have estimated the cost of Civil, MEP and allied works required for completion of the apartment and proportionate completion of internal and external work of the project as per specification mentioned in agreement of sale. Our estimated cost calculations are based on the drawings/plans made available to us for the project under reference by the Developer / Consultant. The schedule of items and quantity required for the entire work as calculated by - Mr. Harshad More Quantity Surveyor appointed by Developer/Engineer ,the assumption of the cost of material , labour and other inputs made by developers , and the site inspection carried out by us to ascertain / confirm the above analysis given to us. 3. We estimate Total Estimated cost of completion of the aforesaid project under reference at Rs.19,17,18,822/- (Total of Table A and B) at the time of Registration. The estimated total cost of projects is with reference to the Civil, MEP and Allied works required for completion of the apartment and the proportionate completion of internal and external work , as per specification mentioned in agreement of sale and for the purpose of obtaining occupation certificate / completion certificate for the building(s)/ wing(s)/ Layout/ Plotted development from the Slum Redevelopment Authority (S.R.A.) being the Planning authority under whose jurisdiction the aforesaid project is being implemented. WE WORK ON PORTAL @ portal.harshadmore.com Integrated Multi-Task Centralized Online Professional Services at One desk at HMM Online Portal Continuing sheet no.2 4. The estimated cost incurred till date is calculated at Rs 7,16,37,288/-(Total of table A and B). The amount of estimated cost Incurred is calculated on the basis of input materials / services used and unit cost of these items. 5. The balance cost of the completion of the Civil, MEP, and allied works for completion of the apartment and proportionate completion of internal and external works, as per specification mentioned in agreement of sale , of the project is estimated at Rs.12,00,81,534/-(Total of table A and B). 6. I Certify that the cost of the Civil, MEP and allied work for the apartments and proportionate internal and external work as per specification mentioned in agreement of sale , of the aforesaid project as completed on the date of this certificate is as given in the Table A and B below: TABLE – A Building / Wing / Layout / plotted development bearing Number F.P.No.17or called as “BORIVALI KESAR KRIPA CO. OP. HO. SOCIETY LTD Sr. No. Particulars Amount (In Rs.) 1. Total estimated cost of the building / wing/Layout / Rs. 17,73,39,910/- Plotted Development as on date of registration is 2. Cost Incurred as on the date of certificates on Rs. 7,16,37,288/- (30-09-2025) 3. Work done in percentage ( as percentage of estimates 40.40% cost) 4. Balance cost to be Incurred**( Based on estimated cost) Rs.10,57,02,622/- 5. Cost Incurred on Additional / Extra Items not included in N.A the Estimated cost ( Table –C) WE WORK ON PORTAL @ portal.harshadmore.com Integrated Multi-Task Centralized Online Professional Services at One desk at HMM Online Continuing sheet no.3 TABLE – B Internal & External Development Works in Respect of the Registered Phase Sr. No. Particulars Amount (In Rs.) 1. Total Estimated cost of the Internal and External Rs. 1,43,78,912/- Development Works Including amenities are Facilities in the layout as on date of Registration is 2. Cost incurred as on the date of certificates on 0 (30-09-2025) 3. Works done in Percentage( as Percentage of the estimated 0% cost) 4. Balance cost to the Incurred**( Based on Estimated cost) Rs. 1,43,78,912/- 5. Cost Incurred on Additional/Extra Items not included in N.A. the Estimated Cost (Table-C) Yours Faithfully, HARSHAD Digitally signed by HARSHAD MAANOHAAR MORE DN: c=IN, o=Personal, title=2026, pseudonym=133523704481301066aGEN2VI3442uWm, 2.5.4.20=18995ac26e64b9c7d987a775fa71ddb3d85eb4c77e MAANOHAAR 736defa26a95f1e1f881d8, postalCode=400067, st=MAHARASHTRA, serialNumber=97fabe3f806890a6b178d1cdac07442d562ed MORE d4d87e56b1fd7f5158415505575, cn=HARSHAD MAANOHAAR MORE Date: 2025.10.18 14:25:11 +05'30' HARSHAD MAANOHAAR MORE B.E. Civil, M.I.E., Chartered Engineer Licensed Surveyor M / 325 / LS Agreed and accepted by: RAJENDRAKUMAR Digitally signed by RAJENDRAKUMAR NARENDRAKUMA NARENDRAKUMAR DAMANI Date: 2025.10.18 15:55:38 R DAMANI +05'30' Signature of Promoter Name: Rajendra Kumar Damani Date: 18/10/2025 WE WORK ON PORTAL @ portal.harshadmore.com Integrated Multi-Task Centralized Online Professional Services at One desk at HMM Online