Annexure A FORM 1 [see Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) Date: 20/04/2026 To, BORIVALI KESAR KRIPA CHS LTD MUMBAI SUBURBAN, MAHARASHTRA, 400092 Subject : Certificate of percentage of Work of completion of construction work of BORIVALI KESAR KRIPA CHS LTD having MahaRERA Registration Number P51800053824 (Only Applicable after project Registartion) being developed by BORIVALI KESAR KRIPA CHS LTD Sir, I/We HARSHAD MAANOHAAR MORE have undertaken assignment as Architect /Licensed Surveyor of certifying Percentage of completion of Construction Work of BORIVALI KESAR KRIPA CHS LTD having MahaRERA Registration Number P51800053824 (Only Applicable after project Registration, being developed by BORIVALI KESAR KRIPA CHS LTD ) Based on Site Inspection,with respect to Layout / each of the Building/Wing of the aforesaid Real Estate Project I certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date of the Certificate) (1) (2) (3) 1 Excavation 100.00 2 Basements (if any) 75.00 3 Podiums (if any) 0.00 4 Plinth, 100.00 5 Stilt Floor 20.00 6 Slabs of Super Structure 100.00 7 Internal walls, Internal plaster, Floorings, Floors and windows within 50.00 Flats/Premises 8 Sanitary Fitting within the Flat/Premises 0.00 the activity of the entire phase is detailed in Table B. Page 1 of 3 Table A Layout/Building/Wing Number: BORIVALI KESAR KRIPA CHSL/NA Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date of the Certificate) 9 Staircases, lifts Wells and Lobbies at each Floor level Overhead and Underground 50.00 Water Tanks 10 External plumbing and external plaster, elevation, completion of terraces with 35.00 waterproofing of the Building/wing. 11 Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO 15.00 NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC, Finishing to entrance lobby/s, plinth protection,paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. Table B - Common Areas (Internal and External Development Works) in respect of Registered Phase / Project Number) Sr.No Common areas and facilities Is Available Percentage of Actual Details (Yes / No) Work Done (As on date of the Certificate) (1) (2) (3) (4) (5) 1 Internal Roads & Footpaths No 0.00 NA 2 Water Supply Yes 50.00 3 Sewerage (Chamber, Lines, Septic Tank , STP) Yes 75.00 4 Storm Water Drains Yes 0.00 WORK YET TO BEGIN 5 Landscaping & Tree Planting Yes 0.00 WORK YET TO BEGIN 6 Street Lighting No 0.00 NA 7 Community Buildings No 0.00 NA 8 Treatment And Disposal Of Sewage And Sullage Water No 0.00 NA 9 Solid Waste Management And Disposal Yes 0.00 WORK YET TO BEGIN 10 Water conservation /Rain water harvesting Yes 0.00 WORK YET TO BEGIN 11 Energy managemcnt No 0.00 NA 12 Fire protection and fire safety requirements Yes 40.00 13 Electrical meter room, sub-station, receiving station Yes 35.00 14 Aggregate area of recreational Open Space No 0.00 NA 15 Open Parking No 0.00 NA Page 2 of 3 Yours Faithfully Digitally signed by HARSHAD HARSHAD MAANOHAAR MORE MAANOHAAR MORE Date: 2026.04.20 10:55:44 +05'30' HARSHAD MAANOHAAR MORE Signature & Name (IN BLOCK LETTERS) of L.S/ Architect ( License No: M/325/LS) Date of Certificate: Agreed and accepted by: Digitally signed by RAJENDRAKUMAR RAJENDRAKUMAR NARENDRAKUMAR DAMANI NARENDRAKUMAR DAMANI Date: 2026.04.20 10:56:00 +05'30' Signature of Promoter Name: BORIVALI KESAR KRIPA CHS LTD Date: 20/04/2026 Page 3 of 3