FORM 1 [See Regulation 3] ARCHITECT’S CERTIFICATE Date: 28.06.2023 To, Shri. Pritesh D. Savla of M/s. Vini Developers CA to Rose Blossom CHSL 204-205 A-Wing, Kailash Towers, N.S Phadke Marg, Sahar Road, Andheri East, Mumbai- 400 069. Subject: Certificate of Percentage Completion of Construction Work of “RoseBlossom CHSL” One No. of Buildings(s)/2 Wing of the __Phase of the Project [MahaRERA Registration Number- ______________] situated on the Plot bearing CTS No. 262/A, demarcated by its boundaries ( ) CTS.NO – 253/A, 273 to the North, Existing Road No.05 having 12mtrs width of the South, CTS.NO – 263/4, to the East, CTS No. 261 & 258 to the West, of Division Kokan, Village Mogra, Taluka Andheri, District Mumbai Suburban, PIN – 400 060, admeasuring 959.02 sq.mts area being developed by M/s. Vini Developers. Ref: MahaRERA Registration Number ____________ Sir, I/We U.B ARCHITECTS have undertaken assignment as an Architect/Licensed Surveyor of certifying percentage of completion of construction work of Project “RoseBlossom CHSL” One No. of Buildings(s) 2 Wing of the ___Phase of the Project situated on the Plot bearing CTS No. 262/A, of Division Kokan, Village Mogra, Taluka Andheri, District Mumbai Suburban, PIN – 400 060, admeasuring 959.02 sq.mts area being developed by M/s. Vini Developers. 1. Following technical professionals are appointed by Owner / Promoter:–– (i) M/s/Shri/Smt. U B ARCHITECTS as Architect. (ii) M/s/Shri/Smt. S S PATANE ASSOCIATES as Structural Consultant. (iii) M/s/Shri/Smt. ANPRA ENTERPRISES as MEP Consultant. (iv) ) M/s/Shri/Smt. DINESH MEHTA as Site Supervisor. Office: 602-B, 11 Sarvoday, Kher Nagar, Bandra (East), Mumbai – 400051. | Tel: +91 22 2647 7036 Based on Site inspection, with respect to each of the Building of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project as registered vide number _________________ under MahaRERA is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. TABLE A Building / 2 Wings (to be prepared separately for each Building/Wing of the Project) Sr. No Tasks/ Activity Percentage of Work (1) Excavation 85% (2) One number of Plinth 30% (3) ____ Number of Podiums Nil (4) Stilt Floor No (5) ‘X’ Number of Slabs of Super Structure 0% (6) Internal Walls, Internal Plaster, Floorings within 0% Flats/Premises, Doors and Windows to each of the Flat/Premises (7) Sanitary Fittings within the Flat/Premises, Electrical 0% Fittings within the Flat/Premises. (8) Staircases, Lifts Wells and Lobbies at each Floor level 0% connecting Staircases and Lifts, Overhead and Underground Water Tanks. (9) The external plumbing and external plaster, elevation, 0% completion of terraces with water proofing of the Building/Wing. (10) Installation of lifts, water pumps, Fire Fighting Fittings and 0% Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to obtain Occupation / Completion Certificate. Office: 602-B, 11 Sarvoday, Kher Nagar, Bandra (East), Mumbai – 400051. | Tel: +91 22 2647 7036 TABLE B Internal and External Development Works in respect of the entire Registered Phase. Sr. Common Areas and Facilities, Proposed Percentage Details No. Amenities (Yes/No) of Work done (1) Internal Roads & Footpaths No - (2) Water Supply Yes 0% - (3) Sewerage (chamber, lines, Yes 0% - Septic Tank, STP) (4) Storm Water Drains Yes 0% (5) Landscaping & Tree Planting Yes 0% (6) Street Lighting Yes 0% (7) Community Buildings No - (8) Treatment and disposal of No - sewage and sullage water (9) Solid Waste management & No - disposal. (10) Water conservation, Rain water No - harvesting. (11) Energy management No - (12) Fire protection and fire safety Yes 0% requirements (13) Electrical meter room, sub- Yes 0% station, receiving station (14) Others ( Option to Add more) - - Yours faithfully, For M/s. UB Architects Ujwal Digitally signed by Ujwal Satish Bhole DN: C=IN, O=Personal, Phone=4c419438fd1b70f4e30bba7 86f07a717e4bee42297ed007baf7f 334e3730efa7, Satish PostalCode=425002, S=Maharashtra, SERIALNUMBER=87ef8ef6514575 b6a0b114c03543929a54507a3d00 a90897d4f6350dd78880ee, CN=Ujwal Satish Bhole Bhole Reason: I am the author of this document Location: your signing location here Date: 2023.06.29 11:25:57+05'30' Foxit PDF Editor Version: 11.2.2 Arch. Ujwal S. Bhole CA/2010/47919 Office: 602-B, 11 Sarvoday, Kher Nagar, Bandra (East), Mumbai – 400051. | Tel: +91 22 2647 7036