346 Form ------------ in replying please quote No. 88 and date of this letter. Intimation of Disapproval under Section 346 of the Mumbai Municipal Corporation Act, as amended up to date. No. P-8881/2021/(260 A And Other)/K/E Ward/MOGRA/IOD/1/New Dated- 15 February 2023 MEMORANDUM Municipal Office, Mumbai To, PRITESH DAMJI SAVLA of M/s VINI DEVELOPERS TO REDEVLOPMENT OF ROSE BLOSSOM CHSL 601 Ram kutir CHS, Natwar Nagar Road No.3 Behine Surjaba Vidyamandir School, Jogeshwari East, Mumbai:- 400060. With reference to your Notice 337 (New) , letter No. 4618 dated. 5/10/2021 and the plans, Sections Specifications and description and further particulars and details of your buildings at Proposed Redevelopment project of Rose Blossom on bearing on CTS No. 260,262,262/1 to 6 Natwar Nagar Road No.05 Jogeshwari East Mumbai – 400 060 CTS/CS/FP No. 260 A ,262 furnished to me under your letter, dated 5/10/2021. I have to inform you that, I cannot approve of the building or work proposed to be erected or executed, and I therefore hereby formally intimate to you, under Section 346 of the Mumbai Municipal Corporation Act as amended up to-date, my disapproval by reasons thereof :- A: CONDITIONS TO BE COMPLIED WITH BEFORE STARTING THE WORK. 1 That the commencement certificate under section 44/69(1)(a) of the M.R.T.P. act will not be obtain starting the proposed work. 2 That the compound wall is note constructed on all sides of the plot clear of the road widening line with foundation below level of bottom of the road side drain without obstructing the flow of rainwater from the adjoining holding to prove possession of holding as per D.C.P.R. 37(24) before starting the work. 3 That the low-lying plot will not be field upto a reduce level of at least 28.04 mtr. THD or 0.15 mtr. above adjoining holding level which is higher with marum, earth, boulders etc. and will not be levelled, rolled and consolidated and sloped towards road side, before starting the work. 4 That the structural Engineer will not be appointed. Supervision memo as per Annexure 2 of DCPR 2034 will not be submitted by him. 5 That the structural design and calculation for the proposed work and for existing building showing adequacy thereof to take up the additional load will not be submitted before C.C. 6 That the sanitary arrangement shall not be carried out as per Municipal specification and drainage layout will be submitted before C.C. Page 1 of 12 On 15-Feb-2023 No. P-8881/2021/(260 A And Other)/K/E Ward/MOGRA/IOD/1/New Dated- 15 February 2023 7 That the Indemnity Bond indemnifying the corporation for damage, risks, accidents etc. and to the occupiers and an undertaking regarding no nuisance will not be submitted before C.C. / starting the work. 8 That the requirements of N.O.C. of i)Power Supply company ii) S.G. iii) P.C.O. iv) A.A & C. v) S.P. vi) S.W.D. vii) M.T.N.L. viii) H.E. Will not be obtained and the requisitions if any will not be complied with before CC. 9 That the adequate safeguard shall not be employed in consultation with SWM Dpt. Of MCGM for preventing dispersal of particles through air. 10 That the comprehensive undertaking as per EODB and as per prescribed proforma for all relevant conditions for proposal under reference shall not be submitted before asking for CC. 11 That the qualified / registered site supervisor through architect/structural Engineer will not be appointed before applying C.C. 12 That “All Dues Clearance Certificate” related to H.E.’s dept. from the concerned A.E.W.W. [K/East Ward] shall not be submitted before applying for C.C. 13 That the development charges as per M.R.T.P. (amendment) Act 1992 will not be paid. 14 That the requisite premium as intimated will not be paid before applying for C.C. 15 That the C.C. shall not be asked unless payment of advance for providing treatment at construction site to prevent epidemics like Dengue, Malaria, etc. is made to the Insecticide Officer of the concerned Ward Office and provision shall be made as and when required by the Insecticide Officer for inspection of water tanks by providing safe but stable ladder, etc. and requirements as communicated by the Insecticide Office shall not be complied with. 16 That the Janata Insurance Policy in the name of site or policy to cover the compensation claims arising out of workman's compensation Act 1923 will not be taken out before starting the work and also will not be renewed during the construction work. 17 That the soil investigation will not be done and report thereof will not be submitted with structural design. 18 That the building will not be designed with the requirements of all relevant IS codes including IS code 1893 for earthquake design while granting occupation certificate from Structural Engineer to that effect will be insisted. 19 That no main beam in R.C.C. framed structure shall not be less than 230 mm. wide. The size of the columns shall also not be governed as per the applicable I.S. Codes. 20 That all the cantilevers [projections] shall not be designed for five times the load as per I.S. code 1893-2002. This also includes the columns projecting beyond the terrace and carrying the overhead water storage tank, etc. 21 That the R.C.C. framed structures, the external walls shall be less than 230 mm, if in brick masonary or 150 mm autoclaved cellular concrete block excluding plaster thickness as circulated under No. CE/5591 of 15.4.1974. 22 That the Vermiculture bins for disposal of wet waste as per the design and specification of Organizations /individuals specialized in this field, as per the list furnished by Solid Waste Management Department of M.C.G.M. shall not be provided to the satisfaction of Municipal Commissioner. Page 2 of 12 On 15-Feb-2023 No. P-8881/2021/(260 A And Other)/K/E Ward/MOGRA/IOD/1/New Dated- 15 February 2023 23 That the N.O.C. from E.E.[T&C]/ Consultant for parking layout in the basement / podium shall not be submitted. 24 That the owner/developer shall not display a board at site (photograph of board) before starting the work giving the details such as name and address of the owner/developer, architect and structural engineer, approval no. and date of the layout and building proposal, date of issue of C.C., area of the plot, permissible built up area, built up area approved, number of floors etc. 25 That the authorized Pvt. Pest Control Agency to give anti malaria treatment shall not be appointed in consultation with P.C.O.[K/E]. 26 That the debris removal deposit of Rs. 45,000/- or Rs. 22/- per sq.mt. of the built-up area, whichever is less will not be paid before further C.C. 27 That the N.O.C. from Collector – M.S.D. for excavation of land shall not be submitted. 28 That the Registered Agreement with the existing tenant along with the list will not be submitted before CC. 29 The developer shall not submit the registered undertaking agreeing to comply with & follow all the rules, regulations, circulars, directives related to the safety of construction labors/workers, issued time to time by the department of building & other construction labors, Government of Maharashtra. 30 That the R.U.T. shall not be submitted by the developer stating that they will not take any objection in future for the development on adjoining plot with deficient open spaces and also condition will be incorporated about deficient open spaces of proposed bldg. in the sale agreement of flats. 31 That the R.U.T. shall not be submitted by the developer stating: a) Fungible compensatory FSI for rehabilitation component shall not be used for sale component. b) For payment of difference for fungible, open space deficiency or any type of premium retrospectively as & when demanded by B.M.C. c) The difference of payment for additional 50% FSI shall be paid and calculated as per the revision of rates by the Government from time to time as per the condition No.5 mentioned in Notification and circular before requesting for C.C. d) The owner/developer stating that they will not take any objection in future for the development on adjoining plot with deficient open spaces and also condition will be incorporated about deficient open spaces of proposed building in the sale agreement of flats. e) The owner/developer to not to misuse the pocket/part terraces/voids and elevation features etc. f) The owner/developer for maintaining the noise levels as per the norms of Pollution Control Board. 32 That the RUT will not be submitted Indemnifying MCGM and MCGM officers will not be a party due to giving sanctioned for this proposal, in the case of any court cases, litigation etc. may be going on. 33 That the R.U.T. shall not be submitted by the developer stating: g) For not misusing the additional parking proposed for full potential of F.S.I. and will count the same in FSI or will be handed over to B.M.C. free of cost, if the building is not constructed for full potential. h) The conditions of E.E.(T&C) NOC/Parking consultant's remarks shall not be complied with and to that effect the mechanized parking equipped with safety measures shall be maintained permanently in safe condition to avoid any mishap and an indemnity bond indemnifying BMC and is officers against any litigation, costs, damages, etc. arising out of failure of mechanized system /nuisance due to mechanized system to any person shall not be submitted. i) Agreeing to comply with & follow all the rules, regulations, circulars, directives related to the safety of construction labors/workers, issued time to time by the department of building & other construction labours, Government of Maharashtra shall not be submitted. j) To sell the tenements/flats on carpet area basis only and to abide by the provision of MOFA (Act) amended upto date and the I.B. indemnifying the MCGM and its employees from any legal complications arising due to MOFA, shall not be submitted. k) For not misusing the part terrace and area claimed free of F.S.I. shall not be submitted. l) For basement will not comply with basement rules and regulations and Page 3 of 12 On 15-Feb-2023 shall not misuse the basement will not be submitted before C.C. No. P-8881/2021/(260 A And Other)/K/E Ward/MOGRA/IOD/1/New Dated- 15 February 2023 F.S.I. shall not be submitted. l) For basement will not comply with basement rules and regulations and shall not misuse the basement will not be submitted before C.C. 34 That the record of C & D generated shall be maintained on site and shall not be uploaded on Auto DCR system. 35 That the debris shall not be managed in accordance with the provisions of Construction and Demolition Waste Management Rules 2016. 36 That the work shall not be carried out between sunrise and sunset between 6.00 am to 10 pm only in accordance with Rule 54(3) of the Noise Pollution (Regulation & Control) Rules, 2000 and the provision of notification issued by Ministry of Environment and Forest department from time to time shall not be duly observed. (as per circular No. ChE/DP/7749/Gen dtd.07.06.2016 37 That the NOC from SWM shall not be obtained as per the policy in force for handling and transporting the construction and demolition waste. 38 That the consent letter from existing tenants for proposed additions/alterations in their tenement will not be submitted before C.C. 39 That the Indemnity Bond indemnifying the Corporation for damages, risks, accidents, etc.and to the occupiers and an undertaking regarding no nuisance will not be submitted before C.C./starting the work. 40 That the N.O.C. from Tree authority shall not be submitted before asking for plinth C.C. 41 That the copy of PAN card of the applicant shall not be submitted before C.C. 42 That the fresh P.R.Card in the name of owner shall not be submitted before C.C. 43 That the Remarks from consultants for E.E. Mech. (E.I.) P&D for the provision of artificial light, ventilation shall not be submitted. 44 That the NOC from EHO for nursinghome shall not be submitted. 45 This IOD is issued without prejudice to Legal matters pending in Court of Law if any. C: CONDITIONS TO BE COMPLIED BEFORE FURTHER C.C 1 That the plinth dimensions shall not be got checked from this office before asking for further C.C. beyond plinth. 2 That the no dues pending certificate from A.E. Water works "K/E" Ward shall not be submitted. 3 That the Fresh property card in the name of the owner shall not be submitted. 4 That the extra water and sewerage charges shall be paid to Asst.Engineer, Water Works, before C.C. 5 That the Structural stability certificate through Regd. Structural Engineer regarding stability of constructed plinth shall not be submitted before asking for C.C. beyond plinth. 6 That carriage entrance shall not be provided. 7 That the N.O.C. from Civil Aviation Department will not be obtained for the proposed height of the building. 8 That the name plate/board showing plot No.name of the building etc.will not be displayed at a prominent place before O.C.C./B.C.C. Page 4 of 12 On 15-Feb-2023 No. P-8881/2021/(260 A And Other)/K/E Ward/MOGRA/IOD/1/New Dated- 15 February 2023 9 That the final NOC from S.G. shall not be submitted. 10 That the structural stability certificate shall not be submitted. 11 That the N.O.C. from A.A. & C. [ K/E] shall not be submitted. 12 That the plinth/stilt height shall not be got checked by this office staff. 13 All the payments as intimated by various departments of MCGM shall not be paid. 14 That the debris shall not be transported to the respective Municipal dumping site and challan to that effect shall not be submitted to this office for record. 15 That the testing of building material to be used on the subject work shall not be done and results of the same will not be submitted periodically. 16 That the quality control for building work / for structural work / supervision of the work shall not be done and certificate to that effect shall not be submitted periodically in proforma. 17 That the verification of AMSL of completed work upto top of stilt/plinth level shall not be submitted 18 That the notice in the form of Annexure 14 of DCPR 2034(reg.11(4).shall not be submitted on completion of plinth. D: GENERAL CONDITIONS TO BE COMPLIED BEFORE O.C 1 That 10 ft.wide paved pathway upto staircase will not be provided. 2 That the fresh P.R. Card in the name of owner shall not be submitted. 3 That the satisfactory completion certificate from the I.S.I. mark company for installation of escalators shall not be submitted. 4 That the dust bin will not be provided. 5 That 3.00 mt. wide paved pathway upto staircase will not be provided. 6 That the name plate/board showing Plot No., Name of the Bldg. etc. will not be displayed at a prominent place. 7 That carriage entrance shall not be provided as per design of registered structural engineer and carriage entrance fee shall not be paid. 8 That final N.O.C. from concerned authorities / empanelled consultants for a)S.W.D. b)Parking c)Roads d)Sewerage e)Water Works f)CFO / Fire Fighting Provisions g)Mechanical Ventilation h)Tree authority i)Hydraulic Engineer shall not be submitted before occupation. 9 That the Final structural Stability Certificate and Structural Drawings shall not be submitted. 10 That Site Supervisor certificate for quality of work and completion of the work shall not be submitted in prescribed format. 11 That the surface drainage arrangement will not be made in consultation with E.E.(S.W.D.) or as per his remarks and a completion certificate will not be obtained and submitted before applying for occupation certificate/B.C.C. 12 That B.C.C. will not be obtained and IOD and debris deposit etc. will not be claimed for refund within a period of six years from the date of occupation. Page 5 of 12 On 15-Feb-2023 No. P-8881/2021/(260 A And Other)/K/E Ward/MOGRA/IOD/1/New Dated- 15 February 2023 13 That every part of the building constructed and more particularly overhead water tank will not be provided with the proper access for the staff of Insecticide Officer with a provision of temporary but safe and stable ladder. 14 That the owner/developer will not hand over the possession to the prospective buyer before obtaining occupation permission 15 That the letter box of appropriate size shall not be provided for all the tenements at the ground floor. 16 That the regulation No. 49 of D.C.P.R. 2034 shall not be complied with. 17 That the open spaces as per approval, parking spaces and terrace will not be kept open. 18 That the necessary arrangement of borewell shall not be made/provided and necessary certificate to that effect from the competent authority shall not be obtained before C.C. 19 That the Vermiculture bins for disposal of wet waste as per the design and specification of Organisations/individuals specialized in this field, as per the list furnished by Solid Waste Management Department of M.C.G.M. shall not be provided to the satisfaction of Municipal Commissioner. 20 That the Drainage Completion Certificate shall not be submitted. 21 That the S.W.D. Completion Certificate for Major nalla shall not be submitted. 22 That the Superintendent of Garden for tree authority Completion Certificate shall not be submitted. 23 That the Lift Inspector’s completion certificate shall not be submitted. 24 That the Final structural stability certificate and structural drawings shall not be submitted. 25 That the smoke test certificate shall not be submitted. 26 That the water proofing certificate shall not be submitted. 27 That the final completion certificate from C.F.O. shall not be submitted. 28 That the N.O.C. from A.A. & C. [K/East Ward] shall not be submitted. 29 That the A.M.S.L. of completed work (top of building) shall not be verified and submitted. 30 That the parking spaces shall not be provided as per D.C.P.R. of 2034 Reg. No. 44. 31 That the site supervisor certificate for quality of work and completion of the work shall be submitted in prescribe format. 32 That the infrastructure work such as construction of hand-holes/ manholes, ducts for underground cables, canceled wiring inside the flats/rooms/space for telephone installation etc. required for providing telecom service shall not be provided. F : CONDITIONS TO BE COMPLIED WITH OCCUPANCY (PERPETUAL). 1 1.That certificate under Sec. 270A of B.M.C. Act will not be obtained from H.E. Department regarding adequacy of water supply Page 6 of 12 On 15-Feb-2023 No. P-8881/2021/(260 A And Other)/K/E Ward/MOGRA/IOD/1/New Dated- 15 February 2023 ( ) That proper gutters and down pipes are not intended to be put to prevent water dropping from the leaves of the roof on the public street. ( ) That the drainage work generally is not intended to be executed in accordance with the Municipal requirements. Subject to your so modifying your intention as to obviate the before mentioned objections and meet by requirements, but not otherwise you will be at liberty to proceed with the said building or work at anytime before the 14 February day of 2024 but not so as to contrivance any of the provision of the said Act, as amended as aforesaid or any rule, regulations or bye-law made under that Act at the time In force. Your attention is drawn to the Special Instructions and Note accompanying this Intimation of Disapproval. Executive Engineer, Building Proposals, Zone, Wards. SPECIAL INSTRUCTIONS 1. THIS INTIMATION GIVES NO RIGHT TO BUILD UPON GROUND WHICH IS NOT YOUR PROPERTY. 2. Under Section 68 of the Bombay Municipal Corporation Act, as amended, the Municipal Commissioner for Greater Mumbai has empowered the City Engineer to exercise, perform and discharge the powers, duties and functions conferred and imposed upon and vested in the Commissioner by Section 346 of the said Act. 3. Under Byelaw, No. 8 of the Commissioner has fixed the following levels :- "Every person who shall erect as new domestic building shall cause the same to be built so that every part of the plinth shall be- a) Not less than, 2 feet (60 cms.) above the center of the adjoining street at the nearest point at which the drain from such building can be connected with the sewer than existing or thereafter to be- laid in such street b) Not less than 2 feet (60 cms.) Above every portion of the ground within 5 feet (160 cms.)-of such building. c) Not less than 92 ft. ([!TownHall]) above Town Hall Datum. 4. Your attention is invited to the provision of Section 152 of the Act whereby the person liable to pay property taxes is required to give notice of erection of a new building or occupation of building which has been vacant, to the Commissioner, within fifteen days of the completion or of the occupation whichever first occurs. Thus compliance with this provision is punishable under Section 471 of the Act irrespective of the fact that the valuation of the premises will be liable to be revised under Section 167 of the Act, from the earliest possible date in the current year in which the completion on occupation is detected by the Assessor and Collector's Department. 5. Your attention if further drawn to the provision of Section 353-A about the necessary of submitting occupation certificate with a view to enable the Municipal Commissioner for Greater Mumbai to inspect your premises and to grant a permission before occupation and to leavy penalty for non-compliance under Section 471 if necessary. 6. Proposed date of commencement of work should be communicated as per requirements of Section 347 (1) (aa) of the Bombay Municipal Corporation Act. 7. One more copy of the block plan should be submitted for the Collector, Mumbai Suburbs District. Page 7 of 12 On 15-Feb-2023 No. P-8881/2021/(260 A And Other)/K/E Ward/MOGRA/IOD/1/New Dated- 15 February 2023 8. Necessary permission for Non-agricultural use of the land shall be obtained from the Collector Mumbai Suburban District before the work is started. The Non-agricultural assessment shall be paid at the site that may be fixed by the Collector, under the Land Revenue Code and Rules there under. Attention is drawn to the notes Accompanying this Intimation of Disapproval. Page 8 of 12 On 15-Feb-2023 No. P-8881/2021/(260 A And Other)/K/E Ward/MOGRA/IOD/1/New Dated- 15 February 2023 No. EB/CE/ /BS /A/ NOTES 1) The work should not be started unless objections are complied with 2) A certified set of latest approved plans shall be displayed on site at the time of commencement the work and during the progress of the construction work. 3) Temporary permission on payment of deposit should be obtained any shed to house and store for construction purpose, Residence of workmen shall not be allowed on site. The temporary structures for storing constructional material shall be demolished before submission of building completion certificate and certificate signed by Architect submitted along with the building completion certificate. 4) Temporary sanitary accommodation on full flushing system with necessary drainage arrangement should be provided on site workers, before starting the work. 5) Water connection for constructional purpose will not be given until the hoarding is constructed and application made to the Ward Officer with the required deposit for the construction of carriage entrance, over the road side drain. 6) The owners shall intimate the Hydraulic Engineer or his representative in Wards atleast 15 days prior to the date of which the proposed construction work is taken in hand that the water existing in the compound will be utilised for their construction works and they will not use any Municipal Water for construction purposes. Failing this, it will be presume that Municipal tap water has been consumed on the construction works and bills preferred against them accordingly. 7) The hoarding or screen wall for supporting the depots of building materials shall be constructed before starting any work even though no materials may be expected to be stabled in front of the property. The scaffoldings, bricks metal, sand preps debris, etc. should not be deposited over footpaths or public street by the owner/ architect /their contractors, etc without obtaining prior permission from the Ward Officer of the area. 8) The work should not be started unless the manner in obviating all the objection is approved by this department. 9) No work should be started unless the structural design is approved. 10) The work above plinth should not be started before the same is shown to this office Sub-Engineer concerned and acknowledgement obtained from him regarding correctness of the open spaces & dimension. 11) The application for sewer street connections, if necessary, should be made simultaneously with commencement of the work as the Municipal Corporation will require time to consider alternative site to Page 9 of 12 On 15-Feb-2023 No. P-8881/2021/(260 A And Other)/K/E Ward/MOGRA/IOD/1/New Dated- 15 February 2023 avoid the excavation of the road an footpath. 12) All the terms and condition of the approved layout /sub-division under No. of should be adhered to and complied with. 13) No Building /Drainage Completion Certificate will be accepted non water connection granted (except for the construction purpose) unless road is constructed to the satisfaction of the Municipal Commissioner as per the provision of Section 345 of the Bombay Municipal Corporation Act and as per the terms and conditions for sanction to the layout. 14) Recreation ground or amenity open space should be developed before submission of Building Completion Certificate. 15) The access road to the full width shall be constructed in water bound macadam before commencing work and should be complete to the satisfaction of Municipal Commissioner including asphalting lighting and drainage before submission of the Building Completion Certificate. 16) Flow of water through adjoining holding or culvert, if any should be maintained unobstructed. 17) The surrounding open spaces around the building should be consolidated in Concrete having broke glass pieces at the rate of 12.5 cubic meters per 10 sq. meters below payment. 18) The compound wall or fencing should be constructed clear of the road widening line with foundation below level of bottom of road side drain without obstructing flow of rain water from adjoining holding before starting the work to prove the owner’s holding. 19) No work should be started unless the existing structures proposed to be demolished are demolished. 20) The Intimation of Disapproval is given exclusively for the purpose of enabling you to proceeds further with the arrangements of obtaining No Objection Certificate from the Housing Commissioner under Section 13 (h) (H) of the Rent Act and in the event f your proceeding with the work either without an intimation about commencing the work under Section 347(1) (aa) or your starting the work without removing the structures proposed to be removed the act shall be taken as a severe breach of the conditions under which this Intimation of Disapproval is issued and the sanctioned will be revoked and the commencement certificate granted under Section 45 of the Maharashtra Regional and Town Planning Act 1966, (12 of the Town Planning Act), will be with drawn. 21) If it is proposed to demolish the existing structures be negotiations with the tenant, under the circumstances, the work as per approved plans should not be taken up in hand unless the City Engineer is satisfied with the following:- i. Specific plans in respect of evicting or rehousing the existing tenants on hour stating their number and the areas in occupation of each. ii. Specifically signed agreement between you and the existing tenants that they are willing to avail or the alternative accommodation in the proposed structure at standard rent. iii. Plans showing the phased programme of constructions has to be duly approved by this office before Page 10 of 12 On 15-Feb-2023 No. P-8881/2021/(260 A And Other)/K/E Ward/MOGRA/IOD/1/New Dated- 15 February 2023 starting the work so as not to contravene at any stage of construction, the Development control Rules regarding open spaces, light and ventilation of existing structure. 22) In case of extension to existing building, blocking of existing windows of rooms deriving light and its from other sides should be done first starting the work. 23) In case of additional floor no work should be start or during monsoon which will same arise water leakage and consequent nuisance to the tenants staying on the floor below. 24) The bottom of the over head storage work above the finished level of the terrace shall not be less than 1.20 Mt.and not more than 1.80 mt. 25) The work should not be started above first floor level unless the No Objection Certificate from the Civil Aviation Authorities, where necessary is obtained. 26) It is to be understood that the foundations must be excavated down to hard soil. 27) The positions of the nahanis and other appurtenances in the building should be so arranged as not to necessitate the laying of drains inside the building. 28) The water arrangement nut be carried out in strict accordance with the Municipal requirements. 29) No new well, tank, pond, cistern or fountain shall be dug or constructed without the previous permission in writing of the Municipal Commissioner for Greater Mumbai, as required in Section 381-A of the Municipal Corporation Act. 30) All gully traps and open channel drains shall be provided with right fitting mosquito proof made of wrought iron plates or hinges. The manholes of all cisterns shall be covered with a properly fitting mosquito proof hinged cast iron cap over in one piece, with locking arrangement provided with a bolt and huge screwed on highly serving the purpose of lock and the warning pipes of the rabbet pretested with screw or dome shape pieces (like a garden mari rose) with copper pipes with perfections each not exceeding1.5 mm in diameter. The cistern shall be made easily, safely and permanently accessible be providing a firmly fixed iron ladder, the upper ends of the ladder should be earmarked and extended 40 cms above the top where they are to be fixed as its lower ends in cement concrete blocks. 31) No broken bottles should be fixed over boundary walls. This prohibition refers only to broken bottles to not to the use of plane glass for coping over compound wall. 32) a Louvres should be provided as required by Bye0law No. 5 (b) b Lintels or Arches should be provided over Door and Windows opening c The drains should be laid as require under Section 234-1(a) d The inspection chamber should be plastered inside and outside. 33) If the proposed additional is intended to be carried out on old foundations and structures, you will do so as your own risk. Page 11 of 12 On 15-Feb-2023 No. P-8881/2021/(260 A And Other)/K/E Ward/MOGRA/IOD/1/New Dated- 15 February 2023 Executive Engineer, Building Proposals Zones ……….…………….. wards. P-8881/2021/(260 A And Other)/K/E Ward/MOGRA/IOD/1/New Copy To :- 1. Ujwal Satish Bhole 602/ B, sarvodaya building no-11, kher nagar, next to PF building, service road, bandra east, mumbai 400051 2. Asst. Commissioner K/E Ward. 3. A.E.W.W. K/E Ward, 4. Dy.A & C. Western Suburb I 5. Chief Officer, M.B.R. & R. Board K/E Ward . 6. Designated Officer, Asstt. Engg. (B. & F.) K/E Ward , 7. The Collector of Mumbai Digitally signed by UDAY MANOHARRAO MAHAJAN Date: 15 Feb 2023 19:38:39 Organization :Brihanmumbai Municipal Corporation Designation :Executive Engineer Authority_Sign Page 12 of 12 On 15-Feb-2023