ANNEXURE A FORM 2A [See Regulation 3A.] ENGINEER'S CERTIFICATE FOR QUALITY ASSURANCE (Site Supervisor's Certificate) (To be submitted at end of the Financial Year) Date:3)/06/2026 To, The M.s Tulsiani Sumer Associates 1103 / 1104, Tulsiani Chambers 212, Nariman Point Mumbai- 400 02-L Quality Assurance Certificate (Certificate No.L for the year ending 31't March 2026) Subject : Certificate for quality of materials used and quality of construction and workmanship for the work of "Tulsiani Sumer Associates-MlNT PROIECT" having MahaRERA Registration Number P51800053816 being developed by M/s Tulsiani Sumer Associates. Sir, I, Jayesh D Mehta (B.E) have undertaken the assignment of supervision of this real estate project. Our Responsibility. To carry out the work in accordance with the development permission and as per the approved plan to submit certificate of supervision of work, to carry out material testing in- situ or in an authorized laboratory as per prevailing and applicable standards, to ensure quality of work and workmanship as per prescribed specifications, and as per NBC and / or other relevant code of practice. The details of the quality are as follows : 7. Structural Desigo Stability and Testing Sr.No. Parameters Yes No Remarks 1 Whether soil investigations of the site Yes has been conducted before the structural design and soil parameters have been accounted for in the structural design/ drawines? 2 Whether Structural Engineer has been Yes Name: Mr. Ashesh appointed for the project? Raghuvir Keni License No:/STR- 840017195 Mobile:9822101646 E- mail:keni66@vahoo.com J Whether the inspection registers, site Yes Yes order book and quality control test registers are maintained at the site properly and endorsed by the Engineer-in-Charge? 4 Whether testing facilities to check No Material is tested in quality of material is available at site? laboratory 5 Whether the statuary provisions for Yes Earthquake Resistant disaster resistance/earthquake Design resistant design have been incorporated, specially in case of multi-storeyed construction? 6 Has suitable cognizance been taken on Yes demarcated flood lines and appropriate precautions taken for protecting the site from flooding considering local floodine issues? 2. Input Materials Sr. No. Parameters Yes No Remarks 1, Whether the following building materials Yes BIS standards confirm to relevant IS/BS/NBC Code, or as per Industry Standards? If ves, provide details: (a) Cement, concrete and coarse aggregate Yes (b) Steel and its alloys Yes (c) Electrical wire, fittinss and accessories Yes (d) Plumbinq and sanitary fittinss Yes 2 Whether regular tests of materials and Yes construction products are being done from accredited labs also? If yes, details of such labs J Whether manufacturer test certificate for Yes cement, steel, pipes etc. have been obtained and whether supply records are being maintained? 4 Whether suitable water is being used for Yes i) Water is construction? sourced from (i) What is the source of water? private tanker supplier. (il) Has water been tested and approved by ii)No Engineer-in-Charge before construction? iii)No (ill) Has water been tested subsequently AS per requirement? 3. Quality of Workmanship Sr.No. Parameters Yes Yes No Remarks 1 Whether works of all the electrical wfung/ Yes Work-in- connections/lift installanon / other electrical process installations have been carried out under authorized /registered electrical engineer and whether records of the same has been maintained? 2 Whether all related works of plumbing & Yes Work-in- sanitary including installation of water process supply systems, drainage systems, sewage systems, sinks, toilets etc. have been carried out under authorized /registered plumbers f sanitary contractors and whether records of the same has been maintained? J Whether all the work is being carried out Yes under supervision of experienced and skilled professional? Further, whether the workmanship and quality is satisfactory and up to the mark and the work is within the acceptable and permissible limits of deviations asper relevant Code of Practice? 4 Whether remedial measures are undertaken Yes We use Pu to prevent dampness and leakages? If yes, coating and provide details cementitious coatings 5 Whether safety precautions are undertaken Yes during construction activities for all ffpe of workers? 4. Miscellaneous Sr.No. Parameters Yes No Remarks 1 Whether third party quality inspection is No being carried out on site during/after completion of the works? If ves, provide details. 2 Whether anti-termite treatment has been Yes undertaken for the soil? J Whether fire-fighting arrangements has Yes been undertaken under supervision of fire consultant? 4 Whether proper signages have beer-r installed No Building is on site/cornpleted building as Per under recluirement? construction. 5 Whether precautions are undertaken to Yes Utilization of avoid air pollution during construction? anti-smog gun Please specify. is carried out at site 6 Whether records of all test reports / results Yes have been properly kept in the prescribed forrnats and wl'rether the same are available at site for vierving by allottees and to behanded over to the association of allottees? 7 Whether all relevant records including Ycs sanctioned building plans, utility drawings, various test reports / results have been properly kept in the prescribed formats to be handed over to the association of allottees? B Any innovative/ cost effective/ greell No technology has been used for improving quality/energy efficiency? Please specify You rs Fa ith f u lly, \ \.q a*cF., ,t)"/ ' -z(.-1€.*v -'llL - Signattrre of Engineer (Site Supervisor) Name: Mr. ]AYESI{ D MEHTA Qualification: B.E. License No. SUP/ GRADE 1..840004986 Phone No: (022) 46013296 Place:MUMBAI Agreed ar-rd accepted by Signature of Promoter M\ FoT TULSIANI SUMER ASSOCIATES ry--- Name : (Mr.Raghuvir S Kuwelker)