Iayesfr.A. ful.efita (8. E- Civil Engineer) Sahar Plaza Complex, Andheri Kurla Road, Andheri (East) Mumbai- 400 059 Tel: (022) 4601 3296 A.IIIIEI(T.IRE - B FOR![ - 2 [See Regulation] EITGINEER'S CERTIHCATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal ( of Money from Designated Account - Project Wise) Date: 3l.i December 2023 To, M/s Tulsiali Sumer Associates. 1lO3 / L LO4, Tulsiani Chambers 2 12, Nariman Poinr Mumbai - 4OO O2l Subject : Certificate of Cost Incurred for Development of .Tulsiani Sumer Associates- MMT PROJTCT' having MahaRERA Registration Number (-- P518OOO53a16 (Only Applicable after project Registration) being developed by M/s Tulsiani Sumer Associates. Sir, I, Jayesh D Mehta have undertaken assignment of certif.ing Estimated Cost for 4Tnkiani Sumer Associates- IIDIT PROJECT" Wiag Af having lBldg.!to.3 MahaRERA Registration Number P51AOOO53816 (Only applicable after project Registration being developed by M/s Tulsiani Sumer Associates. Iaysfr.(D. fulefrta (B.E- Civil Engineer) Sahar Plaza Complex, Andheri Kurla Road, Andheri (East) Mumbai- 400 059 Tel: (022) 4601 3296 2. We have estinated the cost of Civil, MEP ald allied works required for completion of the apartments and proportionate completion of internal & external works of the project as per specifications mentioned in agreement of sale. Our estimated cost calculations are based on the drawings/plans made available to r.rs for tJ:e entire work as calculated by Jayesh D Mehta (Quantity Surveyor* appointed by Developer/ Engineer, the assumption of the cost of materia-I, labour and other inputs made by developer, and the site inspection ( carried out by us to ascertain/confirm the above analysis given to us. 3. We estimate Tota-l Estimated Cost of completion of the a-foresaid project under reference at Rs.216,O1,8 3,6771 - (Total of Table A) at the tilae of Registration. The estimated Total Cost of project is with reference to the Civil, MEP and Alted works required for completion of the apartments and proportionate completion of internal & external works, as per specifications mentioned in agreement of sale and for the purpose of obtaining occupation certificate/completion certificate for the Building(s)/Wing(s)/Layout/Plotted Development from the Brihalmumbai Municipal Corporation being the Planning Authority under whose jurisdiction the aforesaid project is being implemented. I 1. The Estimated Cost Incurred till date is ca.lculated at Rr 65,69,a5,a51/- (Total of Table B). The amount of Estimated Cost Incured is calculated on the basis of input materials/ sewices used and unit cost of these items. The Ba-lance Cost of Completion of the Civil, MEP and Allied works for completion of the apartments and proportionate completion of internal & external works, as per specifications mentioned in agreement of sale, of the Pmject is estimated at Rs 149,31,97,a261- (Total of Table A and B). Jaysfi.(D. fulefrta (B. E- Civil Engineer) Sahar Plaza Complex, Andheri Kurla Road, Andheri (East) Mumbai- 400 059 Iel: (022) 46013296 6. I certi8/ that the Cost of the Civil, MEP and allied work for the apartments and proportionate internal & external works, as per specifications mentioned in agreement of sale, of the aforesaid Project as completed on the date of this certificate is as given in Table A and B below: TABLE A ( Building/Wing/Layout/Plotted Development bearing Number Building lto 3 Wing A, UIfYT BUILDMG_ or called (to be prepared separately for each Building/Wing/Layout/Plotted Development of the Real Estate Project) Sr. No. Particulars Amount {in Rs.f 1. Total Estimated Cost of the t96,Or,a3,677 / - Building/Wing/Layout/Plotted Development as on date of Registration is 2. Cost incurred as on date of certificate 66,69,a5,A51 / - Work done in Percentage) as Percentage of the 34.O2o/o estimated cost) 4. Balance Cost to be Incurred"" (Based on Estinated 129 ,31,97 ,a26 / - Cost) 5. Cost Incurred on Additional/ Extra Items not NIL- included in the Estimated Cost (Table - C) TABLE B Internal & External Development Works in Respect of the Registration Phase Sr. No. Particulars Amount (In Rs.l 1. Total Estimated Cost of the Internal and External 2O,OO,OO,OOO/- Development Works including amenities and Facilities in the layout as on date of Registration is flaysfi.(D. fuLefrta (8. E- Civil Engineer) Sahar Plaza Complex, Andheri Kurla Road, Andheri (East) Mumbai- 400 059 Tel: (022) 46013296 2. Cost incurred as on date of certifrcate 3. Work done in Percentage (as Percentage of the O.OOo/o estimated cost) 4. Balance Cost to be Incurred (Based on Estimated 2O,OO,OO,OOO/- Cost) 5. Cost Incurred on Additional/Ertra Items not included in the Estimated Cost (Table - C) Yours faithfullv. "' ( s o'"o/ ^,*'q f-o.'t." (JAYESH D MEHTA) (in Block letters) with Sta:np of Engineer [Not Less than Bachelor's Degree Holder or equivalent as per Section 2(u] ofthe Act] Agreed and Accepted by: For T\rlsiani Sumer Associates (Mr. RagTiiir.sTffiEr) Partner Signature of Promoter ( Date: Note: 1. The scope of work is to complete Registered Real Estate Project as per drawings approved from time to time and as per specifications mentioned in agreement of sale. (*) Qualtity survey can be done by of{ice of Engineer or can be done by an independent Quantity Surveyor, whose certificate of quantit5z ca_lculated can Iayesfr .(D. folefita (B.E- Civil Engineer) Sahar Plaza Complex, Andheri Kurla Road, Andheri (East) Mumbai- 400 059 Tel: (022) 460t3296 be relied upon by the Engineer. In case ofindependent quantity surveyor being appointed by Developer, tJle name has to be mentioned at the pLace marked f) and in case quantity are being calculated by oflice of Engineer, the name of the person in the office of Engineer, who is responsible for the quantity ca-lculated should be mentioned at the place marked (*). J. (**) Balance Cost to be incurred (4) may varSr from Difference between Total estimated Cost (l) ald Actua.l Cost incurred (2) due to deviation in quantity required/escalation of cost etc. As this is an estimated cost, zrny deviation in ( quantity required for development of the Real Estate Project will result in aleendment of the cost incurred/to be incurred. 5. All components ofwork with specifications are indicative and not exhaustive. 6. Please specifu if there are any deviations/qualifications. Exarnple: Any deviations in input material used from specifications in agreement of sale. TABLE C List of Extra/Additional/Deleted Items considered in Cost (which were not part of the original Estimate of Total Cost) Sr. A,nount I No. Li:t of &dra/Additional/Deleted Items (in Rs.l 1. 2.