SORB OESIGN ANIYEXURE . A roRu - 1 [see Regulation 3] ARCIIITECT'S CERTItrICATD (To be submitted at the time of Registration of Ongoing Project arld for withdrawal of Money from Desipnated Account) Date 31st December 2O23 To, M/s Tulsiani Sumer Associates. l1O3/ 1104, Tulsiani Chambers 212, Nariman Point Mumbai- 4OO O21 ; ; Subject: Certificate of Percentage of Completion of Construction Work of "Tulsiani Sumer Associatee- UIITT PRGIECT" having MahaRERA Registration Number P518OOO53a16 (Only Applicable a.fter Registration) being developed by M/s Tulsiani Sumer Associates. : ST, I, Mr Bergees Rusi ltalia, Proprietor of M/s Ratnsorb Architecture & Desigo. have undertaken assignment as Architect/ Licensed Surveyor of certi-$ing Percentage of Completion of Construction Work of 'Tulsiaat Sume r Ascociates- UUIT PRQIE,CT" (Bld. No. 3 Wing A) having MahaRERA Registration Number PSI8OOO53816 (Only Applicable a-fter Registration) being developed by Tulsiani Sumer Associates. Based on Site Inspection, with respect to Layout/each of the Building/Wing of the aforesaid Real Estate Project. I certily tlnt as on the date of tJ:is certificate, ttre Percentage of Work done for each of the building/Wing of the ReaI Estate Project under MahaRERA is as per Table A herein below. The percentage of the work executed wit1. respect to each of the activity of the entire phase is detailed in Table B. TABLE -A MNT (Bld. No. 3 Wing A) Number (to be prepared separately for each Layout/Building/Wing of the Project) Sr. Percentage of Actual Tasks/ Activity Work Done IIo. (r) l2l {As on 31.12.2023} (3t l. Excavation 10u% 2. Basements (if aly) 1o@h 3. Podiums (if any) lO@/o 4. Plinth tou|/o 5. Stilt Floor 7 5r,/o 6. Slabs of Super Structure 53/o 7. Interna-l wa-lls, Internal Plaster, Floorings, Doors and t?/o windows within Flats/ Premises 8. Sanitary Fittings w'ithin the Flat/Premises o 9. Staircases, Lifts Wells and Lobbies at each Floor level t0/o Overhead and Underground Water Tarrks 10- External plumbing and externa-1 plaster, elevation, o completion of terraces with waterproofing of the Building/Wing. "; 11. Installation of Lifts, water puops, Fire Fighting Fittings o and Equipment as per CFO NOC, Electrical littings, mecharrical equipment, compliance to conditions of environment/CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appultenaxt to Building/Wing. Compound Wa1l arrd all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other i" activities. TABLE - B Common Areas (Internal and &tteraal Developmeat Worksl in respect of the E I s 0 I B oEsroN Registered Phase/ Project Number Percentage of Sr. Common areas and Proposed Actual trrork No. Facilities (Yes/NoI Done Details {Ae on (sl l1) l2l (31 3L.t2.2O2Sl t4t 1. lnternal Roads & Footpaths yes 5@/o 2. Water Supply yes Labor drinking purpose 3. Sewerage (Chamber, lines, yes lgtt STP STP) complete, ; common sewer line cotnplete 4. Storm Water Drains yes 65o/o "; 5. La-ndscaping & Tree yes o Planting 6. Street Lighting yes o 7. Community Buildings no NA 8. Treatment and disposal of yes 10@t STP sewage and sullage water. 9. Solid Waste management & yes Through 1. Disposal MCGM Authorised vendor 10. Water conservation/Rain yes 0 water harvesting 11. Enerry management yes o 1,2. Fire protection and fire VCS safety requirements 3 s 0 R I DES GN Electrical raeter room, sub- yes Receiving station, receiving station. construction power supply company 1O@/o complete Others (Option to Add more) Yours faithfully, ; ; : ITAIIA) -s Ratnsorb Architecture & Design : & Na-me "; (IN BLOCK LETTERS) of L.S/Architect (License No. CA/99 /243751 Agreed and Accepted by: Signature of Promoter 4\- M/s Tulsiani Sumer Associates Mr. Raghuvir-Sadgshiv Kuwelker (Partner) Nam.e: Date:3t/12/2023