FOUNTAINHEAD ENGINEERS Civil & Structural Consultants Annexure-B FORM-2 [See Regulation 3] ENGINEER'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account - Project Wise) Date: 31/03/2025 To. M/S Gurukrupa Realcon Lifespaces LLP C-106, Vashi Plaza, Vashi-Navi Mumbai-400703. Subject: Certificate of Cost Incurred for Development of “GURUKRUPA SHARANAM” having MahaRERA Registration Number P51800053804 (Only Applicable after project Registration) being developed by Gurukrupa Realcon Lifespaces LLP Sir, 1. I, Chirag Dilipkumar Jain have undertaken assignment of certifying Estimated Cost for GURUKRUPA SHARANAM having MahaRERA Registration Number P51800053804 (Only Applicable after project Registration being developed by GURUKRUPA REALCON LIFESPACES LLP. 2. We have estimated the cost of Civil, MEP and allied works required for completion of the apartments and proportionate completion of internal & external works of the project as per specifications mentioned in agreement of sale. Our estimated cost calculations are based on the drawings/plans made available to us for the project under reference by the Developer / Consultants. The Schedule of items and quantity required for the entire work as calculated by M/S FountainHead Engineers (Mr. Chirag Dilipkumar Jain) Quantity Surveyor* appointed by Developer/Engineer, the assumption of the cost of material, labour and other inputs made by developer, and the site inspection carried out by us to ascertain/confirm the above analysis given to us. 3. We estimate Total Estimated Cost of completion of the aforesaid project under reference at Rs. 35,00,00,000/- (Total of Table A and B) at the time of Registration. The estimated Total Cost of project is with reference to the Civil, MEP and Allied works required for completion of the apartments and proportionate completion of internal & external works, as per specifications mentioned in agreement of sale and for the purpose of obtaining occupation certificate/completion certificate for the Building(s) / Wing(s)/ Layout/ Plotted Development from the Maharashtra Housing Development Authority, Building Permission Cell, Greater Mumbai/MHADA being the Planning Authority under whose jurisdiction the aforesaid project is being implemented. 4. The Estimated Cost Incurred till date is calculated at Rs. 27,0,00,000/- (Total of Table A and B). The amount of Estimated Cost Incurred is calculated on the basis of input materials /services used and unit cost of these items. 5. The Balance Cost of Completion of the Civil, MEP and Allied works for completion of the apartments and proportionate completion of internal & external works, as per specifications mentioned in agreement of sale, of the Project is estimated at Rs. 8,00,00,000/-(Total of Table A and B). 6. I certify that the Cost of the Civil, MEP and allied work for the apartments and proportionate internal & external works, as per specifications mentioned in agreement of sale, of the aforesaid Project as completed on the date of this certificate is as given in Table A and B below: Address: A/502, Suparshwa Apt. S.L.Matkar Marg, Prabhadevi, Mumbai -25. Contact: +91-9773706772. Email: chirag.fountainhead@gmail.com FOUNTAINHEAD ENGINEERS Civil & Structural Consultants TABLE A Building/Wing/Layout/Plotted Development called GURUKRUPA GYANAM (to be prepared separately for each Building/Wing/Layout/Plotted Development of the Real Estate Project) Sr. No. Particulars Amount (In Rs.) 1. Total Estimated Cost of the Building/Wing/Layout Plotted Development 35,00,00,000/- as on date of Registration is 2. Cost incurred as on date of certificate 27,00,00,000/- 3. Work done in Percentage (as Percentage of the estimated cost) 77.14% 4. Balance Cost to be Incurred** (Based on Estimated Cost) 8,00,00,000/- 5. Cost Incurred on Additional/Extra Items not included in the Estimated - Cost (Table-C) TABLE B Internal & External Development Works in Respect of the Registered Phase Sr. No. Particulars Amount (In Rs.) 1. Total Estimated Cost of the Internal and External Development Works - including amenities and Facilities in the layout as on date of Registration is 2. Cost incurred as on date of certificate - 3. Work done in Percentage (as Percentage of the estimated cost) - 4. Balance Cost to be Incurred (Based on Estimated cost) - 5. Cost Incurred on Additional Extra Items not included in the Estimated Cost - (Table-C) Yours Faithfully, Digitally signed by CHIRAG DILIPKUMAR JAIN CHIRAG DN: c=IN, o=Personal, postalCode=400028, l=Mumbai, st=Maharashtra, street=Room no 1 sardar bldg siddhi chawl-10 bhawani shankar road near masjid dadar west maharashtra 400028, title=9915, 2.5.4.20=b86396f9c6f377e1217f1d0e003491521e56053f7e36d8c056c5b DILIPKUMAR JAIN cd5c15eeb1a, serialNumber=b522375a4ef081ba2d874378fbc4b3ff1f929767770da96a5 9964b7fa0990c5f, email=chiragjain2310@gmail.com, cn=CHIRAG DILIPKUMAR JAIN Date: 2025.04.23 22:21:36 +05'30' Chirag Dilipkumar Jain Practising Chartered Engineer, M. Tech (Str.) (MCGM License No. STR/J/97) Agreed and Accepted by: For Gurukrupa Realcon Life spaces LLP Digitally signed Signature of Promoter Mahesh by Mahesh Lira Verat Name: MAHESH LIRA VERAT Lira Verat Date: 2025.04.24 10:37:12 +05'30' Date:31/03/2025 Address: A/502, Suparshwa Apt. S.L.Matkar Marg, Prabhadevi, Mumbai -25. Contact: +91-9773706772. Email: chirag.fountainhead@gmail.com FOUNTAINHEAD ENGINEERS Civil & Structural Consultants Note: 1. The scope of work is to complete Registered Real Estate Project as per drawings approved from time to time and as per specifications mentioned in agreement of sale. 2. (*) Quantity survey can be done by office of Engineer or can be done by an independent Quantity Surveyor, whose certificate of quantity calculated can be relied upon by the Engineer. In case of independent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marked (*) and in case quantity are being calculated by office of Engineer, the name of the person in the office of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked (*). 3. (**) Balance Cost to be incurred (4) may vary from Difference between Total estimated Cost (1) and Actual Cost incurred (2) due to deviation in quantity required/escalation of cost etc. As this is an estimated cost, any deviation in quantity required for development of the Real Estate Project will result in amendment of the cost incurred / to be incurred. 4. All components of work with specifications are indicative and not exhaustive. 5. Please specify if there are any deviations/qualifications. Example: Any deviations in input material used from specifications in agreement of sale. Table C List of Extra/Additional/ Deleted Items considered in Cost (Which were not part of the original Estimate of Total Cost) Sr. No. List of Extra/Additional / Deleted Items Amount (In Rs.) 1. 2. Address: A/502, Suparshwa Apt. S.L.Matkar Marg, Prabhadevi, Mumbai -25. Contact: +91-9773706772. Email: chirag.fountainhead@gmail.com