I HIruEOO trAf(h il ir.l 1,1 &rfh (u511 tl :! (r.[ iuli] ARCHITECTS Annexure A FORM 1 fsee Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) R/1901,/2026/Rera1.4 20.07.2026. To, PRANAV CONSTRUCTIONS LIMITED MUMBAI SUBURBAN, MAHARASHTRA, 4OO'I 04 Subject : Certificate of percentage of Work of completion of construction work of REDEVELOPMENT OF SHINING STAR CHSL having MahaRERA Registration Number P51800053810 (Only Applicable after project Registartion) being developed by PRANAV CONSTRUCTIONS LIMITED Sir, l/We RASIK P HINGOO AND ASSOCIATES have undertaken assignment as Architect /Licensed Surveyor of certifying Percentage of completion of Construction Work of REDEVELOPMENT OF SHINING STAR CHSL having MahaRERA Registration Number P51800053810 (Only Applicable after project Registration, being developed by PRANAV CONSTRUCTIONS LlMlrED ) Based on Site lnspection,with respect to Layout / each of the BuildingMing of the aforesaid Real Estate Project I certify that as on the date of this certificate, the Percentage of Work done for each of the buildingM/ing of the Real Estate Project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Table A LayouUBuilding/Wing Number: SHINING STAR CHSL- WING 'A' Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date of the Certificate) (1) (21 (3) 1 Excavation 100% 2 Basements (if any) 0.00 3 Podiums (if any) 0.00 4 Plinth, 100% 5 Stilt Floor 9504 b Slabs of Super Structure 100% 7 lnternal walls, lnternal plaster, Floorings, Floors and windows within 8SYo Flats/Premises Sanitary Fitting within the FlaVPremises 600/o Page 1 of 4 Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date of the Certificate) 9 Staircases, lifts Wells and Lobbies at each Floor level Overhead and 95%o Underqround Water Tanks 10 External plumbing and external plaster, elevation, completion of terraces with 85% waterDroofi nq of the Buildino/wino. 11 lnstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per 25Yo CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environmenUCRZ NOC, Finishing to entrance lobby/s, plinth protection,paving of areas appurtenant to BuildingA//ing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. LayouUBuildingMing Number: SHINING STAR CHSL- WING 'B' Sr. No. Ta'sks/Activity Percentage of Actual Work Done (As on date of the Certificate) (1) (21 (3) ,| Excavation 11Qo/o 2 Basements (if any) 0.00 3 Podiums (if any) 0.00 4 Plinth, 100% 5 Stilt Floor 100o/o o Slabs of Super Structure 1000/ 7 lnternal walls, lnternal plaster, Floorings, Floors and windows within 90% Flats/Premises 8 Sanitary Fitting within the FlaVPremises 60% 9 Staircases, lifts Wells and Lobbies at each Floor level Overhead and 95% Underqround Water Tanks '10 External plumbirng and external plaster, elevation, completion of terraces with 90% waterprooflnq of'th e Buildinq/winq. 11 lnstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per 250h CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ol environmenVcRZ NOC, Finishing to entrance lobby/s, plinth protection,paving of areas appurtenant to BuildingANing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities LayouUBuildingMing Number: SHINING STAR CHSL WING'C' Sr. No. Tasks/Activity Percentage of Actua! Work Done (As on date of the Certificate) (1) tzl (3) 1 Excavation 1000k 2 Basements (if any) 0.00 3 Podiums (if any) 0.00 4 Plinth 100o/o 5 Stilt Floor 100o/o 6 Slabs of Super Structure 100o/o 7 lnternal walls lnternal plaster, Floorings, Floors and windows within 90% Flats/Premises 8 Sanitary Fittinq within the FlaVPremises 60% I Staircases, lifts Wells and Lobbies at each Floor level Overhead and 95% Underoround Water Tanks 10 External plumbing and external plaster, elevation, completion of terraces with 90o/o waterproofi no of the Buildinq/wing. 11 lnstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per 25%o CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environmenVcRZ NOC, Finishing to entrance lobby/s, plinth protection,paving of areas appurtenant to BuildingMing, Compound Wall and all other requirements as may be required to comflete project as per specifications in agreement of Sale Any other activities. LayouUBuildingMing Number: SHINING STAR CHSL- WING D/NA Sr. No. Tasks/Activity Percentage of Actua! Work Done (1) (2t (3) Page 2 oI 4 Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date of the Certificate) 1 Excavation 100% 2 Basements (if anv) 0.00 3 Podiums (if any) 0.00 4 Plinth 100% 5 Stilt Floor 95% 6 Slabs of Super Structure 100% 7 lnternal walls, lnternal plaster, Floorings, Floors and windows within 900h Flats/Premises 8 Sanitary Fitting within the FlaVPremises 60% 9 Staircases, lifts Wells and Lobbies at each Floor level Overhead and 95o/o Underqround Water Tanks 10 External plumbing and external plaster, elevation, completion of terraces with 90% waterproofi nq of the Buildinq/winq. 't1 lnstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per 25% CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environmenVCRZ NOC, Finishing to entrance lobby/s, plinth protection,paving of areas appurtenant to BuildingMing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. Table B - Common Areas (!nternal and External Development Works) in respect of Registered Phase / Project Number) Sr.No Common areas and facilities Proposed Percentage of Actual Details (Yes / No) Work Done (As on date of the Certificate) (1) (2t (3) (4) (s) 1 lnternal Roads & Footpaths No NA 2 Water Supply Yes 30o/o Work under orooress 3 Sewerage (Chamber, Lines, Septic Tank , STP) Yes 75% Work under proqress 4 Storm Water Drains Yes 7 50h Work under proqress 5 Landscaping & Tree Planting Yes 10o/o Work under orooress 6 Street Lighting No NA 7 Community Buildings No NA 8 Treatment And Disposal Of Sewage And Sullage Water No NA 9 Solid Waste Management And Disposal Yes 7 5o/o Work under proqress 10 Water conservation /Rain water harvesting Yes 75% Work under Drooress 11 Energy managemcnt No NA 12 Fire protection and fire safety requirements Yes 50o/o Work under proqress 13 Electrical meter room, sub-station, receiving station Yes 10o/o Work under orooress 14 area of No NA 15 Open Parking Yes WORK TO BE INITIATED Yours Faithfully RASIK PRABHUDA ffiio',;1 ,,t,, S HINGOO RASIK P HINGOO AND ASSOCIATES Signature & Name (lN BLOCK LEITERS) of L.S/ Architect ( License No: Ctu84l8385) Page 3 of 4 F Date of Certificate: Agreed and accepted by: Mumbai Signature of Promoter Name: PRANAV CONSTRUCTIONS LIMITED Date: MASNK P HING@@ ASS@GIATtrS t& compliance@hir€ooarchitects.com 1] .tg1-983032577, 1 +9r-?'2-28728f*d $ wuru.hingooarrhittcts,csm 0 tO6, Pagrav Eullding, Swaml Mvekananda Road, Next to Patkar Colle6e, Goregaon West. Mumbal '{OO104 Page 4 of 4