HINGOO Rasik P Hingoo Kinjal R Hingoo Samir R Hingoo Nirav R Hingoo EATdI fArch illA.dt (USA, MJ Cwll (USA) ARCHITECTS 50+ Years ol Architecturql Excellence Annexure A FORM I [see Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) R/1901/ 2026/Rera12 19.01.2026 To, PRANAV CONSTRUCTIONS LIMITED MUMBAI SUBURBAN, MAHARASHTRA, 4OOI04 Subject : Certificate of percentage of Work of completion of construction work of REDEVELOPMENT OF SHINING STAR CHSL having MahaRERA Registration Number P51800053810 (Only Applicable after project Registartion) being developed by PRANAV CONSTRUCTIONS LIMITED Sir, l/We RASIK P HINGOO AND ASSOCIATES have undertaken assignment as Architect /Licensed Surveyor of certifying Percentage of completion of Construction Work of REDEVELOPMENT OF SHINING STAR CHSL having MahaRERA Registration Number P51800053810 (Only Applicable after proiect Registration, being developed by PRANAV CONSTRUCTTONS LrMrrED ) Based on Site lnspection,with respect to Layout / each of the BuildingMing of the aforesaid Real Estate Project I certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Table A LayouUBuilding/Wing Number: SHINING STAR CHSL- WNG A/NA Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date of the Certificate) (1) lzt (3) 1 Excavation 100% 2 Basements (if any) 0.00 3 Podiums (if any) 0.00 4 Plinth, 1000/0 5 Stilt Floor 90% 6 Slabs of Super Structure 100% 7 lnternal walls, lnternal plaster, Floorings, Floors and windows within 70% Flats/Premises B Sanitary Fitting within the FlayPremises 300/o Page '1 of4 Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date of the Certificate) 9 Staircases, lifts Wells and Lobbies at each Floor level Overhead and 90% Underqround Water Tanks '10 External plumbing and external plaster, elevation, completion of terraces with 30./" wate rDroofinq of the Buildinqtuinq. 11 lnstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per 0.00 CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environmenucRZ NOC, Finishing to entrance lobby/s, plinth protection,paving of areas appurtenant to BuildingA/Mng, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Anv other activities. LayouuBuilding/Wing Number: SHINING STAR CHSL- wlNG B/NA Sr. No. Tasks/Activity Percentage of Actual Work Done (As or date of the Certificate) (1) l2l (3) I Excavation 100./" 2 Basements (if any) 0.00 3 Podiums (if any) 0.00 4 Plinth 10O'/o 5 Stilt FIoor 90% 6 Slabs of Super Structure 100% 7 lnternal walls, lnternal plaster, Floorings, Floors and windows within 700/o FlatYPremises 8 Sanitary Fitting within the FlavPremises 30% Staircases, lifts Wells and Lobbies at each Floor level Overhead and 9Oo/o Underqround Water Tanks 10 External plumbing and external plaster, elevation, completion of terraces with 3Oo/o waterproofinq of the Building^/vinq 11 lnstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per 0.00 CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environmenucRZ NOC, Finishing to entrance lobby/s, plinth prolection,paving of areas appurtenant to Buildingn/Ving, Compound Wall and all other requirements as may fu required to comalete ,roject as per specifications in agreement oI Sale. Any other activities LayouUBuilding/Wing Number: SHINING STAR CHSL WNG C/NA Sr. No Tasks/Activity Percentage of Actual Work Done (As on date of the Certificate) (1) (21 (3) 1 Excavation 1000/0 2 Basements (if any) 0.00 3 Podiums (if any) 0.00 4 Plinth 100./" 5 Stilt Floor 100./. 6 Slabs of Super Structure 100% 7 lnternal walls, lnternal plaster, Floorings, Floors and windows within 850k Flats/Premises 8 Sanita Fitti within the FlavPremises 40'/o I Staircases, lifts Wells and Lobbies at each Floor level Overhead and 90% Underqround Water Tanks '10 Exte rnal plum bing and external plaster, elevation, completion of terraces with 80% wate roofi of th e Buildin tn 11 lnstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per 1O'/o CFO NOC, Electrical fiftingb, m;chanical equipment, compliance to conditions of environmenUCRZ NOC, Finishing to entrance lobby/s, plinth protection,paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may 6e required to complete project as per specifications in agreement of Sale. Any other activities LayouUBuildingMing Number: SHINING STAR CHSL- WING D/NA Sr. No. Tasks/Activity Percentage of Actual work Done (As on date of tire Certificale) (1) (2t (3) Page 2 ol4 Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date of the Certificate) 1 Excavation '1000k 2 Basements (if any) 0.00 3 Podiums (if any) 0.00 4 Plinth, 1000/0 Stilt Floor 90% 6 Slabs of Super Structure lOOo/o 7 lnternal walls, lnternal plaster, Floorings, Floors and windows within 85V" Flats/Premises Sanitary Fitting within the FlaUPremises 40yo I Staircases, lifts Wells and Lobbies at each Floor level Overhead and 90% Underqround Water Tanks 10 External plumbing and external plaster, elevation, completion of terraces with 80./" waterproofinq of th e BuildingArving 11 lnstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per 1O1o CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC, Finishing to entrance lobby/s, plinth protection,paving of areas appurtenant to BuildingM,/ing, Compound Wall and all other requirements as may be required to complete projecl as per specifications in agreement of Sale. Any other activities. Page 3 of4 Table B - Common Areas (lnternal and External Development Works) in respect of Registered Phase / Project Number) Sr.No Common areas and facilities Proposed Percentage of Actual Details (Yes / No) Work Done (As on date of the Certificate) (t ) (21 (3) (4) (5) 1 lnternal Roads & Footpaths No 0.00 NA 2 Water Supply Yes 000 WORK TO BE INITIATED 3 Sewerage (Chamber, Lines, Septic Tank , STP) Yes 30./. WORK under proqress 4 Storm Water Drains Yes 0.00 WORK TO BE INITIATED 5 Landscaping & Tree Planting Yes 0.00 WORK TO BE INITIATED Street Liqhtinq No 0.00 NA 7 Community Buildinqs No 0.00 NA 8 Treatrnent And Disposal Of Sewaqe And Sullaqe Water No 0.00 NA Solid Waste Management And Disposal Yes 400/o WORK under prooress '10 Water conservation /Rain water harvesting Yes 40% WORK under progress 1',1 Enerqv manaqemcnt No 0.00 NA 12 Fire protection and fire safety requirements Yes 0.00 WORK TO BE INITIATED 13 Electrical meter room, sub-station, receiving station Yes 10% WORK under proqress 14 Aggregate area of recreational Open Space No 0.00 NA '15 Open Parking Yes 0.00 WORK TO BE INITIATED Yours Faithfully RASIK E3_ PRABHUDA Err;- sHtNGOo ffi RASIK P HINGOO AND ASSOCIATES Signatu a (tN BLOCK LETTERS) of L.S/ Architect ( Licen 385) Date of Agreed by: MufiDal g9)^ Sign of Promoter Name: PRANAV CONSTRUCTIONS LIMITED Date: RASIK P HINgG@@ ASS@GIATTtrS ARCHITECTURT I URBAN DESIGN I INTERIOR DESIGN I CONSTRUCTION MANAGEMENT v compliaoce@hintooarchitects.com la +91-993032577 5 | +91-22-2A724604 S www.hingooarchitects.com 9 106, Pagra, Building. swami vivekanaida Road, Next to Patkar college, Goregaon west, Mumbai - 40o1o4 Page 4 of4