D{[N@@@ RASIK P HIIIGOO KINJAL R HINGOO SAITIR R HINGOO B. ARCH. B. ARCH M. ARClr. (U. S A-l ( FORM 1 [see Regulation 3] ARCHITECT'S CERTIFICATE R/190L/2025/Rera9 04.04.2025 To, Pranav Constructions Limited (Formerly known as Pranav Constructions Private Limited) 1001, 10rh Floor, DLH Park, S. V. Road Near MTNL, Goregaon West Mumbai - 400062 Subiect Certificate of Percentage of Completion of Construction Work of " Redevelopment of Shining Star CHSL" having MAHARERA Registration Number P51800053810 being developed by Pranav Constructions Limited. Sir, I/ We M/s. Rasik P. Hingoo Associates have undertaken assignment as Architect /Licensed Surveyor of certifying Percentage of Completion of Construction Work of 'Redevelopment of Shining Star CHSL' having MAHARERA Registration Number P51800053810 Pranav Constructions Limited. Based on Site Inspectiorl with respect to Layout / each of the Building/Wing of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project under MAHARERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. 2. Table A Building /Wng 'A' (to be prepared separately for each Building/Wing of the Project) Sr. No Tasks /Activity Percentage of work done 1 Excavation 1,00% , Nil number of Basement(s) and 1 no. of Plinth and pit 100% parking J. Nil number of Podiums NA 4. StiIt Floor 80% 5. 09 number of Slabs of Super Structure 85% 6. Intemal walls, Internal Plaster, Floorings 40% within Flats/Premises, Doors and Windows to each of the Flat/Premises 7 Sanitary Fiftings within the Flat/Premises, 1.57o Elechical Fiftings within the Flat/Premises 8 Staircases, Lifts Wells and Lobbies at each Floor 90% level corurecting Staircases and Lifts, Overhead and Underground Water Tanks 9 The extemal plumbing and external plaster, 0% elevation, completion of terraces with waterproofing of the Building/Wing, 10. lnstallation of lifts, r,r,ater pumps, Fire Fighting 0% Fiftings and Equipment as per CFO NOC, Electrical Fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment/CRz NOC, Finishing to entrance lobby / s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate -t -'1.- Table A Building /Wng 'B' (to be prepared separately for each Building/Wing of the Project) Sr. No Tasks/Activity Percentage of work done 1. Excavation 100% 2. Nil number of Basement(s) and 1 no. of Plinth and pit 100% parking 3. Nil number of Podiums NA 4 Stilt Floor 80% 5 09 number of Slabs of Super Structure 85'/" 6 Intemal walls, Intemal Plaster, Floorings 40% within Flats/Premises, Doors and Windows to each of the Flat/Premises 7. Sanitary Fittings within the Flat/Premises, "t5% Electrical Fittings within the Flat/Premises 8 Staircases, Lifts Wells and Lobbies at each Floor 907o level connecting Staircases and Lifts, Overhead and Underground Water Tanks 9 The external plumbing and extemal plaster, 0% elevation, completion of terraces with waterproofing of the Building/Wing, 10. Installation of lifts, water pumps, Ftue Fighting 0% Fittings and Equipment as per CFO NOC, Electrical Fiftings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment/CRz NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Buildingr/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate ,4 -:4:- Table A Building /Wing 'C' (to be prepared separately for each Building/Wing of the Project) Sr. No Tasks /Activity Percentage of work done 1. Excavation 7007. 2 Nil number of Basement(s) and 1 no. of Plinth and pit 100% parking .-) Nil number of Podiums NA 4 Stilt Floor 1.00% 5 09 number of Slabs of Super Structure 85% 6 Intemal walls, Internal Plaster, Floorings 40% within Flats/Premises, Doors and Windows to each of the Flat/Premises 7 Sanitary Fittings within the Flat/Premises, 7sy, Electrical Fittings within the Flat/Premises 8 Staircases, Lifts Wells and Lobbies at each Floor 90% level connecting Staircases and Lifts, Overhead and Underground Water Tanks 9 The external plumbing and extemal plaster, 0% elevatior! completion of terraces with waterproofing of the Building/ Wing, 10. Installation of lifts, water pumps, Fire Fighting 07, Fiftings and Equipment as per CFO NOC, Electrical Fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment/CRz NOC, Finishing to entrance lobby/s, plinth protectio& paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate .5 Table A Building /Wing 'D' (to be prepared separately for each Building/Wing of the Project) Sr. No Tasks /Activity Percentage of work done '1,. Excavation 700% 2 Nil number of Basement(s) and 1 no. of Plinth and pit 100% parking 3. Nil number of Podiums NA 4. St'rlt Floor 80% 5. 09 nurnber of Slabs of Super Structure 85% 6. Intemal walls, Internal Plaster, Floorings 40% within Flats/Premises, Doors and Windows to each of the Flat/Premises 7 Sanitary Fittings within the Flat/Premises, 1,5% Electrical Fittings within the Flat/Premises 8 Staircases, Lifts Wells and Lobbies at each Floor 90% level connecting Staircases and Lifts, Overhead and Underground Water Tanks 9 The extemal plumbing and extemal plaster, 0% elevation, completion of terraces with waterproofing of the Building/ Wing, 10. Installation of lifts. water pumps, Fire Fighring 0% Fittings and Equipment as per CFO NOC, Electrical to Common Areas, electro, mechanical t, Compliance to conditions of t/CRZ NOC, Finishing to entrance s, plinth protection, paving of areas t to Building/Wing, Compound Wall b all other requirements as may be required to Obtain Occupation /Completion Certificate 6 -t(r:- TABLE.B Internal & External Development Works in Respect of the entire Registered Phase lwing A, B, C & D) Sr. Common areas and Facilities, Amenities Proposed Percentage Details No. (Yes/ of Work No) done 1 Intemal Roads & Footpaths No NA 2 Water Supply Yes 0% 3 Sewarage (chamber, lines, Septic Tank, Yes 0% srP) 4 Storm Water Drains Yes 0% 5 l,andscaping & Tree Planting Yes 07o 6 Street Lighting No NA 7 Community Buildings No NA 8 Treatment and disposal of sewage and No NA sullage water () Solid Waste management & Disposal Yes 0% 10 Water conservation, Rain water harvesting Yes 0% l1 Energy Management No NA 12 Fire protection and fire safety requirements Yes 0% 13 Elechical meter room, sub-station, receiving Yes 0% station 1.4 Others (Option to Add more) 15 Aggregate Area of Recreational open Space Yes 07o Yours faithfullv, Rasik *;31* PrabhudaISIIF sHinsoo RASIK P. HINGOO=ffi cN84/838s For PRANAV CON "ill-e-- Pranav Managing ABID< P D{OhJ@@ O ASB@GIATES ARCHIT€CTUR€ URBAN D€sIGN INT€RIOR O€5IGN MANAG€M€NT CONSTRUCTION OFFICE: 106. PAGRAV FIRST FLOOR, NEXT TO PATKAR COLLEGE. S.V ROAD. GOREGAON (W). MUMBAI - 400104. IEL.:9'l-22-2A724il4,28726184, TELEFAX 9'l -22.28765629. EMAIL: hi^gooarchilects@yahoo.c!m, WEBSITE: www.hingooarctrilects.corn