I D{[NG@@ RASIK P HINGOO KINJAL R HINGOO SAMIR R HINGOO NIRAV R HINGOO B.ARCH, B.ARCH M.ARCH. (U. S.A.) M. S.CrVrL (U. S. A.) FORM 1 [see Regulation 3] ARCHITECT'S CERTIFICATE R/1901/2024/Rera2 30.01.2024 To Pranav Constructions Private Limited 1001, 10th Floor, DLH Park, S. V. Road Near MTNL, Coregaon West Mumbai - 400052 Sir, Subject: Certificate of Percentage of Completion of Construction Work of " Redevelopment of Shining Star CHSL" having MAHARERA Registration Number P5180005381,0 being developed by (Pranav Constructions Private Limited). Sir, l/ We M/s. Rasik P. Hingoo Associates have undertaken assignment as Architect /Licensed Surveyor of certifying Percentage of Completion of Construction Work of 'Redevelopment of Shining Star CHSL' having MAHARERA Re g i strati on N umber P5 1 8 0 0 0 5 3 8 1 0 Pranav Constructions Private Limited. Based on Site Inspection, with respect to Layout / each of the Building/Wing of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project under MAHARERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. .2. Table A Building /Wing 'A' (to be prepared separately for each Building/Wing of the Project) Sr. No Tasks/Activity Percentage of work done 1,. Excavation 50% 2. Nil number of Basement(s) and 1 no. of Plinth and pit 0% parking 3. Nil number of Podiums NA 4. Stilt Floor 0% 5. 09 number of Slabs of Super Structure 0% 6. Internal walls, Internal Plaster, Floorings 0% within Flats/Premises, Doors and Windows to each of the Flat/Premises 7. Sanitary Fittings within the Flat/Premises, 0% Electrical Fittings within the Flat/Premises 8. Staircases, Lifts Wells and Lobbies at each Floor 0% level connecting Staircases and Lifts, Overhead and Underground Water Tanks 9. The external plumbing and external plaster, 0Yo elevation, completion of terraces with waterproofing of the Building/ Wing, 10. Installation of lifts, water pumps, Fire Fighting 0% Fittings and Equipment as per CFO NOC, Electrical Fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment/CRZ NOC, Finishing to entrance lobby /s, plinth protection, paving of areas appurtenant to Building/\Ning, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate ..3.. -:3i Table A Building /Wing 'B' (to be prepared separately for each Building/Wing of the Project) Sr. No Tasks/Activity Percentage of work done 1. Excavation 50% 2. Nil number of Basement(s) and 1 no. of Plinth and pit 0% parking 3. Nil number of Podiums NA 4. Stilt Floor 0% 5. 09 number of Slabs of Super Structure 0Yo 6. Internal walls, Internal Plaster, Floorings 0Yo within Flats/Premises, Doors and Windows to each of the Flat/Premises 7, Sanitary Fittings within the Flat/Premises, 0% Electrical Fittings within the Flat/Premises 8. Staircases, Lifts Wells and Lobbies at each Floor 0% level connecting Staircases and Lifts, Overhead and Underground Water Tanks 9. The external plumbing and external plaster, 0% elevation, completion of terraces with waterproofing of the Building/ W ing, 10. Installation of lifts, water pumps/ Fire Fighting 0% Fittings and Equipment as per CFO NOC, Electrical Fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment/CRZ NOC, Finishing to entrance lobby / s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate ..4.. -:4:- Table A Building /W^g 'C' (to be prepared separately for each Building/Wing of the Project) Sr. No Tasks/Activity Percentage of work done 1. Excavation 0% 2. Nil number of Basement(s) and L no. of Plinth and pit 0Yo parking J. Nil number of Podiums NA 4. Stilt Floor 0% 5. 09 number of Slabs of Super Structure 0% 6. Internal walls, Internal Plaster, Floorings 0% within Flats/Premises, Doors and Windows to each of the Flat/Premises 7. Sanitary Fittings within the Flat/Premises, 0% Electrical Fittings within the Flat/Premises 8. Staircases, Lifts Wells and Lobbies at each Floor 0% level connecting Staircases and Lifts, Overhead and Underground Water Tanks 9. The external plumbing and external plaster, 0% elevation, completion of terraces with waterproofing of the Buildin g/ Wing, 10. Installation of lifts, water pumps/ Fire Fighting 0% Fittings and Equipment as per CFO NOC, Electrical Fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment/CRZ NOC, Finishing to entrance lobby /s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate .5. Table A Building /Wing 'D' (to be prepared separately for each Building/Wing of the Project) Sr. No Tasks/Activity Percentage of work done 1.. Excavation 50% 2. Nil number of Basement(s) and 1no. of Plinth and pit 0% parking Nil number of Podiums NA 4. Stilt Floor 0% 5. 09 number of Slabs of Super Structure 0% 6. Internal walls, Internal Plaster, Floorings 0% within Flats/Premises, Doors and Windows to each of the Flat/Premises 7 Sanitary Fittings within the Flat/Premises, 0% Electrical Fittings within the Flat/Premises 8. Staircases, Lifts Wells and Lobbies at each Floor 0% level connecting Staircases and Lifts, Overhead and Underground Water Tanks 9. The external plumbing and external plaster, 0% elevation, completion of terraces with waterproofing of the Buildin g/ \Ning, 10. Installation of lifts, water pumps/ Fire Fighting 0% Fittings and Equipment as per CFO NOC, Electrical Fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment/CRZ NOC, Finishing to entrance lobby /s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate ..6.. -:6:- TABLE-B Internal & External Development Works in Respect of the entire Registered Phase OVing Av B, C & D) Sr. Common areas and Facilities, Amenities Proposed Percentage Details No. (Yes/ of Work No) done 1 Internal Roads & Footpaths No NA 2 Water Supply Yes 0% Sewarage (chamber, lines, Septic Tank, Yes 0% srP) 4 Storm Water Drains Yes 0% 5 Landscaping & Tree Planting Yes 0% 6 Street Lighting No NA 7 Community Buildings No NA 8 Treatment and disposal of sewage and No NA sullage water 9 Solid Waste management & Disposal Yes 10 Water conservation, Rain water harvesting Yes 0% 11 Energy Management No NA 12 Fire protection and fire safety requirements Yes 0% 13 Electrical meter room, sub-station, receiving Yes 0% station 1.4 Others (Option to Add more) 15 Aggregate Area of Recreational open Space Yours faithfully, Rasik ::.-..,:.:'': .:::. "'. Prabhudas :l.r,''. ,,;,,,,::r Hingoo -",r'rr:1:"'" " '' RASIK P. HINGOO cN84/838s d For PRANAV CONSTRU t-g.s-t- / RASID< P D{[N@@@ ASS ARCHIT€CTUR€ URBAN D€sIGN INT€RIOR D€sIGN O GIATES CONSTRUCTION MANAG€M€NT OFFICE: 106, PAGRAV. FIRST FLOOR. NEXT TO PATKAR COLLEGE. S.V. ROAD, GOREGAON (W). lrUMBAl - 400104. fEL..91-22-28724604,28726184. TELEFAX: 91-22-28765629. EMAIL: hingooarchitects@yahoo.com, WEBSITE: www.hingooarchitects.com