VISHALNIKAM BlL1:O, AnandNagar,Kalwa- East,Thane JaiGaneshBhavan, FORM-2[see Regulation3] ENGINEER'SCERTIFICATE Date:31'tDecember 2023 To, K AjmeraDevelopers 76,KikaStreet,Gulalwadi Mumbai-400004 Subject:Certificate of CostIncurred for Development of " NawogApartmentCHSL" for Construction of OneNo.of Buildingof the of the Project"Ananta"situatedon the PlotbearingCTSNos. 55tl5t of villageNahur, situatedat Vishwakarma Marg.,Mulund- West,Mumbaibeing developed by K AimeraDevelopers Ref:MahaRERARegistration NumberP518@053780 Sir, I Mr. VishalNikamhaveundertaken assignment of certifiTing Estimated Costfor the SubjectReal EstateProjectproposed to be registered underMahaRERA, beingof OneNo.of Buildingof the one Phaseof the Projectsituatedon the Plot bearingCTSNos.551/51of villageNahur, situatedat Vishwakarma Marg.,Mulund- West,Mumbaibeingdeveloped by K AimeraDevelopers 1. Following professionals technical - areappointedby Owner/ Promoter: {i) Miss.TanviDedhiaasArchitect (ii)MR.RUPESH CHAUDHARI Structural Consultant (iii)MR.VISHAINIKAMasQuantitySurveyor 2. We haveestimatedthe cost of the completionto obtainOccupation Certificate/Completion Certificate, of the Civil,MEPandAlliedworks,of the Building of the project.Ourestimated cost VISHALNIKAM AnandNagar,Kalwa- East,Thane BlLl:O,JaiGaneshBhavan, Calculationsarebasedon the Drawings/plans madeavailableto usfor the projectunderreferenceby the Developerand Consultants and the Scheduleof items and quantityfor the entire work as calculatedby Mr. VISHALNIKAMquantitySurveyor*appointedby Developer/Engineer, and the assumption of thecostof material, labourandotherinputsmadebydeveloper, andthesiteinspection carriedout by us. 3. We estimateTotalEstimated Costof completion of the building(s) projectunder of the aforesaid referenceas Rs.25,78,OO,OO0/- Totalof TableA and B).The estimatedTotalCostof projectis with referenceto the Civil,MEPandalliedworksrequiredto be completed for the purposeof obtaining occupationcertificate / completion for the building(s) certificate from the MCGMbeingthe Planning Authorityunderwhose jurisdiction the aforesaidprojectis beingimplemented. 4. TheCostIncurred till dateiscalculated (Totalof TableA andB).Theamountof at Rs.1,03,12,0001- Estimated CostIncurrediscalculated on the baseof amountof TotalEstimatedCost. 5. The Balance costof Completionof the Civil,MEPandAlliedworksof the Building of the subject projecto obtainOccupationCertificate / Completion from MCGM(planning Certificate Authority)is estimated (Total at Rs.25,74,88,000/- of TableA andB). 6. I certifythatthe Costof the Civil,MEPandalliedworkfor the aforesaid Projectascompleted on the dateof thiscertificateis asgivenin TableA andB below: TABTEA Sr.No Particulars Amountsason 31December2O23 1. TotalEstimated costof the building Rs.25,78,00,0AO/- ason dateof Registration is 2. Costincurred Rs. t,O3,t2,OOO/- (basedon the Estimated cost) 3. Workdonein Percentage 4% (asPercentage of the estimated cost) 4. BalanceCosto be Incurred Rs.25,74,88,OOO1- (Basedon EstimatedCost) 5. CostIncurredon Additional /Extraltemsnot included in the EstimatedCost(Annexure A) VISHALNIKAM B{LI.O,JaiGaneshBhavan,AnandNagar,Kalwa- East, Thane TABLEB (to be preparedfor the entire registeredphaseof the RealEstateProject) Sr.No Particulars Amounts L, TotalEstimatedcostof the Internaland External Development Worksincludingamenitiesand Facilities in the layoutdateof Registration is 2. Costincurred(based on the Estimated cost) 3. Work done in Percentage(as Percentageof the estimatedcost) 4. BalanceCostto be Incurred(Basedon EstimatedCost) 5. CostIncurredon Additional/Extraltemsthe Estimated Cost(Annexure A) YoursFaithfully, B. E. Civil (LicenseNo: 840008616) Kirti Rasiklal Ajmera Digitally signed by Kirti Rasiklal Ajmera Date: 2024.01.18 20:31:33 +05'30' Signatureof Promoter * Note 1. The scopeof work is to completeentireRealEstateProjectas per drawingsapprovedfrom time to time so as to obtainOccupationCertificate /CompletionCertificate. 2. (*) Quantitysurveycan be done by officeof Engineeror can be done by an independentQuantity Surveyor,whose certificateof quantitycalculatedcan be relied upon by the Engineer.In caseof independentquantitysurveyorbeingappointedby Developer, the name hasto be mentionedat the placemarked(*) and in casequantityare beingcalculatedby office of Engineer, the name of the Personin the officeof Engineer, who is responsiblefor the quantitycalculated shouldbe mentioned at the placemarked(*). VISHALNIKAM AnandNagar,Kalwa- East,Thane BltLO,JaiGaneshBhavan, 3. Theestimatedcostincludes all labour,material,equipmentand machinery requiredto carryout entirework. 4. Asthis is an estimatedcost,anydeviationin quantityrequiredfor development of the Realestate Projectwill resultin amendment of the costincurred/tobe incurred. 5. All components of workwith specifications areindicative andnot exhaustive. Annexure A Listof Extra/ Additional ltemsexecutedwith Cost (whichwerenot partof the originalEstimate of TotalCost)