Annexure A FORM 1 [See Regulation 3] ARCHITECT'S CERTIFICATE Mahavir Millennium LLP, Site Add: Plot No. 190 & 191, CTS Nos. 1108 & 1109 Village Chembur RC Marg, Chembur East, Mumbai 400071 Date: - 11.10.2025 Subject: Certificate of Percentage of Completion of Construction Work of project “Arham Mourya”, 1 No. of Building / 2 Wings [Maha RERA Registration Number- P51800053514] situated on the plot no 190 and 191 bearing CTS No 1108 and 1109 of village Chembur, R..C. Marg, Chembur, Mumbai- 400071 admeasuring 2720.00 sq. mts. area being developed by Mahavir Millennium LLP. Sir, We, M/s B.H. WADHWA & CHHADVA, have undertaken assignment as Architects for certifying Percentage of Completion of Construction Work of the “Arham Mourya” having Maha RERA Registration Number- P51800053514 Project is situated on the plot no 190 and 191 bearing CTS No 1108 and 1109 of village Chembur, R.C. Marg, Chembur, Mumbai- 400071 admeasuring 2720.00 sq. mts. Being developed by Mahavir Millennium LLP. Based on Site Inspection, with respect to each of the Building/Wing of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of Work done for each of the Building/Wing of the Real Estate Project under Maha RERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. 1 Table A 1 No of Building /2 Wings (to be prepared separately for each Layout/ Building/Wing of the Project) WING “A” Sr. No. Task/Activity Percentage of work done up to 30.09.2025 (1) (2) (3) 1 Excavation 100% 2 2 number of Basement 100% 3 Plinth 100% 4 Ground 90% 5 0 number of Podiums (within building footprint) 00% 6 15 Slabs of Super Structure 53 % 7 Internal Walls, Internal Plaster, Floorings, Doors and 30% Windows within Flat/Premises 8 Plumbing Fittings within the Flat/Premises 00% 9 Staircase, Lift Wells and Lobbies at each floor level, 00% Overhead and Underground Water Tanks 10 External plumbing and external plaster, elevation, 00% completion of terraces with waterproofing of the Building/Wing 11 Installation of lifts, Water Pumps, Fire Fighting Fittings and 50% Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/ Wing, Compound Wall and all other requirements as may be required to complete the Project as per specifications in Agreement for Sale. Any other activities. 2 Table A 1 No of Building /2 Wings (to be prepared separately for each Layout/ Building/Wing of the Project) WING “B” Sr. No. Task/Activity Percentage of work done up to 30.09.2025 (1) (2) (3) 1 Excavation 100% 2 2 number of Basement 100% 3 Plinth 100% 4 Ground 95% 5 0 number of Podiums (within building footprint) 00% 6 16 Slabs of Super Structure 100% 7 Internal Walls, Internal Plaster, Floorings, Doors and 95% Windows within Flat/Premises 8 Plumbing Fittings within the Flat/Premises 95% 9 Staircase, Lift Wells and Lobbies at each floor level, 95% Overhead and Underground Water Tanks 10 External plumbing and external plaster, elevation, 95% completion of terraces with waterproofing of the Building/Wing 11 Installation of lifts, Water Pumps, Fire Fighting Fittings and 95% Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/ Wing, Compound Wall and all other requirements as may be required to complete the Project as per specifications in Agreement for Sale. Any other activities. 3 TABLE-B Common Areas (Internal & External Development Works) in respect of the Registered Phase / Project Number Sr. Common areas and Proposed Percentage of Work Details No. Facilities (Yes/No) done (30.09.2025) (1) (2) (3) (4) (5) 1. Internal Roads &Footpaths No N.A. 2. (2) Water Supply Yes 00% 3. Sewerage (Chambers, Yes 00% Drainage Lines) 4. Storm Water Drains Yes 50% 5. Landscaping & Tree Yes 00% Planting 6. Street Lighting No N.A. 7. Community Buildings No N.A. 8. Treatment & Disposal of No N.A. Sewage and Sullage water 9. Solid Waste Management & No N.A. Disposal 10. Water Conservation, Rain Yes 00% Water Harvesting 11. Energy Management No 00% 12. Fire Protection and Fire Safety Yes 40% requirements 13. Electrical Meter Room, Yes 50% Sub-station 14. Others (Option to Add more) No N.A. Yours faithfully, For M/S. B.H.Wadhwa & Chhadva Associates Bansi Hassanand Digitally signed by Bansi Hassanand Wadhwa DN: c=IN, o=Personal, title=6177, pseudonym=B3EC814F327AD3226C1494EEAE8FF4E2E0F372EC, 2.5.4.20=804f8d5e1965d7ff48b673fd22768489304c75e0f3d58116d80 Wadhwa 7f9876c17f0d7, postalCode=400071, st=Maharashtra, serialNumber=7E7B5338A7D525392CD645C55FA61CBFD1DE89C6A0 04198DDF7B8E14D026CB44, cn=Bansi Hassanand Wadhwa Date: 2025.10.11 11:35:01 +05'30' B.H.Wadhwa (License No: CA/82/7288) Agreed and Accepted by Kiran Mulji Shah Digitally signed by Kiran Mulji Shah DN: c=IN, o=Personal, title=2272, pseudonym=1335281520519935245oP5C5c4yI152z, 2.5.4.20=301777be33d01382380cff37c0a362b536a4ababe97de3b120e2b797afef8d1e, postalCode=400088, st=Maharashtra, serialNumber=b7bda66795cc067c71886ce251af7b7f55a5a083f7bd559bcfe4cc131e8b5b2e, cn=Kiran Mulji Shah Date: 2026.01.17 17:05:03 +05'30' Signature of the Promoter 4 Name: Mr. Kiran Shah (For Mahavir Millennium LLP)