Annexure A FORM 1 [see Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) Date: To, HEMERA BUILDERS AND DEVELOPERS PVT LTD THANE, MAHARASHTRA, 421501 Subject : Certificate of percentage of Work of completion of construction work of GEMINI ICON having MahaRERA Registration Number P51800053513 (Only Applicable after project Registartion) being developed by HEMERA BUILDERS AND DEVELOPERS PVT LTD Sir, I/We VINAYAK SAHASRABUDHE have undertaken assignment as Architect /Licensed Surveyor of certifying Percentage of completion of Construction Work of GEMINI ICON having MahaRERA Registration Number P51800053513 (Only Applicable after project Registration, being developed by HEMERA BUILDERS AND DEVELOPERS PVT LTD ) Based on Site Inspection,with respect to Layout / each of the Building/Wing of the aforesaid Real Estate Project I certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Table A Layout/Building/Wing Number: GEMINI ICON/NA Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date of the Certificate) (1) (2) (3) 1 Excavation 100.00 2 Basements (if any) 0.00 3 Podiums (if any) 0.00 4 Plinth, 100.00 5 Stilt Floor 0.00 6 Slabs of Super Structure 70.00 7 Internal walls, Internal plaster, Floorings, Floors and windows within 0.00 Flats/Premises 8 Sanitary Fitting within the Flat/Premises 0.00 Page 1 of 3 Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date of the Certificate) 9 Staircases, lifts Wells and Lobbies at each Floor level Overhead and 70.00 Underground Water Tanks 10 External plumbing and external plaster, elevation, completion of terraces with 0.00 waterproofing of the Building/wing. 11 Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per 0.00 CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC, Finishing to entrance lobby/s, plinth protection,paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. Page 2 of 3 Table B - Common Areas (Internal and External Development Works) in respect of Registered Phase / Project Number) Sr.No Common areas and facilities Is Available Percentage of Actual Details (Yes / No) Work Done (As on date of the Certificate) (1) (2) (3) (4) (5) 1 Internal Roads & Footpaths Yes 0.00 YET TO START 2 Water Supply Yes 0.00 YET TO START 3 Sewerage (Chamber, Lines, Septic Tank , STP) Yes 0.00 YET TO START 4 Storm Water Drains Yes 0.00 YET TO START 5 Landscaping & Tree Planting Yes 0.00 YET TO START 6 Street Lighting Yes 0.00 YET TO START 7 Community Buildings No 0.00 NA 8 Treatment And Disposal Of Sewage And Sullage Water No 0.00 NA 9 Solid Waste Management And Disposal Yes 0.00 YET TO START 10 Water conservation /Rain water harvesting Yes 0.00 YET TO START 11 Energy managemcnt Yes 0.00 YET TO START 12 Fire protection and fire safety requirements Yes 0.00 YET TO START 13 Electrical meter room, sub-station, receiving station Yes 0.00 YET TO START 14 Aggregate area of recreational Open Space No 0.00 NA 15 Open Parking No 0.00 NA Yours Faithfully VINAYAK SAHASRABUDHE Signature & Name (IN BLOCK LETTERS) of L.S/ Architect ( License No: CA/92/14754) Date of Certificate: Agreed and accepted by: Signature of Promoter Name: HEMERA BUILDERS AND DEVELOPERS PVT LTD Date: Page 3 of 3