ANNEXURE A FORM 2A [See Regulation 3A.] ENGINEER’S CERTIFICATE FOR QUALITY ASSURANCE (Site Supervisor’s Certificate) (To be submitted at end of the Financial Year) Date: 14.11.2025 To, M/s. H Rishabraj Realty 103, Jai Tirth, Daulat Nagar, Road No. 10, Borivali (East), Mumbai – 400 066. Quality Assurance Certificate (Certificate No. 01 for the year ending March-2025) Subject: Certificate for quality of materials used and quality of construction and workmanship for the work of ‘Rishabraj Trident’ having MahaRERA Registration Number P51800053505 being developed by “H Rishabraj Realty.” Sir, I/We M/S Unisteps Consulting Pvt Ltd. have undertaken the assignment of supervision of this real estate project. Our Responsibility. To carry out the work in accordance with the development permission and as per the approved plan, to submit certificate of supervision of work, to carry out material testing in-situ or in an authorized laboratory as per prevailing and applicable standards, to ensure quality of work and workmanship as per prescribed specifications, and as per NBC and / or other relevant code of practice. The details of the quality are as follows: 1. Structural Design, Stability and Testing Sr. No. Parameters Yes No Remarks Whether soil investigations of the site have been conducted before the structural design and soil parameters 1 have been Yes accounted for in the structural design/ drawings? Name: Rupesh Chowdhary License Whether Structural Engineer has been appointed for the No: REG. NO. STR: 840005434 2 project? Yes Mobile: +91 9930129661 E-mail: mail@unistepscpl.com Whether the inspection registers, site order book and 3 quality control test registers are maintained at the site Yes properly and endorsed by the Engineer–in-Charge? 4 Whether testing facilities to check quality of material is It is being done at 3rd Party lab available at site? Whether the statuary provisions for disaster resistance/earthquake resistant design have been 5 incorporated, Yes specially in case of multi-storeyed construction? Has suitable cognizance been taken on demarcated flood 6 lines and appropriate precautions taken for protecting the Yes site from flooding considering local flooding issues? 2. Input Materials. Sr. No. Parameters Yes No Remarks Whether the following building materials confirm to 1 relevant IS/BS/NBC Code, or as per Industry Standards? Yes If yes, provide details: IS Code (a) Cement, concrete and coarse aggregate Yes (b) Steel and its alloys Yes (c) Electrical wire, fittings and accessories Yes (d) Plumbing and sanitary fittings Yes Whether regular tests of materials and construction Yes 2 products are being done from accredited labs also? If yes, Name of lab: Allied Research details of such labs Center Whether manufacturer test certificate for cement, steel, 3 pipes etc. have been obtained and whether supply Yes records are being maintained? Whether suitable water is being used for construction? (i) What is the source of water? (ii) Has water been tested and approved by Engineer-in- Source of Water-Borewell 4 Charge before construction? Yes (iii) Has water been tested subsequently as per requirement? 3. Quality of Workmanship. Sr. No. Parameters Yes No Remarks Whether works of all the electrical wiring/ connections/ lift installation / other electrical installations have been carried out under authorized /registered electrical Yes 1 engineer and whether records of the same has been maintained? Whether all related works of plumbing & sanitary including installation of water supply systems, drainage systems, sewage systems, sinks, toilets etc. 2 have been carried out under authorized /registered Yes plumbers / sanitary contractors and whether records of the same has been maintained? Whether all the work is being carried out under supervision of experienced and skilled professional? Further, whether the workmanship and quality is satisfactory and up to the mark and the work is within Yes 3 the acceptable and permissible limits of deviations as per relevant Code of Practice? Whether remedial measures are undertaken to prevent Damp-proof paint being applied 4 dampness and leakages? If yes, provide details Yes on dead wall Whether safety precautions are undertaken during 5 construction activities for all type of workers? Yes 4. Miscellaneous. Sr. No. Parameters Yes No Remarks Whether third party quality inspection is being carried out on site during/after completion of the works? Yes M/S Unisteps Consulting 1 If yes, provide details. Pvt Ltd. 2 Whether anti-termite treatment has been undertaken for Yes the soil? Whether fire-fighting arrangements has been undertaken Yes 3 under supervision of fire consultant? Whether proper signages have been installed on site/ 4 completed building as per requirement? Yes Whether precautions are undertaken to avoid air pollution 5 during construction? Please specify. Yes Whether records of all test reports / results have been properly kept in the prescribed formats and whether the Yes same are available at site for viewing by allottees and to 6 be handed over to the association of allottees? Whether all relevant records including sanctioned building plans, utility drawings, various test reports / results have Yes been properly kept in the prescribed formats to be handed 7 over to the association of allottees? Any innovative/ cost effective/ green technology has been Electrical & Plumbing Fitting 8 used for improving quality/energy efficiency? Please Yes specify Yours Faithfully, Digitally signed by Kailash Kailash Anwala DN: cn=Kailash Anwala, o=Unisteps Consulting, ou=Project Management, Anwala email=mail@unistepscpl.com, c=US Date: 2025.11.14 18:33:25 +05'30' Signature of Engineer Name: KAILASH ANWALA Engineer Qualification (Not less than graduate) License No. (if any): STR / A / 39 Place: Mumbai Agreed and accepted by Digitally signed HARISH by HARISH RATANCH RATANCHAND JAIN AND JAIN Date: 2025.11.18 11:14:23 +05'30' Signature of Promoter “M/s. H Rishabraj Realty” Date: 14.11.2025 ON BEHALF OF GOVERNMENT PRINTING, STATIONERY AND PUBLICATION, PRINTED AND PUBLISHED BY DIRECTOR, RUPENDRA DINESH MORE, PRINTED AT GOVERNMENT CENTRAL PRESS, 21-A, NETAJI SUBHASH ROAD, CHARNI ROAD, MUMBAI 400 004 AND PUBLISHED AT DIRECTORATE OF GOVERNMENT PRINTING, STATIONERY AND PUBLICATIONS, 21-A, NETAJI SUBHASH ROAD, CHARNI ROAD, MUMBAI 400 004. EDITOR: DIRECTOR, RUPENDRA DINESH MORE