Annexure A FORM 1 [see Regulation 3] ARCHITECT’S CERTIFICATE To, Date: 08.07.2023 Mr. Amir Amanullah Mohamed Yusuf Partner of M/s. Ary Developers, Dilkhush Bunglow, Shop No.01, J.P. Road, Next to Azad Nagar Metro station, Andheri West, Mumbai- 400 058 Subject: Certificate of Percentage of Completion of Construction Work of Umar Park for construction of building of the situated at plot bearing C.T.S. No. 171-A of demarcated by its boundaries 19° 07' 33.74" N,72° 50' 20.37" E to the North, 19° 07' 35.20" N, 72° 50' 20.76" E to the South 19° 07' 33.56" N, 72° 50' 21.33" E to the East, 19° 07' 34.86" N, 72° 50' 21.63" E to the West Village Andheri (W), F. P. No. 34 of TPS Il Andheri, J. P. Road, Andheri (W), Mumbai having MahaRERA Registration Number applied for (Only Applicable after project Registration) being developed by M/s. Ary Developers. Sir, I, Shri. Arun Gurav, have undertaken assignment as Licensed Surveyor of certifying Percentage of Completion of Construction Work of “Umar Park” having MahaRERA Registration Number applied for being developed by M/s. Ary Developers. Based on Site Inspection, with respect to Layout / each of the Building/Wing of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. TABLE-A Single building is proposed. Sr. Tasks / Activity Percentage of Actual Work Done No. (2) (As on 08.07.2023) (1) (3) 1. Excavation 0% Completed 2. Basements (if any) NA 3. Podiums (1) 0% Completed 4. Plinth 0% Completed 5. Stilt Floor 0 Slabs Completed 6. Slabs of Super Structure 0% Completed 7. Internal walls, Internal Plaster, Floorings, 0% Completed Door and windows within Flats/Premises 8. Sanitary Fittings within theFlat/Premises 0% Completed 9. Staircases, Lifts Wells and Lobbies at each 0% Completed Floor level, Overhead and Underground Water Tanks 10. External plumbing and external plaster, 0% Completed elevation, completion of terraces with waterproofing of the Building/Wing. 11. Installation of Lifts, water pumps, Fire Fighting 0% Completed Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. TABLE-B Common Areas (Internal and External Development Works) in respect of the entire Registered Phase / Project Number Sr. Common areas and Proposed Percentage of Actual Work Details No Facilities (Yes / No) Done (As on 01.07.2023) (5) (1) (2) (3) (4) 1. Internal Roads& Footpaths. No --- 2. Water Supply Yes 0% Completed 3. Sewerage (Chamber, lines, No --- Septic Tank, STP). 4. Storm Water Drains Yes 0% Completed 5. Landscaping & Tree Planting Yes 0% Completed 6. Street Lighting No --- 7. Community Buildings No --- 8. Treatment and disposal of No --- sewage and sullage water. 9. Solid Waste management Yes 0% Completed and Disposal 10. Water conservation / Rain Yes 0% Completed water harvesting 11. Energy Management No --- 12. Fire protection and Fire Safety Yes 0% Completed requirements 13. Electrical meter room, sub - No --- station, receiving station. 14. Others (Option to Add --- --- more). Yours faithfully, For Skyline Inframart Consultants LLP ARUN Digitally signed by ARUN VISHRAM VISHRAM GURAV Date: 2023.07.08 GURAV 15:52:06 +05'30' Shri. Arun Gruav (L.S. No. 840002661) Agreed and Accepted by: AMIR Digitally signed by AMANULLAH AMIR AMANULLAH MOHAMED YUSUF MOHAMED Date: 2023.07.08 YUSUF 15:52:49 +05'30' Shri. Amir Amanullah Mohamed Yusuf, Proprietor of M/s. Ary Developers,