Annexure A FORM 1 LICENSED SURVEYOR CERTIFICATE Date: - 06/04/2026 To, Avalon Residency LLP 4th floor, Techniplex – I Techniplex Complex Veer Savarkar Flyover Goregaon (West) Mumbai 400104 Subject: Certificate of percentage of Completion of Construction Work of Avalon Residency Tower 2 having MaharRera Registration Number P51800053429 being developed by Avalon Residency LLP. Sir, We, M/s Manoj Dubal & Associates, Mumbai have undertaken assignment as Licensed Surveyor of percentage of Completion of construction work of Avalon Residency Tower 2 having MahaRera Registration Number P51800053429, being developed by Avalon Residency LLP. Based on site inspection, with respect to layout / each of the building/Wing of the aforesaid real estate project. I certify that as on the date of this certificate, the percentage of work done for each of the building/Wing of the Real estate project under MahaRera is as per Table A herein Below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Lastly amended plans has been approved for building by Brihanmumbai Municipal Corporation vide no. P-12566/2022/(928 And Other)/P/S Ward/PAHADI GOREGAON-W/337/4/Amend dated 10th October 2024. Details of Work Completion is as per Building plans which is as follows: TABLE-A Within the “Avalon Residency Tower 2” Sr. Task and activity Percentage of Actual Work Done No. (As on date of the Certificate) 1 Excavation 100% 2 Basement (if any) 100% 3 Plinth 100% 4 Ground Floor (Part) + Stilt Floor (Part) 100% 5 1st to 6th Podium 100% 6 Podiums 7th Podium to 11th Podium + Service Floor 50% 7 Amenity 12th Floor 50% 8 Slab of super Structure - 13th to 22nd Floor 100% 9 Internal walls, Internal plaster, floorings, Doors and NIL windows within Flats/Premises 10 Sanitary Fittings within the Flat/Premises NIL Sr. Task and activity Percentage of Actual Work Done No. (As on date of the Certificate) 11 Staircases, Lifts Wells and Lobbies at each Floor level Completed upto 22nd Floor Overhead and underground water tanks. UGT – Construction Completed OHT - NIL 12 External plumbing and external plaster, elevation, NIL completion of terraces with waterproofing of the Building/Wing, 13 Installation of lifts, water pumps, Fire Fighting Fittings and NIL Equipment as per CFO NOC, Electrical fittings mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of sale. Any other activities. TABLE B Common areas (internal and external road development works) in respect of the registered phase / project number Sr. Common areas and Facilities Proposed Percentage of Details No. (YES/NO) Actual Work Done 1 Internal Roads & Footpaths No Not Applicable 2 Water Supply Yes NIL 3 Sewerage (Chamber, lines, Septic tank, STP) Yes NIL 4 Storm Water Drains Yes NIL 5 Landscaping & Tree Planting Yes NIL 6 Street Lighting No Not Applicable 7 Community Buildings No Not Applicable 8 Treatment and disposal of sewage and sullage water. Yes NIL 9 Solid Waste management & Disposal Yes NIL 10 Water conservation / Rain water harvesting Yes NIL 11 Energy management Yes NIL 12 Fire protection and Fire Safety Requirements Yes NIL 13 Electrical motor room, sub-station, Yes NIL receiving station. 14 Others (Option to Add more) - - Yours Faithfully, Agreed and accepted by for Manoj Dubal & Associates for Avalon Residency LLP MANOJKUMAR Digitally signed by Hussein ASHWANIKUMAR Digitally signed by MANOJKUMAR ASHWANIKUMAR DUBAL Hussein Abdul Abdul Karim Balwa DUBAL Date: 2026.04.06 16:35:06 +05'30' Karim Balwa Date: 2026.04.14 11:00:49 +05'30' Partner Hussein A K Balwa Licensed Surveyor Designated Partner License No. D/203/LS