MEHUL KANAKIA ARCHtItCTS ARCHITECTURE INTERIORS URBANDESICN Annexure A FORM I [see Regulation 3l ARCHITECT'S CERTIFICATE Quarterly Progress Reporting for quarter ending September 2024. Date:30.09.2024 To, H. Rishabraj Realty 103, Jai Tirth, Daulat Nagar, Road No. 10, Borivali (East), Mumbai - 400 066 Subject: Certificate of Percentage of Cornpletion of Construction Work of Rishabraj Aradhana having MahaRERA Registration Number P51800053420 being developed by H. Rishabraj Realty. Sir, I/ We shri. Mehul J. Kanakia har,-e undertaken assignment as Architect /Licensed Surveyor of certifying Percentage of Completion of Construction Work of Rishabraj Aradhana having MahaRERA Registration Number P51800053420 being developed by H. Rishabraj Realty. Based on Site Inspection, with respect to Layout I each of the Building/Wing of the aforesaid Real Estate Project, I certifu that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. TABLE-A Layout / Building /Wing Number_(to be prepared separately for each Layout /Building /Wing of the Project) Sr. Tasks / Activity Percentage of Actual Work Done No (2) (As on date of the Certificate) (3) (l) I Excavation 100% Completed 2. Basements (0) NA J Podiurns (0) NA 4 Plinth 100% Completed 5 Stilt Floor 100%Completed 6 No. of Slabs of Super Structurc (09) 80%Completed 7 Intemal rvalls, Internal Plaster, 40%Completed Floorings, Door and windows within Flats/Premises 8 Sanitary Fittings within the 5%Completed Flat/Premises I Staircases. Lifts Wells and Lobbies at each 30%Completed Floor level, Overhead and Underground Water Tanks ---_l J MEHUL KANAKIA AF -I ITECTS ARCHITECTURE INTERIORS URBANDTSICN r0 Extcrnal plumbing and extcrnal plaster. 0%Cornpletcd elevation, cornpletion of terraces with w'aterproofing of the Building/Wing. ll lnstallation of Lifts, water pumps, Irire 0%Completed Fighting Fittings and Equipment as per CFO NOC. Electrical fittings. mechanical cquiprncnt. compliance to conditions of environmenttCRZ NOC. finishing to entrance lobby/s, plinth protection, pavin_u of areas appurtenant to Building/Wrng. Cornpound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. TABLE-B Common Areas (Internal and External Development Works) in respect of the entire Registered Phase/Proj ect Number Sr. Percentage of Commonareas Proposed No Actual Work Done Dctails andFacilities (Yes / No) (As on date of the Certificate) (s) (2) (3) (l) (4) lntcrnal Roads & I Footpaths. NO NA NA 2 Water Supply WORK NOT YES 0% STARTED Sewerage (Chamber, WORK IN J lines. Septic YES 30% PROGRESS Tank, STP). WORK TN 1. Stonl WaterDrains YES 30% PROGRESS i Landscaping& 5 Tree Plantine NO NA NA 6. Street Lighting NO NA NA Community 7 Buildines NO NA NA Treatrnent and disposal WORK NOT ti of sewa-ee and sullage YES 0% STARTED water. Solid Waste WORK NOT 9 rnanagement& YES 0% Disposal STARTED MEHUL KANAKIA ARCHiII S ARCHITECTURE INTERIORS URBANDESICN Water conservation / WORK NOT 10. Rain water YES 0% STARTED harvesting ll Energy Management NO NA NA Fire protection WORK NOT l2 and fire safety YES 0% STARTED requirements Electrical meter WORK NOT l3 room,sub-station, YES 0% STARTED receiving station. WORK NOT 14. Open/Stack Parking YES 0% STARTED Others (Option to NA NA t4 NO Add more). Yours Faithfully, MEHUL J. KANAKIA (License No: CA/2OL4 I 622911 Agreed and accepted by: Signature of Promoter Name: H. Rishabraj RealtY Date: 30.09.2024 I 00 I . building no 5. garden grove cotnplex. J MEHUL KANAKIA ARCHITECTURF INTERIORS URBANDESICN chikuwadi. Borir nli rvest