Annexure A FORM 1 [see Regulation 3] ARCHITECT’S CERTIFICATE (To be submitted at the time of Registration of Project, Quarterly Progress Reporting and for withdrawal of Money from Designated Account) Date: 05.09.23 To, M/s. H. Rishabraj Realty 103, Jai Tirth, Daulat Nagar, Road No. 10, Borivali (East), Mumbai – 400 066. Subject: Certificate of Percentage of Completion of Construction Work of Rishabraj Aradhana having MahaRERA Registration Number applied for (Only Applicable after project Registration) being developed by M/s. H. Rishabraj Realty. Sir, I/ We Mehul J. Kanakia have undertaken assignment as Architect /Licensed Surveyor of certifying Percentage of Completion of Construction Work of Rishabraj Aradhana having MahaRERA Registration Number applied for (Only Applicable after project Registration) being developed by M/s. H. Rishabraj Realty. Based on Site Inspection, with respect to Layout / each of the Building/Wing of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project under MahaRERA is as per Table A herein below.The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. TABLE-A Layout / Building /Wing Number (to be prepared separately for each Layout /Building /Wing of the Project) Sr. Tasks / Activity Percentage of Actual Work No Done (2) ( As on date of the (1) Certificate) (3) 1. Excavation 0% Completed 2. Basements (0) 0% Completed 3. Podiums (0) 0% Completed 4. Plinth 0% Completed 5. Stilt Floor 0 Slabs Completed C/105, Krishna Nagari, Opposite Sony Mony, S.V.Road, Borivali (W) Mumbai-400092 M: +919769692009 6. Slabs of Super Structure (9) 0% Completed 7. Internal walls, Internal Plaster, 0% Completed Floorings ,Door and windows within Flats/Premises 8. Sanitary Fittings within the 0% Completed Flat/Premises 9. Staircases, Lifts Wells and Lobbies at each 0% Completed Floor level, Overhead and Underground Water Tanks 10. External plumbing and external plaster, 0% Completed elevation, completion of terraces with waterproofing of the Building/Wing. 11. Installation of Lifts, water pumps, Fire 0% Completed Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC, Finishing to entrance lobby/s,plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. TABLE-B Common Areas (Internal and External Development Works) in respect of the entire RegisteredPhase/Project Number Sr. Commonareas Proposed Percentage of Details No andFacilities (Yes / No) Actual Work Done (As on date of ( 5) (2) (3) the Certificate) (1) (4) 1. Internal Roads & NO 0% Footpaths. 2. Water Supply YES 0% 3. Sewerage (Chamber, YES 0% lines, Septic Tank, STP). 4. Storm WaterDrains YES 0% C/105, Krishna Nagari, Opposite Sony Mony, S.V.Road, Borivali (W) Mumbai-400092 M: +919769692009 5. Landscaping& NO 0% Tree Planting 6. Street Lighting NO 0% 7. Community NO 0% Buildings 8. Treatment and disposal YES 0% of sewage and sullage water. 9. Solid Waste YES 0% management& Disposal 10. Water conservation / YES 0% Rain water harvesting 11. Energy management NO 0% 12. Fire protection YES 0% and fire safety requirements 13. Electrical meter YES 0% room, sub-station, receiving station. 14. Others (Option to NO 0% Add more). Yours Faithfully, Mehul Digitally by Mehul signed Jitendra Jitendra Kanakia Date: 2023.09.05 Kanakia 16:04:27 +05'30' MEHUL J. KANAKIA (License No: CA/2014/62291) Agreed and Accepted by: HARISH Digitally HARISH signed by RATANCH RATANCHAND JAIN Date: 2023.09.06 AND JAIN 17:05:54 +05'30' Signature of Promoter Name: M/s. H. Rishabraj Realty Date: ____________ C/105, Krishna Nagari, Opposite Sony Mony, S.V.Road, Borivali (W) Mumbai-400092 M: +919769692009