ARCHITECTURE | INTERIORS | LIASONING CONSULTANT Mo: 7057421548, 9321504003 | Web: www.knarquitectura.com | E-mail: kn.arquitectura2017@gmail.com ARCHITECT'S CERTIFICATE Date: 05TH JUNE 2024 To, Poddar Realty India Pvt Ltd., Plot no.26, Shah Industrial Estate, Opp. Anna Temple, New Link Road, Andheri (West), Mumbai – 400 053. Subject : Certificate of Percentage of Completion of Construction Work of VENUS Building of the Project [MAHARERA REGISTRATION NUMBER P51800053403] situated on plot bearing CTS no. 260/A/2 demarcated by its boundaries (latitude and longitude of the end points) plot bearing CTS no. 262/A to the North, plot bearing CTS no. 262/A to the West, plot bearing CTS 264 & 263 to the East, Taluka Andheri, District Mumbai City, Pin 400060. admeasuring 509.78 sq.mts. area being developed by Poddar Realty India Pvt. Ltd. Sir, I Kalpesh Jain of KN Arquitectura have undertaken assignment as Architect of certifying Percentage of Completion of Construction Work of the Venus building of the Project situated on plot bearing CTS no. 260/A/2 of Division Konkan, Village Mogra, Jogeshwari (East), K/E ward, Taluka Andheri, District Mumbai City, Pin 400060. admeasuring 509.78 sq.mts. area being developed by Poddar Realty India Pvt. Ltd. Following technical professionals are appointed by Owner / Promoter:- (i) Shri Kalpesh Jain as Architect of KN Arquitectura (ii) Shri Sunil R Shah as Structural Consultant (iii) Shri. Nebu Thomas Site Supervisor. Based on Site Inspection, with respect to Building of the aforesaid Real Estate Project, I certify that as on 30/06/2024, the Percentage of Work done for the building of the Real Estate Project as registered vide number P51800053403 under MahaRERA is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Office Add. : Shop No.-4, Dhanalaxmi Mahal C.H.S., Nandapatkar Road , Vile-Parle (East), Mumbai-400057. ARCHITECTURE | INTERIORS | LIASONING CONSULTANT Mo: 7057421548, 9321504003 | Web: www.knarquitectura.com | E-mail: kn.arquitectura2017@gmail.com Table A There is one building on plot under reference Sr. No. Tasks /Activity Percentage of work done 1 Excavation 100% 2 Plinth 100% 3 Number of Podiums Not Applicable 4 Stilt Floor 100% 5 10 out of 10 number of Slabs of Super Structure 100% Internal Walls, Internal Plaster, Floorings within 50% 6 Flats/Premises, Doors and Windows to each of the Flat/Premises. Sanitary Fittings within the Flat/Premises, Electrical Fittings 7 within the Flat/Premises. Staircases, Lifts Wells and Lobbies at each Floor level connecting 8 Staircases and Lifts, Overhead and Underground Water Tanks. The external plumbing and external plaster, elevation, completion 9 of terraces with waterproofing of the Building/Wing. 50% Installation of lifts, water pumps, Fire Fighting, Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to 10 obtain Occupation /Completion Certificate. Office Add. : Shop No.-4, Dhanalaxmi Mahal C.H.S., Nandapatkar Road , Vile-Parle (East), Mumbai-400057. ARCHITECTURE | INTERIORS | LIASONING CONSULTANT Mo: 7057421548, 9321504003 | Web: www.knarquitectura.com | E-mail: kn.arquitectura2017@gmail.com TABLE-B Internal & External Development Works in Respect of the entire Registered Phase Percentage of S.No. Common areas, and Facilities, Amenities Proposed Work done Details (Yes/No) 1 Internal Roads & Footh-paths. NO 2 Water Supply YES 3 Sewarage (chamber, lines, Septic Tank , STP). YES 4 Storm Water Drains YES 5 Landscaping& Tree Planting. YES 6 Street Lighting NO 7 Community Buildings NO Treatment and disposal of sewage and sullage 8 water. YES 9 Solid Waste management & Disposal. YES 10 Water conservation, YES 11 Rainwater harvesting YES 12 Energy management NO 13 Fire protection and fire safety requirements YES 14 Electrical meter room. YES 15 Others ( Option to Add more). Yours faithfully, Digitally signed by Kalpesh Shantilal Jain DN: c=IN, o=Personal, title=8651, Kalpesh pseudonym=133528847389955339xgjhEGM6AA3M oJ, 2.5.4.20=eda5ffc8bf16df9eeaf6f815757ab33b06462 b63a44f5675d926b2bdd9bd2480, Shantilal Jain postalCode=401602, st=Maharashtra, serialNumber=5fcad47d0f21bd0ea17fe943e1a0a30 3709da5183028c0819a5514df8cc73851, cn=Kalpesh Shantilal Jain Date: 2024.07.05 12:42:06 +05'30' Kalpesh Jain. (Architect) CA/2009/45181 Office Add. : Shop No.-4, Dhanalaxmi Mahal C.H.S., Nandapatkar Road , Vile-Parle (East), Mumbai-400057.