ARCHITECTURE INTERIORS LIASONING CONSULTANT Mo: 7057421548, 9321504003 Web: www.knarquitectura.com E-mail: kn.arquitectura2017@gmail.com ARCHITECT'S CERTIFICATE Date: 07TH MAY 2024 To, Poddar Realty India Pvt Ltd., Plot no.26, Shah Industrial Estate, Opp. Anna Temple, New Link Road, Andheri (West), Mumbai – 400 053. Subject : Certificate of Percentage of Completion of Construction Work of VENUS Building of the Project [MAHARERA REGISTRATION NUMBER ] situated on plot bearing CTS no. 260/A/2 demarcated by its boundaries (latitude and longitude of the end points) plot bearing CTS no. 262/A to the North, plot bearing CTS no. 262/A to the West, plot bearing CTS 264 & 263 to the East, Taluka Andheri, District Mumbai City, Pin 400060. admeasuring 509.78 sq.mts. area being developed by Poddar Realty India Pvt. Ltd. Sir, I Kalpesh Jain of KN Arquitectura have undertaken assignment as Architect of certifying Percentage of Completion of Construction Work of the Venus building of the Project situated on plot bearing CTS no. 260/A/2 of Division Konkan, Village Mogra, Jogeshwari (East), K/E ward, Taluka Andheri, District Mumbai City, Pin 400060. admeasuring 509.78 sq.mts. area being developed by Poddar Realty India Pvt. Ltd. Following technical professionals are appointed by Owner / Promoter:- (i) Shri Kalpesh Jain as Architect of KN Arquitectura (ii) Shri Sunil R Shah as Structural Consultant (iii) Shri. Nebu Thomas Site Supervisor. --------------------------------------------------------------------------------------------------------------------------- Office Add. : Shop No.-4, Dhanalaxmi Mahal C.H.S., Nandapatkar Road , Vile-Parle (East), Mumbai-400057. ARCHITECTURE INTERIORS LIASONING CONSULTANT Mo: 7057421548, 9321504003 Web: www.knarquitectura.com E-mail: kn.arquitectura2017@gmail.com Based on Site Inspection, with respect to Building of the aforesaid Real Estate Project, I certify that as on 31/03/2024, the Percentage of Work done for the building of the Real Estate Project as registered vide number P51800053403 under MahaRERA is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Table A There is one building on plot under reference Sr. Percentage No Tasks /Activity of work done 100% 1 Excavation 100% 2 number of Basement(s) and Plinth N.A. 3 number of Podiums 100% 4 Stilt Floor 100% 5 10 out of 10 Number of Slabs of Super Structure 6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the 0% Flat/Premises 7 Sanitary Fittings within the Flat/Premises, Electrical 0% Fittings within the Flat/Premises 8 Staircases, Lifts Wells and Lobbies at each 0% Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks 9 The external plumbing and external plaster, 0% elevation, completion of terraces with waterproofing of the Building/Wing 10 Installation of lifts, water pumps, Fire Fighting Fittings and 0% Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate --------------------------------------------------------------------------------------------------------------------------- Office Add. : Shop No.-4, Dhanalaxmi Mahal C.H.S., Nandapatkar Road , Vile-Parle (East), Mumbai-400057. ARCHITECTURE INTERIORS LIAISONING CONSULTANT Mo: 7057421548, 9321504003 Web: www.knarquitectura.com E-mail: kn.arquitectura2017@gmail.com TABLE-B Internal & External Development Works in Respect of the entire Registered Phase S. Common Areas & Proposed Percentage of Details No. Facilities, Amenities (Yes / No) work done 1 Internal Roads & footpaths No 2 Water supply Yes Sewerage (Chamber lines, Yes 3 Septic tank, STP) 4 Storm Water Drain Yes Landscaping and Tree Yes 5 plantation 6 Street lighting No 7 Community building No Treatment & disposal of Yes 8 sewage & sullage water Solid Waste management Yes 9 Disposal 10 Water Conservation Yes 11 Rain Water Harvesting Yes 12 Energy Management No Fire Protection and Fire Yes 13 Safety requirements. 14 Electric Meter room Yes 15 Other (option to Add More Yes Yours faithfully, Kalpesh Digitally signed by Kalpesh Shantilal Jain DN: c=IN, o=Personal, title=8651, pseudonym=133528847389955339xgjhEGM6AA3MoJ, 2.5.4.20=eda5ffc8bf16df9eeaf6f815757ab33b06462b63a44 f5675d926b2bdd9bd2480, postalCode=401602, Shantilal Jain st=Maharashtra, serialNumber=5fcad47d0f21bd0ea17fe943e1a0a303709da 5183028c0819a5514df8cc73851, cn=Kalpesh Shantilal Jain Date: 2024.05.07 19:25:26 +05'30' Kalpesh Jain. (Architect) CA/2009/45181 --------------------------------------------------------------------------------------------------------------------------- Office Add. : Shop No.-4, Dhanalaxmi Mahal C.H.S., Nandapatkar Road, Vile-Parle (East), Mumbai-400057.