NEBU THOMAS B.203 Janki Avenue C.H.S. Ltd Chulna Bhabola Road Vasai (W) Dist.Palghar 401202 FORM-2 [See Regulation 3] ENGINEER’S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account- Project wise) Date: 15.10.2023 To, Poddar Realty India Pvt Ltd Plot No. 26, Shah Industrial Estate, Opp. Anna Temple, New Link Road, Andheri (West), Mumbai – 400 053. Subject : Certificate of Cost Incurred for Development of VENUS Building of the project [MahaRERA] Registration Number] situated on the Plot bearing CTS No.260/A/2 demarcated by its boundaries ( latitude and longitude of the end points) Plot Bearing CTS No. 262/A to the North, Plot Bearing CTS No. 262/A to the West, Plot Bearing CTS No. 264 & 263 to the East, Taluka Andheri, District Mumbai City, PIN 400060, admeasuring 509.78 sq.mts. area being developed by Poddar Realty India Pvt. Ltd Ref : MahaRERA Registration Number _____________________ Sir, I, Nebu Thomas have undertaken assignment of certifying Estimated Cost for the Subject Real Estate Project proposed to be registered under MahaRERA, being VENUS Building situated on the plot bearing CTS No. 260/A/2 of Division Konkan, Village Mogra, Taluka Andheri, District Mumbai Suburban, Jogeshwari (East), K/E Ward, PIN 400060 admeasuring 509.78 sq.mts. area being developed by M/s. Poddar Realty India Pvt Ltd 1. Following technical professionals are appointed by Owner / Promoter :–– (i) Shri Kalpesh Jain as Architect; (ii) Shri Sunil R Shah as Structural Consultant (iii) Shri Nebu Thomas as Site Supervisor 2.I have estimated the cost of the completion to obtain Occupation Certificate/ Completion Certificate, of the Civil, MEP and Allied works, of the Building(s) of the project. Our estimated cost calculations are based on the Drawings/plans made available to us for the project under reference by the Developer and Consultants and the Schedule of items and quantity for the entire work as calculated by ____________________ quantity Surveyor* appointed by Developer/Engineer, and the assumption of the cost of material, labour and other inputs made by developer, and the site inspection carried out by us. 2. I estimate Total Estimated Cost of completion of the building(s) of the aforesaid project under reference as Rs. 13,17,90,000 ( Total of Table A and B). The estimated Total Cost of project is with reference to the Civil, MEP and allied works required to be completed for the purpose of obtaining occupation certificate / completion certificate for the building(s) from the BMC being the Planning Authority under whose jurisdiction the aforesaid project is being implemented. 3. The Estimated Cost Incurred till date is calculated at Rs. 4,17,28,061/- (Total of Table A and B)_. The amount of Estimated Cost Incurred is calculated on the base of amount of Total Estimated Cost. 4. The Balance cost of Completion of the Civil, MEP and Allied works of the Building(s) of the subject project to obtain Occupation Certificate / Completion Certificate from BMC (planning Authority) is estimated at Rs. 9,00,61,939/- ( Total of Table A and B). 5. I certify that the Cost of the Civil, MEP and allied work for the aforesaid Project as completed on the date of this certificate is as given in Table A and B below TABLE A Building called VENUS (to be prepared separately for each Building /Wing of the Real Estate Project) Sr. No Particulars Amounts (1) (2) (3) 1 Total Estimated cost of the building/wing Rs. 13,17,90,000/- as on 31/03/2023 2 Cost incurred as on 31/03/2023 Rs. 4,17,28,061/- (based on the Estimated cost ) 3 Work done in Percentage _______________ % (as Percentage of the estimated cost ) 4 Balance Cost to be Incurred Rs. 9,00,61,939/- (Based on Estimated Cost) 5 Cost Incurred on Additional /Extra Items Rs. _______________ as on _____________not included in the Estimated Cost (Annexure A) TAB TABLE B (to be prepared for the entire registered phase of the Real Estate Project) Sr. No. Particulars Amounts (1) (2) (3) 1. Total Estimated cost of the Internal and External Rs. _______________ Development Works including amenities and Facilities in the layout as on __________________ date of Registration is Cost incurred as on ____________ 2. (based on the Estimated cost). Rs.______________ Work done in Percentage ________ % 3. (as Percentage of the estimated cost) Balance Cost to be Incurred 4. (Based on Estimated Cost). Rs. ______________ Cost Incurred on Additional /Extra Items as on _______________not included in the 5. Estimated Cost (Annexure A). Rs. _______________ Yours Faithfully, Digitally signed by NEBU THOMAS NEBU DN: c=IN, postalCode=401202, st=MAHARASHTRA, l=THANE, o=Personal, serialNumber=7ed3962c5150b72604d68098a4f0 2dd19ce61aefa855792d8a3945e879760ac5, pseudonym=a1274a4791ac4a5e8a32427f1a8fec3 THOMAS 4, 2.5.4.20=4f260e0830971be8c6e649b71cf609f796 368665f9db9b3c29e91e034b1e82d2, email=NEBUTHOMAS12@GMAIL.COM, cn=NEBU THOMAS Date: 2023.10.17 14:12:19 +05'30' Nebu Thomas (Licence No. T/179/SS-II) * Note : 1. The scope of work is to complete entire Real Estate Project as per drawings approved from time to time so as to obtain Occupation Certificate/Completion Certificate. 2. (*) Quantity survey can be done by office of Engineer or can be done by an independent Quantity Surveyor, whose certificate of quantity calculated can be relied upon by the Engineer. In case of independent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marked (*) and in case quantity are being calculated by office of Engineer, the name of the person in the office of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked (*). 3. The estimated cost includes all labour, material, equipment and machinery required to carry out entire work. 4. As this is an estimated cost, any deviation in quantity required for development of the Real Estate Project will result in amendment of the cost incurred / to be incurred. 5. All components of work with specifications are indicative and not exhaustive. Annexure A List of Extra/Additional Items executed with Cost (which were not part of the original Estimate of Total Cost)