ARCHITECT MANDAR DINKAR B ARCH ARCHITECT'S CERTIFICATE Date 31-March-24 To, M/s.Saptarishi Urban Space Private Limited, 801-802, Crystal Tower CHS Ltd. MarutiLane, Fort, Mumbai 400001 Subject: Certificate of Percentage of Completion of Construction Work of Meluha having MahaRERA Registration Number P51800053441being developed by M/s. SaptarishiUrban Private Limited Space Sir, I Mandar More have undertaken assignment as Architect of certifying Construction Work of Meluha having MahaRERA Registration NumberPercentage of Completion of developed by M/s. Saptarishi Urban Space Private Limited P51800053441 being Based on Site Inspection, with respect to Layout/each of the Estate Project, Icertify that as on the date of this Building/Wing of the aforesaid Real of the building/Wing of the Real Estate Project certificate, the Percentage of Work done for each under MahaRERA 0s as per Table A herein below. The percentage of the work executed with respect to each of the activity of the in Table B. entire phase is detailed TABLE-A Building Name Meluha Sr. No. Tasks /Activity Percentage of work done (1) (2) (3) 1 Excavation 0% 2. Basement(s) (if any) 0% 3. Podiums (if any) 0% 4. Plinths 0% 5. Stilt Floor 0% 6. Slabs of Super Structure 0% 7 Internal Walls, Internal Plaster, Floorings, Doors and 0% Windows within Flat/Premises. 8. Sanitary Fittings within the Flat/Premises. 0% ARCHITECT MANDAR DINKAR B ARCH 9. Staircase, Lift wells and Lobbles at each Floor level 0% Overhead and Underground Water Tanks 10 External plumbing and external plaster, elevation, 0% completion of terraces with waterproofing of the Building/Wing. 11 Installation of lifts, water pumps, Fire Fighting Fittings and 0% Equipment as per CFO NOC, Electrical fittings, mechanical equipment,compliance to conditions of environment /CRZ NOC, finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any Other activities. TABLE-B Internal and External Development Works in respect of the entire Registered Phase S.No. Common areas and Facilities, Amenities Proposed Percentage of Details (Yes/No) Work done (1) (2) (3) (4) (5) 1 Internal Roads &Foothpaths No Water Supply Yes 0% As per MCGM approval 3 Sewerage (chamber, lines, Septic Tank, Yes 0% As per MCGM STP) approval 4 Storm Water Drains Yes 0% As per MCGM approval 5 Landscaping &Tree Planting Yes 0% Street Lighting No 7 Community Buildings No 8 Treatment and disposal of sewage and Yes 0% As per MCGM sullage water approval 9 Solid Waste management &Disposal Yes 0% As per MCGM approval Date: Name: Promoter Signatureof Agreed Architect Principal CA/2001/27121) DINKAR (LicenseNo.MANDAR Faithfully, Yours T 14 13 12 11 10 and CA/271212001/.Reg. conservation, Rainwater Water ,N receiving Othersstation requirements Electrical management Fire Energy harvesting Accepted cherag protection (Option meter by to room, and Add fire more)sub-station, safety Yes Yes Yes Yes MANDAR ARCHITECT DINKAR 0% 0% 0% 0% perAs MCGMper approval MCGMapproval approval perAs As MCGMapproval perAs MCGM ARCH B