RAY CONSULTANTS 101, Matru Vatsalya, V. P. Road, Andheri (W), Mumbai - 400 058. Tel.: 022-2620 8644 / 2620 9032 24.07.2025 FORM 1 To, M/s. TAMOS ASSOCIATES 1001, AlTaheri CHSL, Saifee Park, Church Road, Marol, Andheri East, Mumbai 400059. Sub: Certificate of Percentage of Completion of Construction Work for redevelopment of Existing Residential Building Known as SANGHVI KANDIVALI CO.OP.HOUSING SOC.LTD. Plot bearing C.T.S No. 3, 3/1 to 38 of village Akurli and C.T.S. No. 377/A, 377/1 to 20 of Village Poisar at Kamala Nehru Cross Road No.01 Kandivali (West), Mumbai-400067. (MAHARERA NO. P51800053396) For KANDIVALI SANGHVI CO.OP. HOUSING SOCIETY LTD. Ref: Bldg File No. P-7691/2021/(3)/R/S Ward/AKURLI-R/S - Sir, I, Abhijit A. Mehta have undertaken assignment as Licensed Surveyor of certifying Percentage of Completion of Construction Work of for the building KANDIVALI SANGHVI CO.OP.HOUSING SOC.LTD. Plot bearing C.T.S No. 3, 3/1 to 38 of village Akurli and C.T.S. No. 377/A, 377/1 to 20 of Village Poisar at Kamala Nehru Cross Road No.01 Kandivali (West), Mumbai-400067, being developed by M/s. TAMOS ASSOCIATES 1. Following technical professionals are appointed by Owner / Promoter :- (i) Shri. A. A. Mehta as License Surveyor. (ii) Mr. H M Raje as Structural Consultant. (iii) Shri. Hemant Madhani as Site Supervisor. Based on Site Inspection; with respect to each of the Building of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of Work done for each of the buildings of the Real Estate Project as registered vide number - P51800053396 under MahaRERA is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Table A Sr. No Tasks /Activity Percentage (%) of work done 1 Excavation 100% 2 Basement (If any) 90% 3 0% Podiums (If any) 4 Plinth 100% 5 Stilt Floor 53% 6 Slabs of Super Structure 25% 7 Internal walls, Internal Plaster, Floorings 0% within Flats/Premises, Doors and Windows to each of the Flat/Premises 0% 8 Sanitary Fittings within the Flat/Premises, Electrical Fittings within the Flat/Premises 9 Staircases, Lifts Wells and Lobbies at each 0% Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks 0% 10 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing, 11 Installation of lifts, water pumps, Fire 0% Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOС, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate TABLE-В Internal & External Development Works in Respect of the entire Registered Phase Proposed Percentage (%) of Work Details Sr. Common areas and (Yes/No) No. Facilities, Amenities done 1 Internal Roads & No 0% Footpaths 2 Water Supply Yes 0% Yes 0% 3 Sewerage (chamber, lines, Septic Tank, STP) 4 Storm Water Drains Yes 0% 5 Landscaping & Tree Yes 0% Planting 6 No 0% Street Lighting 7 No N.A. Community Buildings 7 Community Buildings No NA Treatment and disposal No 0% 8 of sewage and sullage water 9 No 0% Solid Waste management & Disposal 10 Water conservation, Rain Yes 0% water harvesting 11 No N.A. Energy management 12 Fire protection and fire Yes 0% safety requirements 13 Electrical meter room, Yes 0% sub-station, receiving station 14 Swimming Pool No 0% 15 Fitness Center No 0% 16 Society office No 0% Thanking You, Yours Faithfully, For Ray Consultants Pry Mr. A.A Mehta License Surveyor ES Lic. No. M/320/LS For TAMOS ASSOCIAT MMBon Partner