• .. space v1s1on Architect and Planner Ar. Bhavin Modi Ar. Madhura Bhavin Modi Ann exur e A FORM 1 (See Regu latio n 3) ARCHITECT'S CER TIFIC ATE ct and for withd rawa l of Money (To be subm itted at the time of Registration of Ongoing Proje from Designated Account) , 23 TO 31ST DECEMBER 23) (QUARTER PERIOD OF 01ST NOVEMBER nd Date : 02 January, 2024 . To, MP Spac e Dyna mics Pvt. Ltd 1305 , Hurr ah, City of Joy, Nirm al lifes tyle, JSD Road, Mulund West, Mumbai - 400 080. w Ashw in Completion of Construction work of "Ne Subj ect: Certificate of Percentage of 253 253 of TPS III Borivali, C.T.S. No. FP/ CHSL" having on plot bearing F.P. No. ion of villag e Borlvali situa ted at Babh al Borivali (wes t),. Maha RERA Registrat by the MP Spac e Dyna mics Pvt. Ltd. Number:P51800053401 being developed Sir, certi fying n assignment as Architects Surv eyor of I, Shri Bhavin Arvind Modi have undertake ing havin g on work of "New Ashw in CHSL" the build Percentage of Completion of Constructi Spac e 0053401 being developed by the MP Maha RERA Registration Number:PS180 Dyna mics Pvt. Ltd. Real Estate to Layo ut of the Building of the aforesaid Based on Site Inspe ction , with respect done for of this certificate, the Percentage of Work Project, I certi fy that as on the date tered as per e Project unde r Maha RERA is as regis each of the building of the Real Estat of the work executed with respect to each of the Tabl e - A herein below. The percentage Table B. activ ity of the entir e phase Is detailed In Edge-II, Behind Metro, Off Western Exp Highway, Office Address: 1004, 10th Floor, B-Wing, Western 71/9863967137. Email: bhavinmodi@spacevis1onarchitects.com Borivali (East), Mumbai-400066.Tel.: 022-287083 space vision Architect and Planner Ar. Bhavin Modi Ar. Madhura Bhavin Modi Tab le A each Layout/Building/Wing 01 (to be prepared separately for Layout/Building/Wing Num ber of the Project) Per cen tag e Sr. Tas k/ Act ivit y of Wo rk Don e No. (As of date of the Certificate 1st November st 2023 to 31 December 23) (3) (2) (1) 100 % 1. Excavation N. A. 2. Number of Basement(s) 0% 3. Number of Plinth 0% 4. Number of Podium 0% s. Stil t Floor 0% 6. Slabs of Sup er Structure Floorings, Doors and Windows Inte rna l walls, Inte rna l Plaster 0% 7. with in Flat/Premises l /Premises, Premises, Electrica San itar y Fittings within the Flat 0% 8. es Fittings with in the Flat/Premis l Lobbies at each Floor leve Staircases, Lifts Wells and 0% 9. er tanks. Overhead and Underground Wat ation, and external plaster, elev The exte rna l plumbing 0% / waterproofing of the Building 10. completion of terraces with Wing. ps, Fire Fighting Fittings and Inst alla tion of hfts, wat er pum , Electrical fittin gs, mechanical Equipment as per CFO NOC ditions of environment /CFU. equipment, Compllance to con y/s, plinth protection, paving NOC, finishing to entrance lobb 0% l 11. Building/Wing, Compound Wal of areas appurtenant to to irements as may be required protection and all oth er requ . cification In agreement of sale complete pro ject as per spe Any oth er activities. tern Exp Highway, Western Edge-II, Behind Metro, Off Wes Office Address: 1004, 10th Floor, B-Wing, di@s pace visionarchttects.com 28708371 /9863967137. Email • bhavinmo Bonvali (East), Mumbai-400066.Tel.: 022- • space vision Architect and Planner Ar. Bhavin Modi Ar. Madhura Bhavin Modi TABLE- B of the Registered Common Area (Interna l and External Develop ment Works) in respect Phase/Project Number Sr. No. Commo n areas and Proposed Percen tage of Details Facllltle s, Amenit ies (Yes/N o) Work Done{A s on date of the st Certifie d 1 Novem ber st 2023 to 31 Decemb er 23) (2) (3) (4) (5) (1) No 0% NA 1. Internal Roads & Footpaths Yes 0% ----NA-- -- 2. Water Supply Sewerage (chambe r, lines, ----NA-- -- 3. Yes 0% Septic Tank, STP) Yes 0% ----NA-- -- 4. Storm Water Drains Yes 0% ----NA-- -- 5. ...andscaping & Tree Planting 6. Street Lighting No - ---NA--- 7. ::ommun ity Buildings No - ---NA--- Treatme nt and disposal 01 ---NA--- 8. No 0% sewage and sullage water. ISolid Waste Management & 0% ---NA--- 9. Yes Disposal Water Conversation & Rain 0% ---NA--- 10. Yes Water Harvesting No 0% ---NA--- 11. Energy Manage ment -ire Protection and fire safety ---NA--- 12. Yes 0% requirem ents Electrical metre room, sub- ----NA-- -- 13. Yes 0% istation, receiving station. 14. Others (options to add more) NA - - Highway, Office Address. 1004, 10th Floor, 8-Wing, Western Edge-II, Behind Metro, Off Western Exp 67137. Email: bhavinmo di@space visionarchitects.com Borivali (East), Mumbai-400066.Tel.: 022-28708371/98639 • space v1s1on I I Architect and Planner Iv. Bhavin Modi Iv. Madhura Bhavin Modi ~111''9'°"b y BHAVIN IHA'ltl AIMID 1o10D1 ARVIND MODI OM.l024,0im 11 4C>SO tOS'lO' Yours Faithfully, Signature & Name of Architect SHRI BHAVIN ARVIND MODI (license No CA/200 2/2886 4} ~ ' Agreed and Accepted by: Signature of Promoter Name: MP Space Dynam ics), Date: 31.12.2 023. Exp Highway, Office Address: 1004, 10th Floor, B-Wing, Western Edge-II, Behind Metro, Off Western Mumbai-400066.T el.: 022-28708371 /9863967137. Email : bhavinmodi@spac evisionarchitects.com Borivali (East),