BHUSHAN JADHAV ARCHITECT (B.ARCH) FORM-1 [see Regulation 3] ARCHITECT’S CERTIFICATE To Date:31.12.2025 M/s Shree Swami Samarth Builders 101, SHH Residency, Lake Road, Near TATA Power, Shiva indl Estate, Bhandup(W), Mumbai-400078. Subject: Certificate of Progress of Work of Project –Virginia CHS for new registration under Maharera being Developed by M/s Shree Swami Samarth Builders Sir, I/ we Sachin Gaikwad of M/s Design Crest have undertaken assignment as Architect / Licensed Surveyor of certifying Percentage of Completion of Construction Work of Project - Virginia CHS for new registration under Maharera being Developed by M/s Shree Swami Samarth Builders Based on Site Inspection, with respect to each of the Building / Wing of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of Work done for each of the building / Wing of the Real Estate Project to be registered under RERA is as per table A herein below. The percentage of the work executed with respect to each of the major activity of the Building / Wing and Overall Percentage of the work done with respect to each Building / Wing is detailed in the Table B. Table A for Composite Building Tasks /Activity Percentage of work Sr. No done 1 Excavation 100% 2 Number of Basement 100% 3 Plinth 100% 4 Podiums NA 5 Stilt Floor 0% 6 Slabs of Super Structure 17% 7 Internal walls, Internal Plaster, Floorings, Doors and Windows 0% within Flat Premises. 8 Sanitary Fittings within the Flat/Premises. 0% 9 Staircases , Lift Wells, Lobbies at each Floor Over head and 0% Underground water Tank. 10 External plumbing and External Plaster, elevation, completion of 0% terraces with waterproofing of the Building/Wing 11 Installation of lifts, water pumps, Fire Fighting Fittings and 0% Equipment as per CFO NOC, Electrical fittings, mechanical equipment, Compliance to conditions of environment/CRZ NOC, Finishing to entrance Lobby/s, Plinth Protection, Pving of areas appurtenant to Building/Wing, Compound Wall and all other _________________________________________________________________________________ MOB.-9967199472 Email-bhushanjadhav1123@rediffmail.com Address:- 101, Shree Krushna Tower,Mulund West, Mumbai – 400078. BHUSHAN JADHAV ARCHITECT (B.ARCH) requirements as may be required to complete the Project as per Specification in Agreement of Sale. Any other activities. TABLE – B Internal & External Development Works in Respect of the project S. No. Common Roads and Facilities, Proposed Percentage of Details Amenities (Yes/No) Work done 1 Internal Roads & Foot Paths No NA 2 Water Supply Yes 0% water connection will be obtained after the completion of the building 3 Sewerage (chamber, sewage lines), Yes 0% Will be completed as Storm Water Drains per SWD remarks 4 Landscaping & Tree Planting No NA 5 Common area Lighting Yes 0% Will be completed before OCC 6 Water conservation, Rain water Yes 0% Will be completed as harvesting per remarks of RWH 7 Fire protection and fire safety Yes 0% Will be completed as requirements per CFO NOC 8 Electrical meter room, sub-station, Yes 0% Will be completed as receiving station per norms of MSEDCL Yours Faithfully MR. BHUSHAN JADHAV Digitally signed by BHUSHAN VITTHAL JADHAV DN: c=IN, o=Personal, title=4108, BHUSHAN VITTHAL JADHAV 2.5.4.20=71568aa38c9412d697db592a76f362f1182943156deea437bd89de469c4de6bd, postalCode=400078, st=Maharashtra, serialNumber=e29f3085ca9e63d116ea2e1d5ce161539b8262bcff1c1aa585fee2f657e1a2c1, cn=BHUSHAN VITTHAL JADHAV Date: 2026.01.17 17:52:44 +05'30' Architect (License no CA/2012/57189) Agreed & Accepted By Promoter M/s Swami Samarth Builders Mr. Vaibhav A Kokate partner Date: 31.12.2025 _________________________________________________________________________________ MOB.-9967199472 Email-bhushanjadhav1123@rediffmail.com Address:- 101, Shree Krushna Tower,Mulund West, Mumbai – 400078.