1.21 FSI I.O.D. DWG. ( 18-05-2023 ) 1 1.50M HIGH COMPOUND WALL. 5.80 PROVISION FOR FUTURE WIDENING TO 9.00 MT PROVISION FOR FUTURE WIDENING TO 9.00 MT GROUND LVL. 1.50 6.00 M. WIDE 9.00 ROAD D +0.00 MT. LVL. 16.9 OA 13.40 MT.W. ROAD 2 .R T.W W.CABIN 1.50 PROVISION FOR FUTURE WIDENING TO 9.00 MT .40M GR. LEVEL. 2.00 x 1.50 4.64 4.17 4.28 13 4.57 5.58 NORTH GATE 5.70 4.53 3.11 M.S. LADDER LADDER NO COMPOUND WALL. 3.00 4.53 13.40 MT.W. 51ST ROAD 2.60 13.40 MT.W. 50TH ROAD 11.48 COMPOUND WALL SECTION EAST 18.30 MT.W. ROAD 9.16 L.O.S.AREA CALCULATION 13.40 M. WIDE EXISTING 51ST ROAD 3.36 3.32 9.00 SCALE : 1 : 100 3.93 3.28 PUMP ROOM 4.87 6.32 1 1/2 X 16.92 X 5.70 X 1 NO = 49.07 SQ.MT. +0.00 m lvl. ENTRANCE - 2 1/2 X 16.92 X 5.80 X 1 NO = 49.07 SQ.MT. NO COMPOUND WALL. 6.00 M. WIDE ROAD LOBBY STAIR CASE & SOUTH 4.59 LIFT LOBBY TOTAL ADDITION = 98.14 SQ.MT. ---A SITE U/R SECTION THROUGH U.G. TANK 6 1.50 1.50 1.50 1.50 1.5 5 0.1 6 4.5 5.00 4.63 3.13 4.68 UPPER FLR.BLDG. LINE 4.67 3.17+0.00 m lvl. - LOCATION PLAN 20.53 3.20 21.58 21.55 3.15 NO COMPOUND WALL. NO COMPOUND WALL. NO COMPOUND WALL. SCALE -1:4000 03. 57 13.40 M. WIDE EXISTING 50TH ROAD W.CABIN 1.50 1.50 WEST 1.43 1.70 x 1.20 PROVISION FOR FUTURE WIDENING TO 9.00 MT 3.18 3.37 2.93 2.00 3.83 +0.30 mt lvl. 4.64 4.28 PERFORATED L.O.S.AREA CALCULATION 4.58 4.57 4.64 1 1/2 X 03.57 X 1.55 X 1 NO = 2.77 SQ.MT. 5.58 6.06 TOILET DUCT ABOVE 2 1/2 X 21.55 X 3.20 X 1 NO = 34.48 SQ.MT. I FORM - I TOTAL AREA CERTIFICATE FOR AREA E1 E2 ( IN SQ.MT ) GATE SLOPE 3.85 N1 3.70 3 1/2 X 21.58 X 0.16 X 1 NO = 1.73 SQ.MT. PARKING STATEMENT ( WING A & B ) ( AS PER DCPR 2034 ) TOILET DUCT ABOVE D/W D/W E8 D/W E9 4 1/2 X 21.58 X 3.15 X 1 NO = 33.99 SQ.MT. Area Statement. CERTIFIED THAT I HAVE SURVEYED THE PLOT UNDER REFERENCE E7 3.03 F.C. S1 20.75 .32 PARKING REQD. FOR RESIDENTIAL +0.00 m lvl. - 4.53 0.30 2.95 2.20 4.74 TOTAL ADDITION = 72.97 SQ.MT. ---B 1 Area Of Plot 1138.80 ON 12-02-2018 AND THAT DIMENSIONS OF SIDES, ETC. OF THE 4.40 3 N2 CHAJJA ABOVE 21.6 N3 5 PLOT AREA CALCULATION PLOT STATED ON PLAN ARE AS MEASURED ON SITE AND THE GIRDER BEAM ABOVE 0.08 CHAJJA ABOVE CARPET AREA PARKING NO.OF TOTAL PARKING a) Area of Reservation in Plot ------ +0.45 m lvl. 1.35 L/V E4 1.54 4.62 IN SQ.MT. REQUIRED FLATS REQUIRED AREA SO WORKED OUT IS 1138.80 SQ. M. (ONE THOUSAND ONE CHAJJA ABOVE 5.20 3.11 L.O.S. AREA REQUIRED 8. b) Area of Road Set-Back ------ 8.4 70 L/V 1 17.38 HUNDRED THIRTY EIGHT POINT EIGHTY SQUARE METERS ONLY) E3 E5 L/V E6 4.2 1NO./ 4 FLATS 14.00 Nos. CHAJJA ABOVE L/V L.O.S. AREA REQUIRED 15% OF 1138.80 SQ.MT= 170.82 Sq.mt 0 BELOW TO 45.00 03.50 Nos. L.O.S. REQUIRED AREA = 170.82 Sq.mt c) Area of D.P. Road ------ AND TALLIES WITH THE AREA STATED IN THE DOCUMENT OF CHAIN LINK ( NO COMPOUND WALL ) 4.50 4.75 30.53 45.00 TO 60.00 1NO./ 2 FLATS 11.00 Nos. 05.50 Nos. 4.25 6.38 TOTAL PROP. L.O.S. AREA 29.85 2 Deductions For OWNERSHIP RECORDS. 3.93 N4 2.50 B23 B22 S19 S18 2.30 S3 S2 2.50 ( A +B ) ( 98.14 + 72.97 ) = 171.11 Sq.mt 24. 75 10.7 60.00 TO 90.00 1NO./ 1 FLATS NIL NIL N5 A For Reservation / Road Area TOILET DUCT ABOVE 2.81 9 7 .9 4 38.6 .48 1NO./ 2 FLATS 23 90.00 ABOVE NIL NIL D/W +0.30 mt lvl. 1.50 21 a) Road Set-Back Area To Be Handed Over ( 100% ) ( Reg. No. 16 ) ------ 13.40 M. WIDE EXISTING 51ST ROAD D/W STACK PARKING STACK PARKING 3.92 10 4.53 N5 N7 S5 S4 4.50 8.45 .61 TOTAL FLAT 25.00 Nos. 09.00 Nos. - -(i) b) Proposed D.P. Road To Be Handed Over ( 100% ) ( Reg. No. 16 ) ------ 3.90 0.53 7.1 3 LVL. PUZZLE PARKING SYSTEM ( 6 CARS ) 1.20 5 1 5. 8 1.3 3.18 7 BHAVIN Digitally signed 25% OF PARKING FOR VISITORS 02.25 Nos - - ( ii ) c) (i) Reservation Area To Be Handed Over ( 100% ) ( Reg. No. 17 ) ------ CHAJJA ABOVE 2.30 S21 S20 S17 S16 2.30 2.30 PLOT AREA DIAGRAM by BHAVIN CHAJJA ABOVE 11.48 S24 S25 S26 (ii) Reservation Area To Be Handed Over As Per AR ( 100% ) ( Reg. No. 17 ) ------ 5.78 SLOPE 3.05 FOR NURSING HOME ( B/U AREA = 265.61 SQ. MT. ) ARVIND L/V 3.20 SCALE - 1:500 01.77 Nos. - - ( iii ) ARVIND MODI UG.TANK BELOW ONE PARKING SPACE FOR EVERY 150 SQ.MT. OF TOTAL FLOOR AREA OF For Amenity Area STACK PARKING STACK PARKING B Date: 2023.05.18 N9 0.72 N8 4.50 4.50 S6 U.G. TANK DESIGN TO TAKE LOAD OF VISITOR PARKING FOR COMMERCIAL. 02.00 Nos. - - ( iv ) a) Area Of Amenity Plot/Plots To Be Handed Over As Per DCR. 14 (A) ------ MODI 18:09:01 +05'30' S7 3.35 VEHICLES 1.25 S27 S28 S29 TOTAL NO OF PARKING REQD. ( i + ii + iii + iv )= 15.02 Nos. SAY 15.00 Nos. b) Area Of Amenity Plot/Plots To Be Handed Over As Per DCR. 14 (B) ------ A S8 W.R 5.65 S9 5.06 9.16 A EAST 26.12 TOTAL NO OF PARKING PROVIDED 29.00 Nos. c) Area Of Amenity Plot/Plots To Be Handed Over As Per DCR. 35 ( Abeyance ) ------ SIGNATURE OF LICENCED ARCHITECT. ELE.CABLES 4.92 1.50 2.50 1.50 3.16 GROUND FLOOR PARKING Deductions For Existing BUA To Be Retained If Any/ Land 0.75 MT.W. CHAJJA ABOVE LOBBY 1.50 1.50 NORTH L/V 4.65 2.15 x 4.50 BIG CAR 14 C Component Of Existing BUA/ Existing BUA As Per Reg. Under ------ 19.03 3.10 Which The Development Was Allowed. 3.39 3.36 SLOPE 3.32 CHAJJA ABOVE +0.45 m lvl. 1.50 1.90 D/W U.G. PUMP 3.6 4 UG.TANK BELOW U.G. TANK DESIGN +0.30 mt lvl. 2.79 3.28 SMALL CAR TOTAL PARKING 15 29 Nos 3 Total Deductions: [ {2(A)+2(B)} + 2(C) As And When Applicable. ------ FORM - I I 4.87 N11 N10 TO TAKE LOAD OF TOILET DUCT ABOVE TOILET DUCT ABOVE 4 Balance Area Of Plot ( 1 Minus b ) 1138.80 0.85 S11 S10 ROOM BELOW VEHICLES D/W E11 UPPER FLR. BLDG. LINE E12 D/W E13 UPPER FLR. BLDG. LINE E14 D/W E15 D/W E16 S19 6.32 METER PANEL L/V Plot Area Under Development After Areas To Be Handed Over To CONTENT OF SHEET 3.10 5 ------ 1.50 MCGM/Appropriate Authority As Per Sr. No.4 Above METER PANEL 1.23 x 2.25 2.00 1.55 1.55 +0.30 mt lvl. 4.71 CHAJJA ABOVE 1.50 1.50 B 27.40 B CHAIN LINK ( NO COMPOUND WALL ) 3.05 2.22 4.83 ENTRANCE LOBBY 0.80 S9 STACK PARKING 6 Zonal ( Basic ) FSI ( 0.50 Or 0.75 Or 1 Or 1.33 ) 1.00 STILT FLOOR PLAN,1ST FLOOR PLAN ( WING- A & B ), BLOCK 4.52 x 3.05 +1.02 mt. lvl. S12 4.34 Built Up Area As Per Zonal ( Basic ) FSI ( 4*6 ) ( In Case Of Mill PLAN, LOCATION PLAN, U.G.TANK & COMPOUND WALL 4.59 1.08 STACK PARKING 7 1138.80 Land Permissible BUA Kept in Abeyance ) METER PANEL N13 N12 2.50 S7 SECTION, PLOT AREA DIAGRAM & CALCULATION, BUILT UP & 2.84 TOILET DUCT ABOVE 3.08 2.76 2.00 +0.45 m lvl. 8 Built Up Equal To Area Of Land Handed Over As Per Reg. 30(A) D/W 5.50 3.05 S14 S13 S8 PARKING STATEMENT, BUILT UP AREA DIAGRAM & SLOPE STACK PARKING 6.60 4.50 (i) CALCULATION 1ST FLOOR PLAN ( WING- A & B ), SOUTH N14 N15 W7 W8 S15 2.33 5.50 5.50 ------ 15.88 3.25 S16 As Column 6 Of Table-12 On Remaining / Balance Plot.) 2.50 ELE.CABLES B15 B14 5.50 7.41 4.70 5.50 4.35 B5 B3 B1 1.50 2.00 D/W (ii) In Case Of 2(A)(c) (ii) Permissible Over And Above Permissible BUA On . ------ CHAJJA ABOVE B10 B12 3.30 B6 B4 B2 Remaining / Balance Plot 0.33 LOBBY W5 L/V 3.20 W6 B13 B11 ENTRANCE LOBBY 7.41 X 3.30 2.30 2.35 x 3.16 LIFT BUILT-UP AREA SUMMARY 276.05 DESCRIPTION OF PROP/ PROPERTY. +0.45 m lvl. 1.20 STACK PARKING STACK PARKING (iii) 10 (2) Advantage Under T.P Sheme CHAJJA ABOVE 2.50 +0.45 m lvl. STACK PARKING 1.88 x 1.43 STAIRCASE AREA TOTAL PROPOSED BUILT UP FUNGIBLE COMPONENT OF TOTAL PROPOSED BUILT UP 3.20 N16 W2 2.50 2.50 2.50 2.50 COUNTED IN F.S.I. AREA WITH FUNGIBLE & REHAB CLAIMED FREE OF AREA LESS FUNGIBLE PROPOSED REDEVELOPMENT OF EXISTING BUILDING KNOWN AS 2.50 W1 0.53 FLOOR Built Up Area In Lieu Of Cost Of Construction Of Built Up Amenity To Be Handed TOILET DUCT ABOVE ELE.CABLES 0.94 2.63 STACK PARKING W9 W10 S17 +0.30 m lvl. STAIRCASE LIFT LOBBY PREMIUM COMPONENT OF REHAB 9 ------ NEW ASHWIN CO.OP. HGS. LTD. ON PLOT BEARING FP NO. 253 OF D/W 3.13 29.55 (1) (2) Over ( Within The Limit Of Permissible BUA On Remaining Plot.) ( 3=1+2 ) (4) ( 5 =3 - 4 ) 67 1.50 1.50 1.50 1.50 TPS III BORIVALI, C.T.S. NO. FP/253 OF VILLAGE BORIVALI SITUATED 0.55 0. W3 W4 WINGS A (RESI) B (COMM) A (RESI) B (COMM) A (RESI) B (COMM) ---- ---- 10 ------ 3.3 4.54 W11 UPPER FLR. BLDG. LINE D/W L/V D/W L/V UPPER FLR. BLDG. LINE D/W L/V D/W UPPER FLR. BLDG. LINE L/V W12 S18 Table No.12 Of Reg. No.30(A) On Remaining / Balance Plot. AT BABHAI , BORIVALI ( WEST ), MUMBAI. SLOPE SLOPE SLOPE SLOPE SLOPE SLOPE 6 5.00 2.6 STILT FLOOR ---- ---- ---- ---- ---- ---- ---- ---- 7 4.63 4.63 Permissible Built Up Area Under Reg.33 (7)(B) Of DCPR 2034 TOILET DUCT ABOVE TOILET DUCT ABOVE TOILET DUCT ABOVE 11 ------ 4.07 4.67 1ST FLOOR 169.50 165.15 38.30 100.46 207.80 265.61 22.55 185.25 + 265.61 = 450.86 3.7 7 3.13 2.63 2.65 3.17 2ND FLOOR 169.50 ---- 38.30 ---- 207.80 ---- 34.93 172.87 12 ------ And 32 On Remaining / Balance Plot. ( As Per Road Width Policy) +0.00 m lvl. CHAIN LINK ( NO COMPOUND WALL ) CHAIN LINK ( NO COMPOUND WALL ) GATE 4.50 3RD FLOOR 184.22 ---- 38.18 ---- 222.40 ---- 32.62 189.78 NAME & ADDRESS OF OWNER - 1.98 13 Permissible Built Up Area { As The Case May Be With / Without BUA As Per 2(c)} 1414.85 3.30 44.08 4TH FLOOR 184.22 ---- 38.18 ---- 222.40 ---- 32.63 189.77 14 Proposed BUA {As The Case May Be With / Without BUA As Per 2(c)} 1374.30 New Ashwin Co.Op. Hgs. Ltd. +0.00 m lvl. 5TH FLOOR 190.81 ---- 38.18 ---- 228.99 ---- 43.30 185.69 - +0.00 m lvl. - 15 TDR Generated If Any As Per Regulation 30(A) And 32. ------ 6TH FLOOR 196.02 ---- 38.06 ---- 234.08 ---- 48.75 185.33 Plot Bearing FP NO. 253 OF TPS III Borivali, 16 Fungible Compensatory Area As Per Reg. No. 31 (3) TOTAL PROP. B/U AREA C.T.S. No. FP/253 Of Village Borivali Situated 13.40 M. WIDE EXISTING 50TH ROAD ( WITH FUNGIBLE ) 1094.27 165.15 229.20 100.46 1323.47 265.61 214.78 1374.30 a) (i) Permissible Fungible Compensatory Area For Rehab Component Without Charging Premium 214.78 At Babhai , Borivali ( West ), Mumbai TOTAL PROP. B/U WEST 1259.42 329.66 1589.08 214.78 1374.30 NAME & ADDRESS OF C.A TO OWNER GROUND ( STILT ) FLOOR PLAN AREA (ii) Fungible Compensatory Area Availed For Rehab Component Without Charging Premium 214.78 SCALE :- 1:100 ( WING-'A' & 'B' ) M.P. SPACE DYNAMICS PVT.LTD. Digitally signed b) (i) Permissible Fungible Compensatory Area By Charging Premium(13 (ii) x 0.35% ----- SINKAR by SINKAR GURUPRA GURUPRASAD VIJAY 13.65 1.55 (ii) Propose Fungible Compensatory Area Availed On Payment Of Premium Office:8, Sarraswathi Bhavan, Ganjawala SAD VIJAY Date: 2023.05.18 0.15 1.20 2.30 3.20 2.00 4.60 0.20 ----- 18:11:01 +05'30' 2.38 4.80 Lane, Borivali ( West ) Mumbai- 400092. 0.60 (iii) Total Fungible Area ( 16 a(ii) + 16 b (ii) 214.78 S.S. 0.81 1.20 4.63 4.63 4.35 4.35 4.35 1.41 1.41 S.S. DUCT 1.41 DUCT FC 2.31 17 Total Built Up Area Permissible Including Fungible Compensatory Area [ 12 + 1629.63 NAME, ADDRESS & SIGNATURE OF ARCHITECTS 2.31 3.08 1.35 2.76 15(b)(iii) 1.57 0.41 F.C. 1.95 space vision GIRDER BEAM BELOW 3.20 Total Built Up Area Proposed Including Fungible Compensatory Area [ 14 + 0.51 MT.W. CHAJJA 0.75 MT.W. CHAJJA 0.45 2.65 2.50 3.33 2.00 18 1589.08 0.75 MT.W. CHAJJA 0.63 0.75 MT.W. CHAJJA 3.80 2.15 2.38 1.60 3.80 16(b) (iii) ] BHAVIN Digitally signed by BHAVIN 9.45 FSI Consumed On Net Plot [ 14/4 ] 1.21 F.C. 2.00 2.00 4.55 19 Ar. Bhavin Modi ARVIND ARVIND MODI 4.55 1.72 II Other Requirements Ar. Madhura Bhavin Modi Date: 2023.05.18 1.57 2.60 4.57 3.00 5.73 BUILT UP AREA CALCULATION ( WING-A ) 0.20 Office: 1004,10th floor,B-Wing,Western Edge II, Behind Metro,Off.Western Express Highway, MODI 18:09:33 +05'30' 0.60 1ST & 2ND FLOOR A) Reservation / Designation Borivali (east), Mumbai-400 066. 1.56 A 13.65 X 22.76 X 1 NO = 310.67 SQ.MT. 1.35 a) Name Of Reservation S.S. DUCT DUCT 1.53 1.45 1.35 0.15 1.15 0.62 S.S. 4.32 TOTAL ADDITION = 310.67 SQ.MT. X b) Area Of Reservation Affecting The Plot BLDG.PROPOSAL FILE NO :- CHE/WSII/3615/R/C/337 (NEW) 4.98 1.20 1.82 1.15 0.95 DEDUCTIONS c) Area Of Reservation Land To Be Handed/Handed Over As Per Reg. No.17 NA 0.75 MT.W. CHAJJA 1.57 DRG.NO:- 01 JOB.NO:- 02 FILE NAME:- 0.75 MT.W. CHAJJA 1 1.35 X 1.41 X 1 NO = 1.90 SQ.MT. 3.57 2 3.20 X 2.31 X 1 NO = 7.39 SQ.MT. 3.05 3.20 d) Built Up Area Of Amenity To Be Handed Over As Per Reg. No.17 3.05 3.20 3 2.00 X 2.76 X 1 NO = 5.52 SQ.MT. RERA C.A.= 47.60 Sq.mt RERA C.A.= 39.89 Sq.mt 29.55 e) Area/Built Up Area Of Designation 4 4.80 X 0.81 X 1 NO = 3.89 SQ.MT. 1.97 NO:- New Ashwin Co.Op.Hgs.Ltd. 1.37 1 2 BUILT UP AREA DIAGRAM 1ST FLOOR ( WING-B ) 5 0.20 X 3.80 X 1 NO = 0.76 SQ.MT. 2.30 B) Plot Area/Built Up Amenity To Be Handed Over As Per Reg. No. 3.35 1.10 SCALE :- 1:100 6 1.15 X 1.35 X 1 NO = 1.55 SQ.MT. 1.10 (i) 14(A) W.R 17.30 7 2.30 X 3.20 X 1 NO = 7.36 SQ.MT. 5.65 A 5.65 A 8 5.65 X 1.10 X 1 NO = 6.22 SQ.MT. (ii) 14(B) NA 0.75 MT.W. CHAJJA ELE.CABLES BUILT UP AREA CALCULATION ( WING-B ) (iii) 15 0.75 MT.W. CHAJJA 1.50 2.50 1.50 9 2.35 X 2.10 X 1 NO = 4.94 SQ.MT. 4.65 4.35 22.76 1.50 10 6.80 X 4.65 X 1 NO = 31.62 SQ.MT. 22.76 4.65 3.25 3.40 C) Requirement Of Recreational Open Space In Layout/Plot As Per Reg. No. 27 11 0.80 X 1.50 X 1 NO = 1.20 SQ.MT. 3.10 3.40 12 2.25 X 0.85 X 1 NO = 1.91 SQ.MT. D) Tenement Statement 1.50 29.55 13 3.05 X 1.15 X 1 NO = 3.51 SQ.MT. 4.50 3.30 2.35 (i) Proposed Built Up Area ( 18 ) Above ) 1589.08 1.90 2.15 2.38 6.75 18.27 DEDUCTIONS 18 3.20 X 2.55 X 1 NO = 8.16 SQ.MT. 0.60 0.75 C1 (ii) Less Deduction Of Non- Residential Area ( Shop etc.) 265.61 1.37 3 2.35 0.50 DUCT DUCT DUCT 19 1.45 X 1.35 X 1 NO = 1.96 SQ.MT. COLUMN 0.08 5 C1 20 0.20 X 1.35 X 1 NO = 0.27 SQ.MT. COUNTED (iii) Area Available For Tenements [ (i) minus (ii) ] 1323.47 2.00 2.60 2.00 2.10 0.75 MT.W. CHAJJA COLUMN 0.75 MT.W. 3.10 IN F.S.I. 1.55 1.55 1.55 COUNTED IN CHAJJA F.S.I. 2.10 2.00 1.50 21 1.97 3.05 X X 1 NO = 6.01 SQ.MT. 3.05 (iv) Tenements Permissible ( Density Of Tenements/Hectare ) ( Maximum ) 59.56 nos. SUB ENGINEER 3.05 B 4 1.55 0.40 1.50 1.50 B 22 0.60 4.65 X X 1 NO = 2.79 SQ.MT. 2.35 (v) Total Number Of Tenements Proposed On The Plot 25.00 nos. 23 1.97 3.05 X X 1 NO = 6.01 SQ.MT. RERA C.A.=16.35 Sq.mt 4.05 RERA C.A.=22.80 Sq.mt STAIRCASE AREA CALCULATION 24 0.15 4.55 X X 1 NO = 0.68 SQ.MT. 1.97 1.50 E) Parking Statement 1.20 1.77 DUCT 1.50 0.80 Digitally signed by Amit Vijay Kale TOTAL DEDUCTION = 103.65 SQ.MT. Y1 Amit DN: c=IN, o=Personal, title=4683, 3.08 5.84 2.84 1.35 (i) Parking Required By Regulations For 15.00 nos. pseudonym=34F73056D1098CACA15F3FD 3.30 2.00 57DD2FFD086FDB224, 0.60 0.82 1.15 2.5.4.20=b9664fced2183a0d78949ad60390 TOTAL BUILT UP AREA [X - Y1] = 207.02 SQ.MT. X1 0.85 af30715a81c6ac24029d6510e2abc16de68d 1.35 S.S. DUCT 0.75 MT.W. CHAJJA Vijay Kale , postalCode=400708, st=Maharashtra, 1.15 1.20 x 0.85 1.45 0.20 Car serialNumber=5AFE8DBDC6260AACA0A2E CB76E081568C7064D8A0F7775A475FE987 5B6BCEA51, cn=Amit Vijay Kale 1.00 STAIRCASE AREA CALCULATION Date: 2023.05.29 13:54:09 +05'30' 3.05 2.25 0.20 2.15 2.38 Scooter/Motor Cycle 1ST & 2ND FLOOR ( STAIRCASE AREA COUNTED IN F.S.I. ) 3.25 9.45 2.45 3.67 1.58 2.66 1.50 1.50 2.00 LOBBY 1.50 ST1 4.50 X 4.35 X 1 NO = 19.58 SQ.MT. Outsiders ( Visitors ) ------ ASSISTANT ENGINEER 2.00 2.25 x 2.00 C2 (ii) Covered Garage Permissible C2 ELE.CABLES ST2 3.30 X 3.25 X 1 NO = 10.73 SQ.MT. ------ 3.35 2.60 2.33 COLUMN Swapnil Bhagawat Patil RERA C.A.=22.39 Sq.mt 2.25 ST3 2.35 X 3.40 X 1 NO = 7.99 SQ.MT. 1.50 COLUMN 4.65 (iii) Covered Garage Proposed ------ TOTAL STAIRCASE AREA PER FL. = 38.30 SQ.MT. Y2 1.02 0.75 MT.W. CHAJJA LOBBY LIFT COUNTED Car ------ 2023.05.30 19:00:32 COUNTED IN F.S.I. 1.35 x 1.35 x 1.35 x 1.35 x 4.82 1.95 1.15 x IN F.S.I. 4.60 1.00 1.00 1.00 1.00 1.50 x 1.66 1.88 x 1.43 NET BUILT UP AREA = 168.72 SQ.MT. 2.55 0.48 +05'30' 1.45 2.55 [X1 - Y2] Scooter/Motor Cycle ------ 1.35 ELE.CABLES ROOM-7 ROOM-6 ROOM-8 ROOM-5 ROOM-4 1.35 S.S. DUCT 2.56 x 2.80 2.56 x 2.80 2.56 x 2.80 2.43 x 2.80 2.13 x 2.80 3.20 6.80 0.30 x 1.35 W.C. W.C. W.C. W.C. W.C. ADD COLUMN AREA Outsiders ( Visitors ) STORE 1.50 1.50 1.20 x 1.20 x 1.50 1.20 x 1.20 x 1.50 1.50 1.45 1.20 1.45 2.20 3.20 3.05 1.50 1.45 1.79 1.79 1.65 1.65 1.65 1.65 3.18 x 1.35 C1 C2 0.75 0.48 X X 0.08 1.50 X X 1 NO 1 NO = = 0.06 SQ.MT. 0.72 SQ.MT. 13.65 (iv) Total Parking Provided 29.00 nos. EXECUTIVE ENGINEER DUCT DUCT DUCT BUILT UP AREA DIAGRAM 1ST & 2ND FLOOR ( WING A ) F) ------ HANUMANT 12.85 TOTAL COLUMN AREA = 0.78 SQ.MT. Transport Vehicles Parking Digitally signed by 29.55 TOTAL BUILT UP AREA 1ST & 2ND FLR. ( 168.72 + 0.78 ) = 169.50 SQ.MT. SCALE :- 1:100 (ii) Spaces For Transport Vehicles Parking Required By Regulations HANUMANT SADASHIVRAO 1ST FLOOR PLAN ( WING-'A' & 'B' ) ------ SADASHIVRAO BURE SCALE :- 1:100 (iii) Total No. Of Transport Vehicles Parking Spaces Provided ------ Date: 2023.06.09 18:58:53 BURE +05'30'