Form 1 ARCHITECT'S CERTIFICATE To, HEMA APARTMENTS CHS LTD, Plot No. 353 B/38, Bhavani Lane, Vallabh Baug Ext. Lane, Ghatkopar East, Mumbai -400 077. Sub: - Certificate of Percentage of Completion of Construction Work of HEMA APARTMENTS CHS LTD. having MahaRERA Registration Number P51800053101 being developed by M/S Hema Apartments CHS Ltd. till 30th September, 2024. I, Shri. Tejas Arun Chhadva have undertaken assignment as Architect /Licensed Surveyor of certifying Percentage of Completion of Construction Work of ”HEMA APARTMENTS CHS LTD” having MahaRERA Registration Number P51800053101 being developed by HEMA APARTMENTS CHS LTD. Based on Site Inspection, with respect to each of the Building/Wing of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Based on Site Inspection, with respect of the building of the aforesaid Real Estate Project, I certify that as on the date of this certificate. The Percentage of the work done of the building of the Real Estate Project as registered vide number P51800053101 under Maharera is as per table ‘A’ herein below. The percentage of the work executed with respect to each of the activity of the entire Phase is detailed in Table ‘B’ Table A Layout /Building/Wing Number Sr. No. Task/Activity Percentage of Actual Work Done (As on Date of Certificate) 1 Excavation 100% 2 Basement’s (If any) N.A. 3 Podiums (If any) N.A. 4 Plinth 100% 5 Stilt Floor 100% 6 Slabs of Super Structure 90% 7 Internal walls, Internal Plaster, Floorings, Doors and Windows 10% to each of the Flat/Premises 8 Sanitary Fittings within the Flat/Premises 20% 9 Staircases, Lifts Wells and Lobbies at each Floor Level 20% Overhead and Underground Water Tanks 10 External Plumbing and external plaster, elevation, completion 0% of terraces with waterproofing of the Building/Wing 11 Installation of lifts, water pumps, Fire Fighting Fittings and 0% Equipment as per CFO NOC, Electrical fittings, mechanical equipment, Compliance to conditions of environment/CRZ NOC, Finishing to entrance lobby/s, | plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specification in agreement of Sale. Any other Activities. Table B Internal & External Development Works in Respect of the entire Registered Phases Sr. No. Common area and Facilities Proposed Percentage of Actual Details (Yes/No) Work Done (As on date of the Certificate) 1 Internal Roads & Footpaths N 0% 2 Water Supply Y 0% 3 Sewarage (chamber, lines, Y 0% Septic Tank, STP) 4 Storm Water Drains Y 0% 5 Landscaping & Tree Y 0% planting 6 Street Lighting N 0% 7 Community Buildings N 0% 8 Treatment and disposal of N 0% Sewage and Sullage 9 Solid Waste management & N 0% Disposal 10 Water Conservation/Rain N 0% Water Harvesting 11 Energy management N 0% 12 Fire Protection and Fire Y 0% safety requirements 13 Electrical Meter room, Y 0% Substation, receiving station. 14 Others (Options to Add Y 0% more) Date: 10/10/2024 Place: Mumbai