Form 1 ( See Regulation 3 ) ARCHITECT CERTIFICATE Date :- 12.06.2026 To, M/s. Surbhi Construction CA. to owners J-102, Nisarg Heaven, Near MCA Club, Mahavir Nagar, Kandivali-West, Mumbai – 400 067. Subject :- Certificate of Percentage of Completion of Construction Work of Rijin Enclave ( Vishnu Bhuvan ) of the Phase the Project situated on the plot bearing C.T.S. No. 193 of Village Kanheri, Plot No. 41H, Demarcated by its boundaries Latitude and Longitude North - 19.228699, 72.8595159, 138a,35y, 192.59h, 45 and South - 19.228699, 72.8595159, 138a, 35y, 192.59h, 45t and West - 19.228699, 72.8595159, 138a,35y,192.59h,45t & 19.2275742, 72.8578302, 144a, 35y,90h,45 and Kasturba Villa to the North, and Ujwala Kutir to the South. Carter Road No. 2 to the East & Kit Kat Apartment to be West, Division - Konkan. Taluka - Borivali, District. Mumbai Suburban, State Maharashtra. PIN 400066. admeasuring 558.53 Sq. Mtr. area being developed by Surbhi Construction, CA to owners for Rijin Enclave ( Vishnu Bhuvan ) Reference :- Period :- 01.04.2024 to 30.06.2024 Sir, I Rupesh Chaudhary have undertaken assignment as Licensed Surveyor of certifying Percentage of Completion Work of the Rijin Enclave ( Vishnu Bhuvan ) Building of the Phase of the Project, situated on the plot being CTS No 193 of Village Kanheri, Plot No 41H, at Carter Cross Road No. 1, Borivali – East, Mumbai – 400 066 admeasuring 558.53 Sq. Mtr. area being developed by Surbhi Construction, CA to owners for Rijin Enclave ( Vishnu Bhuvan ) MAHARera No. P51800053088 1. Following technical professionals are appointed by Owner Promoter i. Shri Mehul Kanakia as Architect ii. Shri Rupesh Chaudhary as Licensed Surveyor iii. Shri Rupesh Chaudhary as Structural Consultant iv. Shri Chirag Rayani as Site Supervisor Contd…….2 1001, building no 5, garden grove complex, chikuwadi, Borivali west -2- Based on Site Inspection, with respect to each of the Building of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of Work done for each of the building of the Real Estate Project as registered vide number (to be registered ) under Maha RERA is as per table A herein below. The percentage of the work executed With respect to each of the activity of the phase is detailed In Table B TABLE – A One Building Sr. Takes / Activity Percentage of work done No. (1) (2) (3) Sr. No. Takes / Activity Percentage of work done 1. Excavation 100% 2. 1 number of Basement(s) and Plinth 100% 3. 0 number of Podiums 0% 4. Stilt Floor 100% 5. 9 number of Slabs of Super Structure 100% 6. Internal Walls, Internal Plaster. Floorings within Flats/Premises, 90% Doors and Windows to each of the Flats/Premises 7. Sanitary Fittings within the Flat / Premises, Electrical Fittings 75% within the Flat/Premises 8. Staircase, Lifts Wells and Lobbies at each Floor level connecting 95% Staircase and Lifts, Overhead and Underground Water Tanks 9. The external plumbing and external plaster, elevation, Completion 80% of terraces with waterproofing of the Building / Wing. 10. Installation of lifts, water pumps, Fire Fighting Fittings and 60% Equipment as per CFO NOC, Electrical fittings to Common Areas electro Mechanical equipment Compliance to conditions of environment / CRZ NOC Finishing to entrance lobby/s, plinth protection paving of areas appurtenant to Building Wing. Compound Wall and all other requirements as may be required to obtain Occupation Completion Certificate Contd…….3. 1001, building no 5, garden grove complex, chikuwadi, Borivali west -3- TABLE – B Internal and External Development Works in respect of the Registered Phase Sr. Common Area and Facilities Amenities Proposed Percentage of Details No. ( Yes No ) Work done (1) (2) (3) (4) 1 Internal Roads N.A. Nil 2 Water Supply Yes 50% 3 Sewerage (Chamber, Lines, Septic Tank, Yes 45% STP) 4 Strom Water Drains Yes 30% 5 Landscaping & Tree Planting Yes 0% 6 Street Lighting N.A. ---- 7 Community Buildings N.A. ---- 8 Treatment and Disposal of sewage and N.A. ---- sullage water 9 Solid waste Management & Disposal Yes 0% 10 Water Conversation, Rain Water Yes 0% harvesting 11 Energy Management N.A. ---- 12 Fire Protection and fire safety Yes Nil requirements 13 Electrical meter room, Substation Yes Nil Thanking You, Mehul Digitally by Mehul signed Jitendra Date: 2026.06.15 Jitendra Kanakia Kanakia 12:33:46 +05'30' Ar. Mehul J. Kanakia Architect (CA/2014/62291) Mitesh Digitally signed by Mitesh Bhikhubhai Shah DN: c=IN, o=Personal, postalCode=400092, Bhikhubhai st=Maharashtra, serialNumber=5e6045dbcfdc42a2aa4f7521 5a933fa482c1e2003b984faebd08fe507d09 Shah 3fab, cn=Mitesh Bhikhubhai Shah Date: 2026.06.15 12:54:14 +05'30' Signature of Promoter Name: M/s. Surbhi Construction. Date: 12.06.2026 1001, building no 5, garden grove complex, chikuwadi, Borivali west