FORM-1 ARCHITECT'S CERTIFICATE Date: 02 n d April 2024 To, Shri Dwarkesh D. Sheth Director of Kamla Hom es &Lifestyl es Pvt Ltd. C. A. To Boriv al i Lucky Apartment CHS Ltd, 101, M ayur Tower, Jn. Of Chandavarkar & Eksar Road, Boriv al i (W), M um bai-400092. Subject : Certificate of percentage of com pletion of Construction work of Development of “Kamla Borivali Lucky ” for Construction of ONE Buil ding of the SINGLE Phase hav ing Rera Registration Num ber P51800053037 situated on the Plot bearing CTS No. 1509 A of v illage Eksar Taluka Boriv al i, Boriv al i (W), M um bai-400103 dem arcated by its boundaries (l atitude and l ongitude of the end points) 19.24122,72.84608 to the North 19.24080,72.84584 to the South 19.24097,72.84612 to the East 19.24106,72.84580 to the West of Sav arkar Bldg, Boriv al i Taluka, M um bai Suburban District M umbai 400103. adm easuring about 2178.80 Sq. Mtrs. Area being dev eloped by Shri Dwarkesh D. Sheth Director of KAMLA H OMES & LIFESTYLES P VT. LTD. C.A. To Borivali Luck y Apartment CHS Ltd. Sir, I Ashok Gandhi of M/S. Ashok Gandhi consultants LLP have undertaken assignm ent as Licensed Architect of certifying Percentage of Com pletion of Construction Work of the Project “Kamla Borivali Lucky ” hav ing Rera Registration Num ber P51800053037 situated on the Plot bearing CTS No. 1509 A of v illage Eksar Tal uka Boriv al i, Boriv al i (W), M umbai-400103 dem arcated by its boundaries Shanti Niketan Bl dg to the North, Dev ki Ashish Bl dg to the South, Kal pana Chawla Road to the East, Road to the West, Sav arkar Bl dg, Boriv al i Tal uka, M umbai Suburban District M um bai 400103. adm easuring about 2178.80 Sq. Mtrs. Area being dev el oped by Shri Dwarkesh D. Sheth Director of KAMLA HOMES & LIFESTYLES PVT. LTD. C.A. To Borivali Lucky Apartment CHS Ltd. Foll owing technical professi onal s as inform ed are appointed by Owner/Prom oter: - i. Shri. Ash ok Gandhi of M /S. Ash ok Gandhi Consultants LLP. as Licensed Architect ii. Shri Abh ijit V. Phatarpekar of M/S. AVP Structural Consultants as Structural Consultant iii. ……..N. A……. M EP Consultant iv . Shri Bhav esh R. Parmar as Site Superv isor on site. 1 Based on Site Inspection, with respect to the Buil ding of the aforesaid Real Estate Project, I certify that as on the date 02 n d Ap ril 2024 of this certif icate, the percentage of work done for the buil d ing of the Real Estate Project to be registered v ide registration Number P51800053037 for “Kamla Borival i Lucky ” under M aha RERA is as per 'Table A' herein bel ow. The percentage of the work executed with respect to each of the activ ity of the entire phase is detailed in the 'Table B'. Table A Building – (Project / Building Name) Sr. Task/Activity Percentage of No. work done 1. Excav ation 100 % 2. ONE Num ber of Basem ent and Pl inth 0 % 3. ONE Num ber of Podium s 0 % 4. Ground Fl oor 0 % 5. 22 Num ber of Sl abs of Super structure 0 % incl uding terraces 6. Internal Walls, Internal Plaster, Fl ooring 0 % within Fl ats / Prem ises, Doors and Window to each of the Fl at / Prem ises 7. Sanitary Fitting within the Fl at/Prem ises, 0 % El ectrical Fitting within the Flat/ Prem ises 8. Staircase, Lifts Wells and Lobbies at each Fl oor lev el connecting staircases and Lifts, 0 % ov erhead and underground water tanks 9. The External Plum bing and external plaster, 0 % el evation, com pletion of terraces with water proofing of the Buil ding/wing, 10. Installation of Lifts, water pum ps, Fire 0% fighting fitting and Equipm ent as per CFO NOC, El ectrical fitting to comm on areas, el ectro, Mechanical Equipm ent, compl iance to conditions of env ironm ent /CRZ NOC, Fin ish ing to entrance Lob by/s Pl inth Protection, pav ing of areas appurtenant to Buil ding/Wing Com pound Wall and all other requirem ent as may be required to obtain Occupation/Com pletion certificate. Note: Percentage of w or k done stated is as per appr ove d I.O.D. plan date d 01/09/2023 2 TABLE – B Internal & External Develop ment work in respect of the entire Registered Phase Percent Propose S. Common areas and age of d Details No. Facilities, Amenities Work (Yes/No) done Internal Roads and 0% 1. NO Footpaths 2. Water Suppl y YES 0% FROM MCGM Sewerage 0% 3. (cham ber, l ines, YES septic Tank, STP) 4. Storm Water Drains YES 0% AS PER REM ARKS Landscaping and 0% 5. YES AS PER REM ARKS Tree Planting 6. Street Lighting NO 0% 7. Comm unity Buil dings NO 0% Treatment and 0% 8. disposal of sewage NO and sullage water Sol id Waste 0% 9. management & YES Disposal Water conserv ation, 0% 10. Rain water YES AS PER REM ARKS harv esting 11. Energy M anagement NO 0% Fire protect ion and 0% AS PER CFO 12. fire safety YES REM ARKS requirem ents El ectrical meter 0% 13. room , sub-station, YES receiv ing station Others (option to 0% 14. add m ore) Note: Percentage of w or k done stated is as per appr ove d I.O.D. plan date d 01/09/2023 Yours Sincerel y, ASHOK Digitally signed by ASHOK DATTATRAYA GANDHI DATTATRAYA Date: 2024.04.02 12:36:37 GANDHI +05'30' Digitally signed DWARKESH by DWARKESH ASHOK GANDHI DAMODAR DAMODAR CONSULTANT LLP SHETH SHETH Date: 2024.04.06 17:06:34 +05'30' 3