FORM-1 ARCHITECT'S CERTIFICATE Date: 01 s t January 2024 To, Shri Dwarkesh D. Sheth Director of Kamla Homes &Lifestyles Pvt Ltd. C.A. To Borivali Luc ky Apartment CHS L td, 101, Mayur T ower, Jn. Of Chandavarkar & Eksar Road, Borivali (W), Mumbai-400092. Subject : Certificate of percentage of completion of Co nstruction work of Development of “Kamla Borivali Lucky ” for Construction of ONE Building of the SINGLE Phase having Rera Registration Number P51800053037 situated on the Plot bearing CTS No. 1509A of village Eksar Taluka Borivali, Borivali (W), Mumbai -400103 demarcated by its boundaries (latitude an d longitude of the end points) 19.24122,72.8460 8 to the North 19.24080, 72.84584 to the South 19.24097,72.84612 to the East 19.24106,72.84580 to the West of Savarkar Bldg, Borivali Taluka , Mumbai Suburban District Mumbai 400103. admeasuring about 2178.80 Sq. Mtrs. Area being developed by Shri Dwarkesh D. Sheth Director of KAMLA H OMES & LI FESTYLES P VT. LTD. C.A. To Borivali Luck y Apartment CHS Ltd. Sir, I Ashok Gandhi of M/S. Ashok Gandhi consultants LLP have undertaken assignment as Licensed Architect of certifying Percentage of Completion of Construction Work of the Project “Kamla Borivali Lucky” having Rera Registration Number P51800053037 situated on the Plot bearing CTS No. 1509A of village Eksar Taluka Borivali, Borivali (W), Mumbai-400103 demarcated by its boundaries Shanti Niketan Bldg to the North, Devki As hish Bldg to the Sout h, Kalpana Chawla Road to the East, Road to the West, Sa varkar Bldg, Borivali Taluka , Mumbai Suburban District Mumbai 400 103. admeasuring about 2178.80 Sq. Mtrs. Area being developed by Shri Dwarkesh D. Sheth Director of KAMLA HOMES & LI FESTYLES PVT. LTD. C.A. To Borivali Lucky Apartment CHS Ltd. Following technical profe ssionals as informed are appointed by Owner/Promoter: - i. Shri. Ashok Gandhi of M/S. Ashok Gandhi Consultants LLP. as Licensed Architect ii. Shri Abhijit V. Phatarpekar of M/S. AVP Structural Consultants as Structural Consult ant iii. ……..N.A……. MEP Consultant iv. Shri Bhavesh R. Parmar as Site Supervisor on site. 1 Based on Site Inspection, with respect to the Building of the aforesaid Real Estate Project, I certify that as on the date 01 s t January 2024 of this certificate, the percentage of work do ne for the building of the Real Estate Project to be registered vide registration Number P51800053037 for “Kamla Borivali Lucky ” under Maha RERA is as per 'Table A' herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in the 'Table B'. Table A Building – (Project / Building Name) Sr. Task/Activity Percentage of No. work done 1. Excavation 50 % 2. ONE Number of Basement and Plinth 0 % 3. ONE Number of Podiums 0 % 4. Ground Floor 0 % 5. Number of Slabs of Super structure 0 % 6. Internal Walls, Internal Plaster, Flooring 0 % within Flats / Premises, Doors and Window to each of the Flat / Premises 7. Sanitary Fitting within the Flat/Premises, 0 % Electrical Fitting within the Flat/Premise s 8. Staircase, Lifts Wells and Lobbies at each Floor level connecting staircases and Lifts, 0 % overhead and underground water tanks 9. The External Plumbing and external plaster, 0 % elevation, completion of terrace s with water proofing of the Buildin g/wing, 10. Installation of Lifts, water pumps, Fire 0% fighting fitting and Equipment as per CFO NOC, Electrical fitting to common areas, electro, Mechanical Equipment, compliance to conditions of environment/CRZ NOC, Finishing to entrance Lobby/s Pl inth Protection, paving of areas appurtenant to Building/Wing Compound Wall and all other requirement as may be required to obtain Occupation/Completion certificate. Note: Percentage of work done stated is as per ap proved Amended plan dated 01/09/2023 2 TABLE – B Internal & External Develop ment work in respect of the entire Registered Phase Percent Propose S. Common areas and age of d Details No. Facilities, Amenities Work (Yes/No) done Internal Roads and 0% 1. NO Footpaths 2. Water Supply YES 0% FROM MCGM Sewerage 0% 3. (chamber, lines, YES septic Tank, STP) 4. Storm Water Drains YES 0% AS PER REMARKS Landscaping and 0% 5. YES AS PER REMARKS Tree Planting 6. Street Lighting NO 0% 7. Community Buildings NO 0% Treatment and 0% 8. disposal of sewage NO and sullage water Solid Waste 0% 9. management & YES Disposal Water conservation, 0% 10. Rain water YES AS PER REMARKS harvesting 11. Energy Management NO 0% Fire protection an d 0% AS PER CFO 12. fire safety YES REMARKS requirements Electrical meter 0% 13. room, sub-station, YES receiving station Others (option to 0% 14. add more) Note: Percentage of work done stated is as per ap proved Amended plan dated 01/09/2023 Yours Sincerely, ASHOK Digitally signed by ASHOK DATTATRAYA DATTATRAYA GANDHI Date: 2024.01.01 12:34:34 GANDHI +05'30' DWARKESH Digitally signed by DWARKESH ASHOK GANDHI DAMODAR DAMODAR SHETH CONSULTANT LLP SHETH Date: 2024.01.01 17:04:33 +05'30' 3