CLINT DOS SANTOS LICENSED SUPERVISOR Flat no. 303, Gorai Sumit CHSL, Plot No. 08, Gorai – I, Borivali West, Mumbai 40092. CONTACT @ 9821731295 EMAIL : clintdsantos@yahoo.com ____________________________________________________________________________________________________________________________________________________ ANNEXURE A FORM 2A [See Regulation 3A.] ENGINEER’S CERTIFICATE FOR QUALITY ASSURANCE (Site Supervisor’s Certificate) (To be submitted at end of the Financial Year 2025-2026) Date: 23-07-2026 To, NAMO SHREEN VENTURES LLP, Office No. 8, First Floor, Panchavati CHSL, S.V Road, Kandivali West, Mumbai-400067 Quality Assurance Certificate (Certificate No. …………………… for the year 2025-2026) Subject: Certificate for quality of materials used and quality of construction and workmanship for the work of BORIVALI SHANTI KRUPA CHSL having MahaRERA Registration Number P51800053007 being developed by NAMO SHREEN VENTURES LLP. Sir, I Clint Dos Santos have undertaken an assignment of supervision of this real estate project Our Responsibility To carry out the work in accordance with the development permission and as per the approved plan, to submit certificate of supervision of work, to carry out material testing in-situ or in an authorized laboratory as per prevailing and applicable standards, to ensure quality of work and workmanship as per prescribed specifications, and as per NBC and / or other relevant code of practice. The details of the quality are as follows: 1. Structural Design, Stability and Testing Sr. No. Parameters Yes/No Remarks 1 Whether soil investigations of the site has been Yes conducted before the structural design and soil parameters have been accounted for in the structural design/drawings? 2 Whether Structural Engineer has been appointed for Yes Name: Mr. Rupesh R. Chowdhary the project? STR: STR/C/40 Mobile: +91 22 40022685 / 6, Email : mail@unistepscpl.com 3 Whether the inspection registers, site order book and quality control test registers are maintained at the site properly and endorsed by the Engineer–in- Charge? Yes 4 Whether testing facilities to check quality of material is available at site? No External NABL Lab CLINT DOS SANTOS LICENSED SUPERVISOR Flat no. 303, Gorai Sumit CHSL, Plot No. 08, Gorai – I, Borivali West, Mumbai 40092. CONTACT @ 9821731295 EMAIL : clintdsantos@yahoo.com ____________________________________________________________________________________________________________________________________________________ Sr. No. Parameters Yes/No Remarks 5 Whether the statuary provisions for disaster Yes resistance/earthquake resistant design have been incorporated, specially in case of multi-storeyed construction? 6 Has suitable cognizance been taken on demarcated Yes flood lines and appropriate precautions taken for protecting the site from flooding considering local flooding issues? 2. Input Materials Sr. No. Parameters Yes/No Remarks 1 Whether the following building materials confirm to Yes relevant IS/BS/NBC Code, or as per Industry Standards? If yes, provide details: (a) Cement, concrete and coarse aggregate Yes (b) Steel and its alloys Yes (c) Electrical wire, fittings and accessories Yes (d) Plumbing and sanitary fittings Yes 2 Whether regular tests of materials and construction Yes products are being done from accredited labs also? If yes, details of such labs 3 Whether manufacturer test certificate for cement, Yes steel, pipes etc. have been obtained and whether supply records are being maintained? 4 Whether suitable water is being used for Yes construction? (i) What is the source of water? (Tanker Water) Yes (ii) Has water been tested and approved by Yes Engineer-in-Charge before construction? (iii) Has water been tested subsequently as per Yes requirement? 3. Quality of Workmanship Sr. No. Parameters Yes/No Remarks 1 Whether works of all the electrical Yes wiring/connections/lift installation/other electrical installations have been carried out under authorized/registered electrical engineer and whether records of the same has been maintained? 2 Whether all related works of plumbing & sanitary Yes including installation of water supply systems, drainage systems, sewage systems, sinks, toilets etc. have been carried out under authorized/registered plumbers/sanitary contractors and whether records of the same has been maintained? 3 Whether all the work is being carried out under Yes supervision of experienced and skilled professional? Further, whether the workmanship and quality is satisfactory and up to the mark and the work is within the acceptable and permissible limits of deviations as per relevant Code of Practice? CLINT DOS SANTOS LICENSED SUPERVISOR Flat no. 303, Gorai Sumit CHSL, Plot No. 08, Gorai – I, Borivali West, Mumbai 40092. CONTACT @ 9821731295 EMAIL : clintdsantos@yahoo.com ____________________________________________________________________________________________________________________________________________________ Sr. No. Parameters Yes/No Remarks 4 Whether remedial measures are undertaken to Yes prevent dampness and leakages? If yes, provide details 5 Whether safety precautions are undertaken during Yes construction activities for all type of workers? 4. Miscellaneous Sr. No. Parameters Yes/No No 1 Whether third party quality inspection is being No carried out on site during/after completion of the works? If yes, provide details. 2 Whether anti-termite treatment has been undertaken Yes for the soil? 3 Whether fire-fighting arrangements has been Yes undertaken under supervision of fire consultant? 4 Whether proper signages have been installed on Yes site/completed building as per requirement? 5 Whether precautions are undertaken to avoid air Yes pollution during construction? Please specify. 6 Whether records of all test reports/results have been Yes properly kept in the prescribed formats and whether the same are available at site for viewing by allottees and to be handed over to the association of allottees? 7 Whether all relevant records including sanctioned Yes building plans, utility drawings, various test reports/results have been properly kept in the prescribed formats to be handed over to the association of allottees? 8 Any innovative/cost effective/green technology has No been used for improving quality/energy efficiency? Please specify. Yours Faithfully, Signature of Engineer (Site Supervisor) Name: Clint Patrick Dos Santos Lic. No.:/SUP/Gradel:840002054 Existing BP No:C/124/SS I Agreed and accepted by Bhavik Dilip Digitally signed by Bhavik Dilip Mehta DN: c=IN, o=Personal, postalCode=400064, l=Mumbai Suburban, st=Maharashtra, street=FLAT NO 2404 DHRUV PARK ATT MALAD WEST, Mumbai, Maharashtra India- 400064- KANCHPADA, title=7863, 2.5.4.20=9446e10ae3947b106145e01bdd64ec8d52cc759157a9dd2213b Mehta 9686bf584a782, serialNumber=6b61ea3c1c6e9d95ed096f248e6a3676a5edab1ad5adfa8 4e636e7019110e930, email=namorealty@gmail.com, cn=Bhavik Dilip Mehta Date: 2026.07.24 16:57:00 +05'30' Signature of Promoter Name: M/s. NAMO SHREEN VENTURES LLP Date: