YINOD GAIKIVAD ARCHITECT & INTERIOR DESIGNER N4O4, David Villa, Near Rustamji School, Dr. Govindrao Dalvi Road, Dahisar (West), Mumbai - 4OO 068. Mob.: (+91) 9869074236 Email : v_lgaikwad@rediffmail.com Annexure A FORM 1 ARCHITECT' S CERTIFICATE Date: 0610,g12o.25 To, K V Buildhome LLP 322 Commerce House, 14O, N.M. Road, Fort, Mumbai-4OO O23. Sub: Certifrcate of Percentage of Completion of Construction Work of Proposed Residential Building'1', Development on plot bearing C.T.S. Nos. 1289(pt.), 129O(pt.), 1292(pt.), 1293(pt.), 1294(pt.l, 1295(pt.), 1296(pt.) & L297lpt.) in Village Mulund (East), Tal. Kurla, situated at 9O'-O" road, Mulund (E), Mumbai. Admeasuring25426.16 sq. mts. area being developed by K V Buildhome LLP. Sir, I Ar. Vinod Gaikwad have undertaken assignment as Architect of certi$ring Percentage of Completion of Construction Work of the Proposed Residential Development on plot bearing C.T.S. Nos. 1289(pt.), 129o(pt.l, 1292(pt.), 1293(pt.l, 1294{pt.), 1295(pt.), 1296(pt.) e l297lpt ) in Village Mulund (East), Tal. Kurla, situated at 9O'-O" Road, Mulund (E), Mumbai. Admeasuring 25426.16 sq. mts. area being developed by K V Buildhome LLP Following technical professionals are appointed by Owner / Promoter: - (i) M/S Sunil Ambre & Associates as architects. (ii) M/s. Jl[I Consultants LLP as Stnrctural Consultant (iii) M/s. Chettiar Consulting Engineers. as MEP Consultant (ivl Mr. Shri Ghanshyam M Sutar as Site Supenrisor Based on Site Inspection, with respect to each of the Building/Wing of the aforesaid Real Estate Project and the certificate issued by the Site Supervisor, I certifz that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project as registered vide number P518OOO5292L under Maha RERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. YINOD GAIKWAD ARCHITECT & INTERIOR DESIGNER N4O4, David Villa, Near Rustamji School, Dr. Govindrao Dalvi Road, Dahisar (West), Mumbai - 400 068. Mob.: (+91) 9869074236 Email : v_lgaikwad@rediffmail.com Table A For Wing C Sr. Tasks /Activtty Percentage of No. work done 1 Excavation. ( 1 7o) 100% 2 Plinth (Raft & Column upto plinth level) (9%). tooo/, J Upper Floor (R.C.C.XSO/50 slab = 17o each slab). 25 0h 2O Floors of Slabs of Super Structure (R.C.C.) 25 slab x 17o 4 Internal walls, Internal Plaster, Floorings within O"/o Flats/Fremises, Doors and Windows to each of the Flat/Premises. 5 Sanitary Fittings within the Flat/Premises, Electrical Fittings Oo/o within the Flat/Premises. 6 Staircases, Lifts Wells and Lobbies at each Floor level O"/o connecting Staircases and Lifts, Overhead and Underground Water Tanks. 7 The external plumbing and external plaster, elevation, o% completion of terraces with waterproofing of the Building/Wing. 8 Installation of lifts, water pumps, Fire Fighting Fittings and ooh Equipment as per CFO NOC, Electrica-l fittings to Common Areas,electro, mechanical equipment, Compliance to conditions of environment ICRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/ Wing, Compound. Wall and all other requirements as may be required to Obtain Occupation / Completion Certificate. I Overall Percentage of Completion of the Work Done for 35V" the Entire Building (Sakura C-wing| Note: RCC Work considered @7OYo & other works @3O"/" YINOD GAIK\ITAD ARCHITECT & INTERIOR DESIGNER N4o4' David Villa, Near Rustamji schoor, Dr. Govindrao Darvi Road, Dahisar (West), Mumbai - 4OO 068. Mob.: (+91) 9869074236 Email : v_lgaikwad@rediffmail.com TABLE-B For Wing C Internal & E:rternal Development Works in Respect of the entire Registered phase Sr Common areas and Proposed Percentage of Details Facilitles Amenitles (Yes/Nof Work done i Internal Roads & No Oo/o Foothpaths 2 Water Supply Yes o"h J. Sewerage (chamber, lines, Yes Oo/o Septic Tank, STP) 4. Storm Water Drains Yes OYo 5 Landscaping & Tree Yes Oo/o planting 6 Street Yes o"h 7 Communi No 8. Treatment and disposal of Yes Ot/. sewage and sullage water 9 Solid Waste Management & Yes 0'/o Disposal 10 Water conservation Yes Oo/o Rain water harvesting 11 Energz management Yes ooh 72 Fire protection and fire Yes OVo safety requirements 13. Electrical meter room, Yes Oo/o sub- station, receiving station l4 Others (Option to Add OYo more) Total Percentage of work done for Internal & Oo/" External Development Thanking you. Yours Faithfully, a \ Vinod Regd. No. CA/198216807