Annexure A FORM 1 [See regulation 3] ARCHITECT CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Accounts) Date:- 30.06.2024 To, Empire Realty, 201, Tanishka Commercial Premises, Akurli Road, W.E. Highway, Kandivali (E), Mumbai- 400101. Subject: Certificate of percentage of Completion of Construction Work of “EMPIRE STELLA’’ having MaharRera Registration Number P51800052926 (Only Applicable after project registration) Being developed by Empire Realty Sir, I Niten Dedhia have undertaken assignment as Architect of percentage of Completion of construction work of “EMPIRE STELLA’’ Having MahaRera Registration Number P51800052926 (Only Applicable after project registration, Being developed By M/s.Empire Realty Based On site Inspection, with respect to layout / each of the building/Wing of the aforesaid real estate project. I certify that as on the date of this certificate, the percentage of work done for each of the building/Wing of the Real estate project under MahaRera is as per Table A herein Below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. TABLE-A Layout/Building/Wing Number 01 (to be prepared separately for each Layout/Building/Wing of the project Sr no Task and activity Percentage of Actual Work Done (As on date of the Certificate) 1 Excavation 80% 2 Basement (if any) 0% 3 Podiums (if any) 0% 4 Plinth 50% 5 Stilt Floor 0% 6 10 No. of Slab of super Structure 60% 7 Internal walls, Internal plaster, floorings, Doors and windows 0% within Flats/Premises 8 Sanitary Fittings within the Flat/Premises 0% 9 Staircases, Lifts Wells and Lobbies at each Floor level 0% Overhead and underground water tanks. 10 External plumbing and external plaster, elevation, 0% completion of terraces with waterproofing of the Building/Wing, 11 Installation of lifts, water pumps, Fire Fighting Fittings and 0% Equipment as per CFO NOC, Electrical fittings mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of sale. Any other activities. TABLE B Common areas (internal and external road development works) in respect of the registered phase / project number Sr no Common areas and Facilities Proposed Percentage of Actual Details (YES/NO) Work Done 1 Internal Roads & Footpaths NO - 2 Water Supply YES 0% 3 Sewerage (Chamber, YES 0% lines, Septic tank, STP) 4 Storm Water Drains YES 0% 5 Landscaping & Tree Planting YES 0% 6 Street Lighting NA - 7 Community Buildings NO - 8 Treatment and disposal of sewage and YES 0% sullage water. 9 Solid Waste YES 0% management & Disposal 10 Water conservation / YES 0% Rain water harvesting 11 Energy management NO - 12 Fire protection and Fire Safety YES 0% Requirements 13 Electrical motor room, sub-station, YES 0% receiving station. 14 Others (Option to Add more) - - Yours Faithfully, Niten Digitally signed by Niten Premchand Premchand Dedhia Date: 2024.06.30 Dedhia 15:40:56 +05'30' NITEN.P.DEDHIA (Architect) (CA/2000/26033) Agreed and Accepted by, For EMPIRE REALTY, SAHIL M Digitally signed by SAHIL M VIRANI VIRANI Date: 2024.07.09 16:19:48 +05'30' Name: Sahil M. Virani Partner of M/s. Empire Realty Date: