FORM-2A [See Regulation 3A.] ENGINEERS'S CERTIFICATE FOR QUALITY ASSURANCE (Site Supervisor's Certificate) (To be submitted at the end of Financial Year) Date: 29/04/2025 To, The GAUTAM EKANATH THAKUR Ward GSouth, Mumbai City, 400025 Quality Assurance Certificate 03 (Certificate No. ......................for 2024-2025 the Year Ending .......................) Subject : Certificate for quality of materials used and quality of Construction and workmanship of the work of PARKWAY MANOR having MahaRERA Registration Number P51800052927 being developed by GAUTAM EKANATH THAKUR Sir, I/We Mr Sanjay Bari have undertaken an assignment of supervision of this real estate project ...................... Our Responsibility To carry out the work in accordance with the development permission and as per the approved plan, to submit certificate of supervision of work, to carry out material testing in-situ or in an authorized laboratory as per prevailing and applicable standards, to ensure quality of work and workmanship as per prescribed specifications, and as per NBC and / or other relevant code of practice. The details of the quality are as follows : 1. Structural Design, Stability and Testing Sr. No. Parameters Yes/No Remarks 1 Whether soil investigations of the site has been Yes Before structural design Geocon was conducted before the structural design and soil appointed whose Geo technical engineer parameters have been accounted for in the Mr. Jaydeep Wagh has given report to lay structural design/drawings? foundation at 4.0m below ground for a bearing capacity of 40t/cu.m. 2 Whether Structural Engineer has been appointed for Yes Name: K C Consultants the project? License No: STR/S/103 Mobile: 9869156555 E-mail: design@kcshahconsultants.com 3 Whether the inspection registers, site order book Yes Cube testing Inspection reports of and quality control test registers are maintained at materials has time to time obtained . the site properly and endorsed by the Engineer–in- Charge? 4 Whether testing facilities to check quality of material Yes Competent External Agencies are is available at site? available nearby. Page 1 of 3 Sr. No. Parameters Yes/No Remarks 5 Whether the statuary provisions for disaster Yes Earthquake resistant design has been resistance/earthquake resistant design have been incorporated the building is Stilt + 8 incorporated, specially in case of multi-storeyed Storey. construction? 6 Has suitable cognizance been taken on demarcated Yes Total plot level is reasonably raised flood lines and appropriate precautions taken for above road level. protecting the site from flooding considering local flooding issues? 2. Input Materials Sr. No. Parameters Yes/No Remarks 1 Whether the following building materials confirm to Yes All construction materials confirm to IS relevant IS/BS/NBC Code, or as per Industry code :456. Standards? If yes, provide details: (a) Cement, concrete and coarse aggregate Yes According to IS 456 Code (b) Steel and its alloys Yes IS Code confirming to IS: 1786:2008 RA & IS: 1608 Part 1:2022 (c) Electrical wire, fittings and accessories Yes IS 8130 ; IS 7098-1 : 1988 & IS 694 (d) Plumbing and sanitary fittings Yes Confirms to IS : 15778 2 Whether regular tests of materials and construction Yes 1) Structwel Designers & Consultants 2) products are being done from accredited labs also? UBMT Test House LLP If yes, details of such labs 3 Whether manufacturer test certificate for cement, Yes IS 694/ IS 7098-1 : 1988 & IS 8130. steel, pipes etc. have been obtained and whether supply records are being maintained? 4 Whether suitable water is being used for Yes Potable Water. construction? (i) What is the source of water? Yes Borewell Water. (ii) Has water been tested and approved by Yes Water test from Structwel Designers & Engineer-in-Charge before construction? Consultants. (iii) Has water been tested subsequently as per Yes Potable Water tested by Structwel requirement? Designers. 3. Quality of Workmanship Sr. No. Parameters Yes/No Remarks 1 Whether works of all the electrical Yes Mr. Anil Kawale an Registered electrical wiring/connections/lift installation/other electrical engineer. installations have been carried out under authorized/registered electrical engineer and whether records of the same has been maintained? 2 Whether all related works of plumbing & sanitary Yes Mr Hemant M Madhani a License plumber including installation of water supply systems, by BMC L.P.No. 1451. drainage systems, sewage systems, sinks, toilets etc. have been carried out under authorized/registered plumbers/sanitary contractors and whether records of the same has been maintained? 3 Whether all the work is being carried out under Yes Mr Sanjay Bari as License Supervisor supervision of experienced and skilled professional? from BMC L.P.no. Further, whether the workmanship and quality is Sup/Grade/I:840008420. satisfactory and up to the mark and the work is within the acceptable and permissible limits of deviations as per relevant Code of Practice? Page 2 of 3