;rF f,lllrA'FrT?1,]il AFrCHITECTS * ENgINFEFIS c)fl,, ll?,Shrcr X,rl{rao Compbr, Opp, Notionol Pstl t\ oh Gsrr, Nr. SnlonCrvar tlo*dir, Wc$,rrn Erpral Hlghu,o/, lorivoll lQ, rltfi|bsi ' J00 066 ?rl.: Oilil - 119!l3l!a l C.ll : ?lll0lt{697 l9te7o494la I Cnoll: perivnrtnragiaacrrQlardl.to6 Annexure A FORM 1 [See regulation 3] ARCHITECT CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Accounts) Date:- 3L.12.2023 To, Empire Realty, 201, Tanishka Commercia I Premises, Akurli Road, W.E. Highway, Kandivali(E), Mumbai- 400101. Subject: Certificate of percentage of Completion of Construction Work of "EMPIRE STELLA' having MaharRera Registration Number P51800052925 (Only Applicable after project registration) Being developed by Emoire Realw Sir, I Niten Dedhia have undertaken assignment as Architect of percentage of Completion of construction work of "EMPIRE STELLA" Having MahaRera Registration Number P51800052926 (Only Applicable after project registration, Being developed By M/s.Emoire Realw Based On site Inspection, with respect to layout / each of the building/Wing of the aforesaid realestate project. I certify that as on the date of this certificate, the percentage of work done for each of the building/Wing of the Real estate project under MahaRera is as per Table A herein Below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. TABLE-A Layout/Building/Wing Number 01 (to be prepared separately for each Layout/Building/Wing of the project Sr no Task and activity Percentage of Actual Work Done (As on date of the Certificate) L Excavation 80% 2 Basement (if any) Oo/o 3 Podiums (if any) o% 4 Plinth Oo/o 5 Stilt Floor o% 6 Slab of super Structure o% 7 Internalwalls, Internal plaster, floorings, Doors and windows o% within Flats/Premises 8 Sanitary Fittings within the Flat/Premises o% 9 Staircases, Lifts Wells and Lobbies at each Floor level Oo/o Overhead and underground water tanks. 10 External plumbing and external plaster, elevation, Oo/o completion of terraces with waterproofing of the Buildine/Wine, 11 lnstallation of lifts, water pumps, Fire Fighting Fittings and Oo/o Equipment as per CFO NOC, Electrical fittings mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of sale. Any other activities. TABLE B Common areas (internal and external road development works) in respect of the registered phase / project number Sr no Common areas and Facilities Proposed Percentage of Actual Details (YES/NO) Work Done 1 Internal Roads & Footpaths NO 2 Water Supply YES OYo 3 Sewerage (Chamber, YES Oo/o lines, Septic tank, STP) 4 Storm Water Drains YES o% 5 Landscapinq & Tree Plantine YES o% 6 Street Liehtine NA 7 Community Buildings NO 8 Treatment and disposal of sewage and YES OYo sullage water. 9 Solid Waste YES o% management & Disposal 10 Water conservation / YES o% Rain water harvestine 11 Energv management NO L2 Fire protection and Fire Safety YES o% Requirements 13 Electrical motor room, sub-station, YES o% receiving station. !4 Others (Option to Add more) Yours Faithfully, Niten Dlsltailyignedby Premchand Dedhia oate:2023.1231 Ug0nla 123s:33 +os'30' NITEN.P.DEDHIA (Architect) (cAl2ooo/26033) Agreed and Accepted by, Partner Name: Sahil M. Virani Partner of M/s. Empire Realty Date: