Amber V Natekar G.D.Arch.,Cert. in PG ( Dipl.)Val.,A.I.I.A. Regd Architect & Project Consultants A- 101, First Floor Zee Usha Apts. Veerchand Seth Chowk Mahant Road, Vile Parle ( East ) Mumbai - 400 057. Tel. 022 3574 9529 Mob. 98201 33760 Email : avn@archavnatekar.in / avnarchitects@gmail.com Ref. : NSB-PM / Form-1-VI / IV / 25 Date : 17 / 04 / 2025 [Annexure-A] FORM 1 ( UT ) ARCHITECT’S CERTIFICATE Mr. Gautam E. Thakur, Of, M/s NSB Properties, C.A. to Plot Owners, B-7 & B-8 Bageshree Co-op. Housing Society Ltd., Shankar Ghanekar Marg, Prabhadevi, Mumbai -400025 Subject : Certificate of Percentage of Completion of Construction Work of ONE ( 01 ) no. of Building comprising of ONE (01) Wings, of the Single Phase of the Project [ MahaRERA Registration Number:: P51800052927] known as “ PARKWAY MANOR”, situated on the plot bearing CTS No. 1225 of Village Vile Parle-East also bearing F.P.No 292, TPS-II Vile Parle, located on Chitrakar Ketkar Marg, Vile Parle ( East ) , Mumbai-57, demarcated by its boundaries (latitude and longitude of the end points) (19 05 53.15N 72 51 4.42E, 19 05 54.28N 72 51 4.60E, 19 05 53.12N 72 51 4.93E, 19 05 54.20N 72 51 5.11E ) by Existing 9.15 mts ( 30 feet ) wide Playground X Road no.1 ( Known as Chitrakar Ketkar Marg ) to the North , Plot bearing F.P. no 291 of T.P.S. no II Vileparle ( 1st variation Final ) also bearing CTS no 1224 to the East , Plot bearing F.P. no 293 of T.P.S. no II Vileparle ( 1st variation Final ) also bearing CTS no 1226 to the West , and by Existing Public Playground known as Waman Dubhashi Maidan to the South ; of village Vile Parle- East Taluka- Andheri Mumbai Suburban District, Pin Code 400 057, admeasuring 493.31 sq.mts. is being developed by Mr. GAUTAM E THAKUR , Proprietor of M/s. NSB PROPERTIES. Sir, I, MR. AMBER VASANT NATEKAR, Regd. Architect, have undertaken assignment as Architect of certifying Percentage of Completion of Construction Work of the one ( 01 ) NO Building comprising of ONE ( 01 ) Wing, of the Single Phase of the Project [MahaRERA Registration Number:: P51800052927 ] situated on the plot bearing CTS No. 1225 of Village Vile Parle-East also bearing F.P.No 292, TPS-II Vile Parle, located on Chitrakar Ketkar Marg, Vile Parle ( East ) , Mumbai-57, admeasuring 493.31 sq.mts, being by Mr. GAUTAM E THAKUR , Proprietor of M/s. NSB PROPERTIES. Following technical professionals are appointed by Owner / Promoter:–– (i) M/s./Shri. AMBER VASANT NATEKAR as Architect. (ii) M/s/Shri. KAIVANT C. SHAH of m/s. K.C Shah Consultants as Structural Consultant. (iii) M/s /Shri. SANJAY S. BARI as Site Supervisor. Based on Site Inspection, with respect to each of the Building / Wing of the aforesaid Real Estate Project, I certify that as on 31/03/2025, the Percentage of Work done for each of the building / Wing of the Real Estate Project as registered vide number P51800052927 under MahaRERA is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. TABLE-A (One no. Single Building with 01 Wing) Percentage of Work Sr. Tasks / Activity Done ( % ) No. ( As on 31/03/2025) (1) (2) (3) 1 Excavation 90 2 PIT (for Car Parking) and Plinth 100 3 Podium 0 4 Stilt Floor 85 NINE ( 09 ) number of Slabs of Super Structure ( Including 5 100 Refuge areas ) 6 Internal Walls, Internal Plaster, Floorings within Flats/ Premises, 65 Doors and Windows to each of the Flat/Premises Sanitary Fittings within the Flat/Premises, Electrical Fittings within 7 the Flat/Premises. 30 Staircases, Lifts Wells and Lobbies at each Floor level 8 connecting Staircases and Lifts, Overhead and Underground 80 Water Tanks. The external plumbing and external plaster, Ele va t ion , 9 c om pl e t i on of t e rr aces with waterproofing of the Building/ 30 Wing Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common 10 Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth 35 protection, paving of areas appurtenant to Building/ Wing Compound Wall and all other requirements as may be required. TABLE-B Common Areas (Internal and External Development Works) in respect of the entire Registered Phase. (Common features for the One no Single Building with 01 Wing) S.No Common areas and Proposed Percentage facilities, Amenities of Actual (Yes / Work Done Details No) (As on 31/03/2025) 1 2 3 4 (%) 5 1. Internal Roads & Foot- Yes 0 Compound Concrete with finishing paths. Open Compound Paver tiles proposed to be Concrete and Paving. installed. 2. Water Supply Yes 0 As per MCGM rules/regulations. 3. Sewerage (chamber, Yes 35 Laying of Internal Drainage lines, lines, Septic Tank, STP) Manholes etc as per MCGM rules/ regulations. 4. Storm Water Drains Yes 0 Storm water Drains to be provided. 5. Landscaping & Tree Yes 0 Existing retained trees and Newly Planting. planted trees as per Supt. Of Gardens remarks to be maintained. 6. Street Lighting Yes 0 Open Compound and compound gate / wall lighting with light installations to be fitted. 7. Community Buildings Yes 25 Common area viz. Society Office, Fitness Center, Servant Toilet, Entrance lobbies, Elec. Meter rooms etc. to be constructed as per provision in plans . 8. Treatment and No 0 Sewage and Sullage discharge of Disposal of sewage the building to be constructed and and sullage water connected to Municipal Sewage & Drainage lines. 9. Solid waste Yes 50 Demolition and Excavated Debris Management & to be disposed as per Online Disposal Debris NOC at designated sites. 10 Water Conservation, Yes 0 Borewell to be executed on Site as Rain Water Harvesting per the Rain water Harvesting consultants remarks and guidelines. 11 Energy Management Yes 0 Electric wiring for common compound Electric installations with LED light fixtures to be installed. 12 Fire Protection and Yes 0 Fire Fighting equipments viz. Down Fire safety comers, Wet risers etc. to be requirements installed as per CFO NOC. 13 Electrical Meter room, Yes 30 Space for electric Meters and, Sub station, receiving Work of cabling to and from electric station meter cabinet and related work of ducts/ trenches etc to be constructed and installed. No Electrical Substation required as per Electrical service providers remarks. Others : 14 a. Car Parking Yes 10 Car parking system to be installed. Systems b. Passenger Lifts Yes 10 Two passenger Lifts to be installed. Yours Faithfully, Amber Vasant Digitally signed by Amber Vasant Natekar DN: c=IN, o=Personal, title=7966, pseudonym=035C2A69A424B7AA152389E0829B28DF212B800A, 2.5.4.20=30adeaa1db870e46b769e12ed9b468a6baa22588d7fe9 Natekar 76fd29852674225d370, postalCode=400057, st=Maharashtra, serialNumber=67A0DA5B1A9D28E6247EE314883364495E11D17 ED2E7AE9CF5CCD16499FCB61F, cn=Amber Vasant Natekar Date: 2025.04.28 18:36:37 +05'30' AMBER VASANT NATEKAR Registered Architect. Agreed and Accepted by: C.O.A. Regn No. : CA /94 / 17139 GAUTAM Digitally signed by GAUTAM EKANATH THAKUR DN: c=IN, o=Personal, postalCode=400025, l=Mumbai, st=Maharashtra, street=B/7BAGESHREE SOCIETYGHANEKAR MARGPRABHADEVI MUMBAI EKANATH MAHARASHTRA 400025, 2.5.4.20=39d14cc1beaa85e2490f2123f58c49927abf 2cc79b99c0cd86bc2e2b48b7868e, serialNumber=e6a2cad1c2bc75043c90d1e70c0717a ea400efc0300b4194b3c7e90b2f49c9c3, THAKUR email=nsbproperties@yahoo.com, cn=GAUTAM EKANATH THAKUR Date: 2025.04.30 19:08:23 +05'30' NAME : Mr. Gautam E. Thakur, Of, M/s NSB Properties, C.A. to Plot Owners, DATE :