C-3 BRIHANMUMBAI MUNICIPAL CORPORATION FORM 'A' MAHARASHTRA REGIONAL AND TOWN PLANNING ACT, 1966 No CHE/ES/2027/T/337(NEW)/FCC/4/Amend COMMENCEMENT CERTIFICATE To, K V BUILDHOME LLP 322, 3rd Floor, 140 N.M. Road, K.M Vardhan Chowk, Fort, Kala Ghoda, Mumbai. Sir, With reference to your application No. CHE/ES/2027/T/337(NEW)/FCC/4/Amend Dated. 24 Nov 2015 for Development Permission and grant of Commencement Certificate under Section 44 & 69 of the Maharashtra Regional and Town Planning Act, 1966, to carry out development and building permission under Section 346 no 337 (New) dated 24 Nov 2015 of the Mumbai Municipal Corporation Act 1888 to erect a building in Building development work of on plot No. no C.T.S. No. 1289,1290,1292 to 1297 Division / Village / Town Planning Scheme No. MULUND-E situated at no Road / Street in T Ward Ward . The Commencement Certificate / Building Permit is granted on the following conditions:-- 1. The land vacated on consequence of the endorsement of the setback line/ road widening line shall form part of the public street. 2. That no new building or part thereof shall be occupied or allowed to be occupied or used or permitted to be used by any person until occupancy permission has been granted. 3. The Commencement Certificate/Development permission shall remain valid for one year commencing from the date of its issue. 4. This permission does not entitle you to develop land which does not vest in you. 5. This Commencement Certificate is renewable every year but such extended period shall be in no case exceed three years provided further that such lapse shall not bar any subsequent application for fresh permission under section 44 of the Maharashtra Regional and Town Planning Act, 1966. 6. This Certificate is liable to be revoked by the Municipal Commissioner for Greater Mumbai if :- a. The Development work in respect of which permission is granted under this certificate is not carried out or the use thereof is not in accordance with the sanctioned plans. b. Any of the conditions subject to which the same is granted or any of the restrictions imposed by the Municipal Commissioner for Greater Mumbai is contravened or not complied with. c. The Municipal Commissioner of Greater Mumbai is satisfied that the same is obtained by the applicant through fraud or misrepresentation and the applicant and every person deriving title through or under him in such an event shall be deemed to have carried out the development work in contravention of Section 43 or 45 of the Maharashtra Regional and Town Planning Act, 1966. 7. The conditions of this certificate shall be binding not only on the applicant but on his heirs, executors, assignees, administrators and successors and every person deriving title through or under him. The Municipal Commissioner has appointed Shri. Executive Engineer (BP) ES II Assistant Engineer to exercise his powers and functions of the Planning Authority under Section 45 of the said Act. This CC is valid upto 19/3/2024 Issue On : 20 Mar 2023 Valid Upto : 19 Mar 2024 Application Number : CHE/ES/2027/T/337(NEW)/CC/1/New Remark : C.C. for shore plies only as per fresh IOD Dt. 07.02.2023. Approved By Executive Engineer (BP) ES II Executive Engineer Issue On : 05 Sep 2023 Valid Upto : 04 Sep 2024 Application Number : CHE/ES/2027/T/337(NEW)/CC/1/Amend Remark : Commencement Certificate up to plinth for commercial portion and CC upto stilt slab for Residential wings including IH tenement building as per approved IOD plan dated 07.02.2023 (CC valid upto 19 March 2024) Approved By Executive Engineer (BP) ES II Executive Engineer Issue On : 08 Feb 2024 Valid Upto : 07 Feb 2025 Application Number : CHE/ES/2027/T/337(NEW)/FCC/1/New Remark : C.C. is re – endorsed upto stilt slab for Proposed Commercial cum Residential building No.1 and building No. 2 for IH Tenements as per approved amended plan dated 12.01.2024. subject to timely renewal of B.G, SWM NOC, Workmen’s compensation policy and taking all sorts of precautions during construction and for air pollution. Approved By AE BP S&T ward Assistant Engineer (BP) CHE/ES/2027/T/337(NEW)/FCC/4/Amend Page 2 of 5 On 17-Sep-2025 Issue On : 04 Mar 2024 Valid Upto : 03 Mar 2025 Application Number : CHE/ES/2027/T/337(NEW)/FCC/1/Amend Remark : Further CC is granted for Wing C upto 20th upper floor and Wing D upto 23rd upper floors as per approved amended plan dated 12.01.2024''excluding 24th to 35th upper floors for wing D (restricted for non-handing over of D.P. Roads & availing instalment facility) CC for podium is proposed within building line only for both wings i.e. wing ‘C’ and ‘D’, subject to timely renewal of B.G, SWM NOC, Workmen’s compensation policy and taking all sorts of precautions during construction and for air pollution. Approved By AE BP S&T ward Assistant Engineer (BP) Issue On : 15 Jan 2025 Valid Upto : 14 Jan 2026 Application Number : CHE/ES/2027/T/337(NEW)/CC/2/Amend Remark : Discretionary approval to plinth CC, as plinth CC was already issued on 05.09.2023. (CC Valid upto 19.03.2025) Approved By Executive Engineer (BP) ES II Executive Engineer Issue On : 24 Jan 2025 Valid Upto : 23 Jan 2026 Application Number : CHE/ES/2027/T/337(NEW)/FCC/2/Amend Remark : Further C.C. is granted for wing 'D' upto 32nd upper floors, in continuation with earlier C. C. i.e. upto 20th upper floors for wing ‘C’ and CC for podium for both wings within building line only i.e. wing ‘C’ and ‘D’ as per approved amended plans dated 12.01.2024 by restricting C.C. of 33rd to 35th upper floors for wing D for non-handing over of DP roads and set back area subject to timely renewal of B.G, SWM NOC, Workmen’s compensation policy and taking all sorts of precautions during construction and for air pollution. Approved By AE BP S&T ward Assistant Engineer (BP) CHE/ES/2027/T/337(NEW)/FCC/4/Amend Page 3 of 5 On 17-Sep-2025 Assistant Engineer (BP) Issue On : 24 Feb 2025 Valid Upto : 23 Feb 2026 Application Number : CHE/ES/2027/T/337(NEW)/FCC/3/Amend Remark : Further CC for Wing C upto 36th upper floors and Wing D upto 41st upper floors is granted as per approved amended plan dated 05.02.2025, by restricting shopping and 37th to 41st upper floors of wing C for non-handing over of D.P. Roads & availing instalment facility subject to timely renewal of B.G., SWM NOC, Workmen’s compensation policy and taking all sorts of precautions during construction along with precautionary measures for air pollution. Approved By Asst Engineer BP ( S&T ward) Assistant Engineer (BP) Issue On : 17 Sep 2025 Valid Upto : 19 Mar 2026 Application Number : CHE/ES/2027/T/337(NEW)/FCC/4/Amend Remark : Further C.C. for Wing C from 37th to 41st upper floors in continuation to earlier C.C. i.e. Wing C upto 36th upper floors and Wing D upto 41st upper floors including OHWT and Lift machine room for both the wings as per approved amended plans dtd 05.02.2 025 by restricting shopping for instalment facility and handing over of balance DP Road, subject to timely renewal of B.G, SWM NOC, Workmen’s compensation policy and taking all sorts of precautions during construction and for air pollution. CHE/ES/2027/T/337(NEW)/FCC/4/Amend Page 4 of 5 On 17-Sep-2025 Digitally signed by SHRUTI VINOD NARVEKAR Date: 17 Sep 2025 19:17:20 Organization :Brihanmumbai Municipal Corporation Designation :Assistant Engineer (BP) Authority_Sign For and on behalf of Local Authority Brihanmumbai Municipal Corporation Cc to : Assistant Engineer . Building Proposal 1. Architect. 2. Collector Mumbai Suburban /Mumbai District. Eastern Suburb T Ward Ward CHE/ES/2027/T/337(NEW)/FCC/4/Amend Page 5 of 5 On 17-Sep-2025