FORM -1 ARCHITECT'S CERTIFICATE Date : 13/08/2024 To, Shri Saahil B. Aidasani, Partners of M/S. Faucett Developers C.A to Ideal Manohar CHS Ltd. Shop No. 3, Rajdeep CHS, 1st Carter Road, Borivali (E), Mumbai-66. Subject: Certificate of percentage of compl etion of Constructi on w ork of Devel opment of Project “IDEAL MANOHAR CHS LTD ” for Construction of ONE Buil ding of the SI NGLE Phase having RER A Registration Number P51800052920 situated on the Land bearing CTS No. 685, demarcated by its boundaries (l atitude and l ongitude of the end points ) 19 . 062 17 , 72 .8 332 2 to the North / 19. 06206, 72. 83327 to the Eas t / 19. 06 19 3 , 72. 83 32 1 to the So uth / 19.06205, 72.83317 to the W est of F.P.No.1 52 , T PS Bandra No. III , 30 t h Road , Bandra (W est), Mumbai - 40005 0. admeasuring about 618. 70 Sq. Meters Area being devel oped by M/S FAUCETT DEVELOPERS . Sir, I Ashok Gandhi of M/S. Ash ok Gandhi Consultant LLP have un dertaken assignment as Licensed Architect for certifying Percentage of Compl etion of Construction W ork of the Project “IDEAL MANOHAR CHS LTD ” situa ted on the Land bearing CT S No. 685 demarcated by its boundaries (l atitude and l ongitude of the end points) 19 .0 621 7 , 7 2.8 33 22 to the North / 19.06206, 72. 83 32 7 to the East / 1 9.0 61 93 , 72. 83 32 1 to the South / 1 9. 06205, 72. 83317 to th e W est of F.P.No.1 52 , T PS Bandra No. I I I , 30 t h Road , Ba ndra (W est), Mum bai - 4000 50 admeasuring about 618. 70 Sq. Mts. Area being devel oped by M/S FAUCETT DEVELOPERS. Foll ow ing technical professional s as informed are appointed by Ow ner/Promoter: - i. Shri. Ashok Gandhi of M/S. Asho k Gandhi Consul tants LLP as an Architec t. ii. Shri. Girish T. Wadhw a Consul tants and Engineers LLP as Structural Consul tant iii. ECO MEP Consul tants as MEP Consul tant iv. Shri. Mangesh S. Deorukh kar as Site S upervisor on site. Based on Site I nspection, w ith respect to the buil ding of the af oresaid Real Estate Project, I certify that as on 13-08-2024 of this certificate, the percentage of w ork done for the buil ding of the Real Est ate Project to be registered vide registration Number P51800052920 appl ied for as “ IDEAL MANOHAR CHS LTD ” under M AHA R ER A is as per 'T abl e A' herein bel ow . The percentage of the w ork executed w ith respect to each of the activity of the entire phase is detail ed in the 'T abl e B'. Table A Project / Build ing Name – “IDEAL MANOHAR CHS LTD ” Sr. Task/Activi ty Percentage No. of work done 1. Excavation 10 0 % 2. One Number of Basement and Pl inth 100% 3. Number of Podiums NI L 4. Stil t Fl oor 100% 5. 12 Number of Sl abs of Super stru cture incl uding terrace 58% sl ab 6. Internal W all s, Internal Pl aster, Flooring w ithin Flats / 0 % Premises, Doors and W indow to each of the Fl at / Premises 7. Sanitary Fitting w ithin the Fl at/Premises, El ectrical 0 % Fitting w ithin the Fl at/Premises 8. Staircase, Li fts W ell s and Lobbies at each Fl oor l evel connecting staircases and Lifts , overhead and 0 % underground w ater tanks 9. The External Pl umbing and external plaster, el evation, 0 % completion of terraces w ith w ater proofing of the buil ding/w ing, 10. Installation of Lifts , w ater pumps, Fire fighting 0% fitting and Equipment as per CFO NOC, El ectrical fitting to common areas, el ectro, Mechanical Equipment, compl iance to conditions of environment/CRZ NOC, finishing to entrance Lobby/s Pl inth Protection, paving of areas appurtenant to Buil ding/W ing Compound W all and all other requirement as may be required to obtain Occupation/Completion certificate. Note: Percen tag e o f work d one stated is a s p er approve d Amen d Plan Dated: 29/06/2024 TABLE – B Internal & External Developmen t work in resp ect of the en tire Re gistered Phase Percentag Sr. Common areas an d Proposed e of Work Details No. Facili tie s, Ameni ties (Yes/No) done Internal Roads and 0% 1. NO Footpaths 2. Water Suppl y Y ES 0% FROM MCGM Sew erage 0% 3. (Chamber , l ines, septic Y ES Tank, STP) 0% AS PER 4. Storm W ater Drains Y ES REM AR KS Landscaping and Tree 0% AS PER 5. Y ES Planting REM AR KS 6. Street Ligh ting NO 0% 7. Community Buil dings NO 0% Treatment and disposal of 0% 8. NO sew age and sull age w ater Sol id W aste management 0% 9. Y ES & Disposal Water conservation, Rain 0% AS PER 10. Y ES w ater harvesting REM AR KS 11. Energy Management NO 0% Fire protection and fire 0% AS PER CFO 12. Y ES safety requirements REM AR KS El ectrical meter room, 0% 13. sub -s tation , receiving Y ES station Others (option to add 0% 14. more) Note: Percentage of work don e s tated is a s p er approve d Amend Pl an Dated: 2 9/06/2024 Y ours faithfully, ASHOK Digitally signed by ASHOK DATTATRAYA DATTATRAYA GANDHI Date: 2024.08.13 12:00:59 GANDHI +05'30' ASHOK GANDHI CONSULTANT LLP SAAHIL B Digitally signed by SAAHIL B AIDASANI AIDASANI Date: 2024.10.24 13:22:20 +05'30' FORM-1 ARCHITECT'S CERTIFICATE Date: 09/10/2024 To, Shri Saahil B. Aidasani, Partners of M/S. Faucett Developers C.A to Ideal Manohar CHS Ltd. Shop No. 3, Rajdeep CHS, 1st Carter Road, Borivali (E), Mumbai-66. Subject: Certificate of percentage of completion of Construction work of Development of Project “IDEAL MANOHAR CHS LTD ” for Construction of ONE Building of the SINGLE Phase having RERA Registration Numb er P51800052920 situated on the Land bearing CTS No. 685, demarcated by its boundaries (latitude and longitude of the end points) 19.06217, 72.83322 to the North / 19.06206, 72.83327 to the East / 19.06193, 72.83321 to the South / 19.06205, 72.83317 to the West of F.P.No.152, TPS Bandra No. III , 30 t h Road, Bandra (West), Mumbai - 400050. admeasuring about 618.70 Sq . Meters Area being developed by M/S FAUCETT DEVELOPERS. Sir, I Ashok Gandhi of M/S. Ashok Gandhi Consultant LLP have undertaken assignment as Li censed Architect for certifying Percentage of Completion of Construction Work of the Project “IDEAL MANOHAR CHS LTD” situated on the Land bearing CTS No. 685 demarcated by its boundaries (latitude and longi tude of the end points) 19.06217, 72.83322 to the North / 19.06206, 72.83327 to the East / 19.06193, 72.83321 to the South / 19.06205, 72.83317 to the West of F.P.No.152, TPS Bandra No. III , 30 t h Road, Ba ndra (Wes t), Mumbai - 400050 admeasuring about 618.70 Sq. Mts. Area being developed by M/S FAUCETT DEVELOPERS. Following technical professionals as informed are appointed by Owner/Promoter: - i. Shri. Ashok Gandhi of M/S. Ashok Gandhi Consultants LLP as an Architec t. ii. Shri. Girish T. Wadhwa Consultants and Engineers LLP as Structural Consultant iii. ECO MEP Consultant s as MEP Consultant iv. Shri. Mangesh S. Deorukhkar as Si te Supervisor on site. Based on Site I nspection, with respect to the building of the aforesaid Real Estate Project, I certify that as on 09-10-2024 of this c ertificate, the percentage of work done for the building of the Real Est ate Project to be registered vide r egistration Number P51800052920 applied for as “IDEAL MANOHAR CHS LTD ” under MAHA RERA is as per 'Table A' herein below. The percentage of the work executed with respect to each of the activity of the entir e phase is detailed in the 'Table B'. Table A Project / Building Name – “IDEAL MANOHAR CHS LTD ” Sr. Task/Activity Percentage No. of work done 1. Excavation 100 % 2. One Number of Bas ement and Plinth 100% 3. Number of Podiums NI L 4. Stilt Floor 100% 5. 12 Number of Slabs of Super structure i ncluding terrace 83% slab 6. Internal Walls, I nternal Plaster, Flooring within Flats / 0 % Premises, Doors and Window to each of the Flat / Premises 7. Sanitary Fitting within the Flat/Premises, Electrical 0 % Fitting wi thin the Flat/Premises 8. Staircase, Lifts Wells and Lobbies at each Floor level connecting staircases and Lifts, overhead and 0 % underground water tanks 9. The Exter nal Plumbing and external pl aster, elevation, 0 % completion of terraces with water proofing of the building/wing, 10. Installation of Lifts, water pumps, Fire fighting 0% fitting and Equipment as per CFO NOC, Electrical fitting to common areas , electro, Mechanical Equipment, compliance to conditions of environment/CRZ NOC, finishing to entrance Lobby/s Plinth Protection, paving of areas appurtenant to Building/Wing Compound Wall and all other requirement as may be required to obtain Occupation/Completion certificate. Note: Percentage of work done stated is as per approved Amend Plan Dated: 29/06/2024 TABLE – B Internal & External Development work in respect of the entire Registered Phase Percentag Sr. Common a reas and Proposed e of Work Details No. Facilities, Amenities (Yes/No) done Internal Roads and 0% 1. NO Footpaths 2. Water Supply YES 0% FROM MCGM Sewerage 0% 3. (Chamber, lines, septic YES Tank, STP) 0% AS PER 4. Storm Water Drains YES REMARKS Landscaping and Tree 0% AS PER 5. YES Planting REMARKS 6. Street Lighting NO 0% 7. Community Buildings NO 0% Treatment and disp osal of 0% 8. NO sewage and sullage water Solid Waste management 0% 9. YES & Disposal Water conservation, Rain 0% AS PER 10. YES water harvesting REMARKS 11. Energy Management NO 0% Fire protection and fire 0% AS PER CFO 12. YES safety requirements REMARKS Electrical meter room, 0% 13. sub-station, receiving YES station Others (option to add 0% 14. more) Note: Percentage of work done stated is as per approved Amend Plan Dated: 29/06/2024 Yours faithfully, ASHOK Digitally signed by ASHOK DATTATRAYA DATTATRAY GANDHI Date: 2024.10.09 A GANDHI 15:38:40 +05'30' ASHOK GANDHI CONSULTANT LLP SAAHIL B Digitally signed by SAAHIL B AIDASANI AIDASANI Date: 2024.10.24 13:25:50 +05'30' FORM-1 ARCHITECT'S CERTIFICATE Date: 17/10/2024 To, Shri Saahil B. Aidasani, Partners of M/S. Faucett Developers C.A to Ideal Manohar CHS Ltd. Shop No. 3, Rajdeep CHS, 1st Carter Road, Borivali (E), Mumbai-66. Subject: Certificate of percentage of completion of Construction work of Development of Project “IDEAL MANOHAR CHS LTD ” for Construction of ONE Building of the SINGLE Phase having RERA Registration Numb er P51800052920 situated on the Land bearing CTS No. 685, demarcated by its boundaries (latitude and longitude of the end points) 19.06217, 72.83322 to the North / 19.06206, 72.83327 to the East / 19.06193, 72.83321 to the South / 19.06205, 72.83317 to the West of F.P.No.152, TPS Bandra No. III , 30 t h Road, Bandra (West), Mumbai - 400050. admeasuring about 618.70 Sq . Meters Area being developed by M/S FAUCETT DEVELOPERS. Sir, I Ashok Gandhi of M/S. Ashok Gandhi Consultant LLP have undertaken assignment as Li censed Architect for certifying Percentage of Completion of Construction Work of the Project “IDEAL MANOHAR CHS LTD” situated on the Land bearing CTS No. 685 demarcated by its boundaries (latitude and longi tude of the end points) 19.06217, 72.83322 to the North / 19.06206, 72.83327 to the East / 19.06193, 72.83321 to the South / 19.06205, 72.83317 to the West of F.P.No.152, TPS Bandra No. III , 30 t h Road, Ba ndra (Wes t), Mumbai - 400050 admeasuring about 618.70 Sq. Mts. Area being developed by M/S FAUCETT DEVELOPERS. Following technical professionals as informed are appointed by Owner/Promoter: - i. Shri. Ashok Gandhi of M/S. Ashok Gandhi Consultants LLP as an Architec t. ii. Shri. Girish T. Wadhwa Consultants and Engineers LLP as Structural Consultant iii. ECO MEP Consultant s as MEP Consultant iv. Shri. Mangesh S. Deorukhkar as Si te Supervisor on site. Based on Site I nspection, with respect to the building of the aforesaid Real Estate Project, I certify that as on 17-10-2024 of this c ertificate, the percentage of work done for the building of the Real Est ate Project to be registered vide r egistration Number P51800052920 applied for as “IDEAL MANOHAR CHS LTD ” under MAHA RERA is as per 'Table A' herein below. The percentage of the work executed with respect to each of the activity of the entir e phase is detailed in the 'Table B'. Table A Project / Building Name – “IDEAL MANOHAR CHS LTD ” Sr. Task/Activity Percentage No. of work done 1. Excavation 100 % 2. One Number of Bas ement and Plinth 100% 3. Number of Podiums NI L 4. Stilt Floor 100% 5. 12 Number of Slabs of Super structure i ncluding terrace 91% slab 6. Internal Walls, I nternal Plaster, Flooring within Flats / 0 % Premises, Doors and Window to each of the Flat / Premises 7. Sanitary Fitting within the Flat/Premises, Electrical 0 % Fitting wi thin the Flat/Premises 8. Staircase, Lifts Wells and Lobbies at each Floor level connecting staircases and Lifts, overhead and 0 % underground water tanks 9. The Exter nal Plumbing and external pl aster, elevation, 0 % completion of terraces with water proofing of the building/wing, 10. Installation of Lifts, water pumps, Fire fighting 0% fitting and Equipment as per CFO NOC, Electrical fitting to common areas , electro, Mechanical Equipment, compliance to conditions of environment/CRZ NOC, finishing to entrance Lobby/s Plinth Protection, paving of areas appurtenant to Building/Wing Compound Wall and all other requirement as may be required to obtain Occupation/Completion certificate. Note: Percentage of work done stated is as per approved Amend Plan Dated: 29/06/2024 TABLE – B Internal & External Development work in respect of the entire Registered Phase Percentag Sr. Common a reas and Proposed e of Work Details No. Facilities, Amenities (Yes/No) done Internal Roads and 0% 1. NO Footpaths 2. Water Supply YES 0% FROM MCGM Sewerage 0% 3. (Chamber, lines, septic YES Tank, STP) 0% AS PER 4. Storm Water Drains YES REMARKS Landscaping and Tree 0% AS PER 5. YES Planting REMARKS 6. Street Lighting NO 0% 7. Community Buildings NO 0% Treatment and disp osal of 0% 8. NO sewage and sullage water Solid Waste management 0% 9. YES & Disposal Water conservation, Rain 0% AS PER 10. YES water harvesting REMARKS 11. Energy Management NO 0% Fire protection and fire 0% AS PER CFO 12. YES safety requirements REMARKS Electrical meter room, 0% 13. sub-station, receiving YES station Others (option to add 0% 14. more) Note: Percentage of work done stated is as per approved Amend Plan Dated: 29/06/2024 Yours faithfully, ASHOK Digitally signed by ASHOK DATTATRAYA GANDHI DATTATRAYA Date: 2024.10.17 15:44:31 GANDHI +05'30' ASHOK GANDHI CONSULTANT LLP SAAHIL B Digitally signed by SAAHIL B AIDASANI AIDASANI Date: 2024.10.24 13:27:26 +05'30' Date: 13/08/2024 COMPLETION CERTIFICATE TO WHOM SO EVER IT MAY CONCERN REF: P-14055/2022/(152)/H/W Ward/FP/IOD/1/New SUB: Proposed Redevelopment of existing building Known as Ideal Manohar CHSL” on Plot bearing CTS NO 685, FP No 152 Bandra TPS III, 3oth Road, Bandra (West), H/W ward, Mumbai. For Shri Saahil B. Aidasani, Partners of M/S. Faucett Developers This is to certify that the construction work up to the Seventh Floor Slab level, has been completed of the Building on plot bearing CTS NO 685, FP No 152 Bandra TPS III, 30th Road, Bandra (West), H/W ward, Mumbai. In accordance with permission No. P- 14055/2022/(152)/H/W Ward / FP /IOD/1/New under my supervision and in accordance with the sanctioned plan. ASHOK Digitally signed by ASHOK DATTATRAYA GANDHI DATTATRAYA Date: 2024.08.13 11:59:30 GANDHI +05'30' ASHOK GANDHI CONSULTANTS LLP Digitally signed SAAHIL B by SAAHIL B AIDASANI AIDASANI Date: 2024.10.24 13:20:51 +05'30' Date: 16/09/2024 COMPLETION CERTIFICATE TO WHOM SO EVER IT MAY CONCERN REF: P-14055/2022/(152)/H/W Ward/FP/IOD/1/New SUB: Proposed Redevelopment of existing building Known as Ideal Manohar CHSL” on Plot bearing CTS NO 685, FP No 152 Bandra TPS III, 3oth Road, Bandra (West), H/W ward, Mumbai. For Shri Saahil B. Aidasani, Partners of M/S. Faucett Developers This is to certify that the construction work up to the Eighth & Nineth Floor Slab level, has been completed of the Building on plot bearing CTS NO 685, FP No 152 Bandra TPS III, 30th Road, Bandra (West), H/W ward, Mumbai. In accordance with permission No. P- 14055/2022/(152)/H/W Ward / FP /IOD/1/New under my supervision and in accordance with the sanctioned plan. ASHOK Digitally signed by ASHOK DATTATRAYA DATTATRAYA GANDHI Date: 2024.09.16 GANDHI 11:30:03 +05'30' ASHOK GANDHI CONSULTANTS LLP SAAHIL B Digitally signed by SAAHIL B AIDASA AIDASANI Date: 2024.10.24 NI 13:23:51 +05'30' Date: 09/10/2024 COMPLETION CERTIFICATE TO WHOM SO EVER IT MAY CONCERN REF: P-14055/2022/ (152)/H/W Ward/FP/IOD/1/New SUB: Proposed Redevelopment of existing building Known as Ideal Manohar CHSL” on Plot bearing CTS NO 685, FP No 152 Bandra TPS III, 3oth Road, Bandra (West), H/W ward, Mumbai. For Shri Saahil B. Aidasani, Partners of M/S. Faucett Developers This is to certify that the construction work up to the Tenth Floor Slab level, has been completed of the Building on plot bearing CTS NO 685, FP No 152 Bandra TPS III, 30th Road, Bandra (West), H/W ward, Mumbai. In accordance with permission No. P- 14055/2022/(152)/H/W Ward / FP /IOD/1/New under my supervision and in accordance with the sanctioned plan. ASHOK Digitally signed by ASHOK DATTATRAYA GANDHI DATTATRAYA Date: 2024.10.09 15:37:25 GANDHI +05'30' ASHOK GANDHI CONSULTANTS LLP SAAHIL B Digitally signed by SAAHIL B AIDASAN AIDASANI Date: 2024.10.24 I 13:24:54 +05'30' Date: 17/10/2024 COMPLETION CERTIFICATE TO WHOM SO EVER IT MAY CONCERN REF: P-14055/2022/ (152)/H/W Ward/FP/IOD/1/New SUB: Proposed Redevelopment of existing building Known as Ideal Manohar CHSL” on Plot bearing CTS NO 685, FP No 152 Bandra TPS III, 3oth Road, Bandra (West), H/W ward, Mumbai. For Shri Saahil B. Aidasani, Partners of M/S. Faucett Developers This is to certify that the construction work up to the Eleventh Slab level, has been completed of the Building on plot bearing CTS NO 685, FP No 152 Bandra TPS III, 30th Road, Bandra (West), H/W ward, Mumbai. In accordance with permission No. P- 14055/2022/(152)/H/W Ward / FP /IOD/1/New under my supervision and in accordance with the sanctioned plan. ASHOK Digitally signed by ASHOK DATTATRAYA GANDHI DATTATRAYA Date: 2024.10.17 15:45:16 GANDHI +05'30' ASHOK GANDHI CONSULTANTS LLP SAAHIL B Digitally signed by SAAHIL B AIDASA AIDASANI Date: 2024.10.24 NI 13:26:35 +05'30'