September 14, 2023 To, The Maharashtra Real Estate Regulatory Authority, 6th & 7th Floor, Housefin Bhavan, Plot No. C - 21, E - Block, Bandra Kurla Complex, Bandra (E), Mumbai - 400051. Subject: Explanation about query raised with respect to difference in plot number on Commencement certificate and application Respected Sir, The plot number as per Commencement Certificate dated 24/08/2023 is plot No. 152 C.T.S. No. 685, F.P. No.152 and whereas as per application, information fetched from MCGM AutoDCR portal is plot number 152. Please note that plot number 152 and CTS number 685 are one and the same. We are attaching herewith the copy of Town Planning Scheme Remarks of TPS BANDRA No. III. Redistribution and Valuation Statement annexed to the same confirms this fact that plot number 152 and CTS number 685 are one and the same. Yours Faithfully, For FAUCETT DEVELOPERS AUTHORISED SIGNATORY MUNICIPAL CORPORATION OF GREATER MUMBAI Office of the, Chief Engineer, (Development Plan)/Executive Engineer, (Town Planning) 5th floor, Municipal Head Office, Extn. Bldg., Mahapalika Marg, Fort,Mumbai: 400 001. To, Ashok dattatraya Gandhi 1.Saikrupa Apt. L.T. Road, Borivali(W), Mumbai Reference: Your application dated 14.07.2022 Subject: Town Planning Scheme Remarks of TPS BANDRA No. III(1st Variation)(Final) for F.P.No. 152 Sir, Town Planning Remarks in respect of the above Final Plot shown bounded bold red on the accompanying plan are as under: 1) Name of Town Planning Scheme: TPS BANDRA No. III(1st Variation)(Final) 2) Date of Effect: 04.02.1985 3) F.P. No.: 152 4) Area of F.P. : 618.7 sq. mts.(Six hundred Eighteen decimal Seven sq. mts.) 5) Name of the owner(s): 1) Murli Motiram Mansukhani,2) Manohar M. Mansukhani,3) Sou. Hiru B. Mansukhani,4) Kum. Sushila M. Mansukhani.(as shown in the accompanying Form I) 6) User: Residential 7) Contribution charges of Rs. 1650 (One thousand Six hundred Fifty) only to be paid in the concerned local ward office along with interest from the date of effect. 8) Final Plot boundaries shall be demarcated through concerned City Survey Officer. 9) Specific remarks about T.P. Building Regulations, if any, will be informed to E.E.B.P. on receipt of proposal from their office. 10) These remarks are offered from T.P. point of view without reference to site conditions and shall not be used for scrutiny of Building proposals. 11) These remarks are valid for one year from the date of issue. No. ChE/DP/TPRF202207111403438/TPS/14.07.2022 Acc: Plan, Form-I, TP Remarks for FP Note: This is electronically generated report. Hence personal signature is not required. This report should be read accompanying Form-I & T.P. Plan. Town Planning Department. 96B 182 246 99 104A 104D 15TH ROAD 175 183 95 14TH ROAD 100 103 40 Feet 109 26 T H R O A 245 D 163 TO 40 Feet 174 172-483-484 184 94 101 102 40 F e e t 110 173 186 185 244 30 T H R O A D 30TH ROAD 40 F e e t TPS BANDRA 69-70 No. III 30 Feet 71 72 75 73 WA TE R 74 151 152 FIELD ROA 153 155 D 24 T H R O A 154 D 82 60 F e e t 76 213 40 F e e t FIRST VAR IATION 81 80 156 79 78 77 N 150 IO 162 AT 161 ARI 160 159 S TV 158 212 FIR 157 29 T H R O A D FIRST VARIATION 40 F e e t 211 23RD ROAD 216 53 59 60 61 126A 25TH 40 Feet N 126B TIO 127A 127B ROAD 210 RIA 140 141 142 T VA 122 TO FIR S 125-128 40 Feet 217 54A 58-62-63 TO 130 209 217A 139-143 TO 146 Scale Land Bearing F.P.No(s) 152 of TPS BANDRA No. III TPS Scheme in H/W Ward. This Plan is to read with Form-I & TP Remark letter u/no ± 1:1200 CHE/TPRF202207111403438/DP/WS/H/W. This is an electronically generated document. Hence, No signature required. Assistant Engineer (Town Planning) Dated: 14/07/2022 Legend MUNICIPAL CORPORATION OF GREATER MUMBAI TPS shop line as per 1st variation final Office of the Chief Engineer (Development Plan), TPS shop line as per principal scheme 5th Floor, Annexe Building, TPS Roadwidening (Town Planning Department) Municipal Head Office, Mahapalika Marg, Fort, MUMBAI - 400 001. TPS Boundary Final Plot Boundary TPS Roads TPS Nallas FORM I See Rules 6(v) and 21 ( I ) TOWN PLANNING SCHEME BANDRA No. III (1st VARIATION)(FINAL)Redistribution and Valuation Statement Form -1(WARD H/W) Redistribution & Valuation Statement ORIGINAL PLOT FINAL PLOT Net Values in Rupees Values in Rupees Addition Demand Undeveloped Developed Contribu- to (+)or from (+) City Survey Number *Rate without Inclusive *Rate without Inclusive tion (+) Increment deduc- or by (-) Tenure of land Compens Contri- tion from owner *Rate of original value of semi- referenc of of final reference of [Column Serial No. final e to structure plot to value of structure ation(-) bution 50 (-) being the Number Number 10(b) addition Name of owner without Area in value value of value structures [Column Percent Contributi Remarks Area in Sq.mts. minus reference Inclusive of Sq.mts. structure 9(c) of column on to be of column column 11,13,14 to value of structure s minus 12 made 9(b)] structures column under 6(c )] other sections 1 2 3(a) 3(b) 4 5 6(a) 6(b) 6(c) 7 8 9(a) 9(b) 9(c) 10(a) 10(b) 10(c) 11 12 13 14 15 16 Rs. Rs. Rs. Rs. Rs. Rs. Rs. Rs. Rs. Rs. Rs. Rs. Rs. Rs. 133. (a) 1) Murli Motiram Mansukhani. 685 152 618.7 16.15 9990 9990 152 618.7 16.15 9990 9990 21.48 13290 13290 - 3300 1650 - +1650 2) Manohar M. Mansukhani. 3) Sou. Hiru B. Mansukhani. 4) Kum. Sushila M. Mansukhani. (Area in words : F. P. No.152 : Six hundred Eighteen Point Seven sq.mts. Only) * Note : (a) Original Value means the value of the original plot without reference to any improvements contemplated in the Scheme (Clause (f) of sub-section (I) of section 97) (b) Semi-Final Value means the value of the final plot without reference to any improvements contemplated in the Scheme other than improvements due to alteration of its boundaries i.e. value of the final plots as a results of improvements in its sharpe (Clause (f) of sub-section (I) of section 97) (c) Final Value means the value of the final plot with reference to improvements contemplated in the scheme on the assumption that the scheme has been completed (section 98) . This is electronically generated report. This Form-I is to read with accompanying T.P. Plan and Remark letter ChE/TP/TPRF202207111403438/TPS/14.07.2022