FORM-1 ARCHITECT'S CERTIFICATE Date: 27/01/2024 To, Shri Saahil B. Aidasani, Partners of M/S. Faucett Developers C.A to Ideal Manohar CHS Ltd. Shop No. 3, Rajdeep CHS, 1st Carter Road, Borivali (E), Mumbai-66. Subject: Certificate of percentage of completion of Construction work of Development of Project “IDEAL MANOHAR CHS LTD ” for Construction of ONE Building of the SINGLE Phase having RERA Registration Numb er P51800052920 situated on the Land bearing CTS No. 685, demarcated by its boundaries (latitude and longitude of the end points) 19.06217, 72.83322 to the North / 19.06206, 72.83327 to the East / 19.06193, 72.83321 to the South / 19.06205, 72.83317 to the West of F.P.No.152, TPS Bandra No. III , 30 t h Road, Bandra (West), Mumbai - 400050. admeasuring about 618.70 Sq . Meters Area being developed by M/S FAUCETT DEVELOPERS. Sir, I Ashok Gandhi of M/S. Ashok Gandhi Consultant LLP have undertaken assignment as Li censed Architect for certifying Percentage of Completion of Construction Work of the Project “IDEAL MANOHAR CHS LTD” situated on the Land bearing CTS No. 685 demarcated by its boundaries (latitude and longi tude of the end points) 19.06217, 72.83322 to the North / 19.06206, 72.83327 to the East / 19.06193, 72.83321 to the South / 19.06205, 72.83317 to the West of F.P.No.152, TPS Bandra No. III , 30 t h Road, Ba ndra (Wes t), Mumbai - 400050 admeasuring about 618.70 Sq. Mts. Area being developed by M/S FAUCETT DEVELOPERS. Following technical professionals as informed are appointed by Owner/Promoter: - i. Shri. Ashok Gandhi of M/S. Ashok Gandhi Consultants LLP as an Architec t. ii. Shri. Girish T. Wadhwa Consultants and Engineers LLP as Structural Consultant iii. ECO MEP Consultant s as MEP Consultant iv. Shri. Mangesh S. Deorukhkar as Si te Supervisor on site. Based on Site I nspection, with respect to the building of the aforesaid Real Estate Project, I certify that as on 27-01-2024 of this c ertificate, the percentage of work done for the building of the Real Est ate Project to be registered vide r egistration Number P51800052920 applied for as “IDEAL MANOHAR CHS LTD ” under MAHA RERA is as per 'Table A' herein below. The percentage of the work executed with respect to each of the activity of the entir e phase is detailed in the 'Table B'. Table A Project / Building Name – “IDEAL MANOHAR CHS LTD ” Sr. Task/Activity Percentage No. of work done 1. Excavation 100 % 2. One Number of Bas ement and Plinth 30% 3. Number of Podiums NI L 4. Stilt Floor 0% 5. 12 Number of Slabs of Super structure i ncluding terrace 0% slab 6. Internal Walls, I nternal Plaster, Flooring within Flats / 0 % Premises, Doors and Window to each of the Flat / Premises 7. Sanitary Fitting within the Flat/Premises, Electrical 0 % Fitting wi thin the Flat/Premises 8. Staircase, Lifts Wells and Lobbies at each Floor level connecting staircases and Lifts, overhead and 0 % underground water tanks 9. The Exter nal Plumbing and external pl aster, elevation, 0 % completion of terraces with water proofing of the building/wing, 10. Installation of Lifts, water pumps, Fire fighting 0% fitting and Equipment as per CFO NOC, Electrical fitting to common areas , electro, Mechanical Equipment, compliance to conditions of environment/CRZ NOC, finishing to entrance Lobby/s Plinth Protection, paving of areas appurtenant to Building/Wing Compound Wall and all other requirement as may be required to obtain Occupation/Completion certificate. Note: Percentage of work done stated is as per approved IOD Plan Dated: 21/03/2023 TABLE – B Internal & External Development work in respect of the entire Registered Phase Percentag Sr. Common a reas and Proposed e of Work Details No. Facilities, Amenities (Yes/No) done Internal Roads and 0% 1. NO Footpaths 2. Water Supply YES 0% FROM MCGM Sewerage 0% 3. (Chamber, lines, septic YES Tank, STP) 0% AS PER 4. Storm Water Drains YES REMARKS Landscaping and Tree 0% AS PER 5. YES Planting REMARKS 6. Street Lighting NO 0% 7. Community Buildings NO 0% Treatment and disp osal of 0% 8. NO sewage and sullage water Solid Waste management 0% 9. YES & Disposal Water conservation, Rain 0% AS PER 10. YES water harvesting REMARKS 11. Energy Management NO 0% Fire protection and fire 0% AS PER CFO 12. YES safety requirements REMARKS Electrical meter room, 0% 13. sub-station, receiving YES station Others (option to add 0% 14. more) Note: Percentage of work done stated is as per approved IOD Plan Dated: 21/03/2023 Yours faithfully, ASHOK Digitally signed by ASHOK DATTATRAYA GANDHI DATTATRAYA Date: 2024.01.27 12:13:21 GANDHI +05'30' For, ASHOK GANDHI CONSULTANT LLP SAAHIL B Digitally signed by SAAHIL B AIDASANI AIDASANI Date: 2024.01.29 10:06:29 +05'30'