G M AR,CH PITT. LTI). /A ARCH]IECTURE & EI{GI]IEERII{G SERVICES, I'{IERIOR DESIGNERS PRO.,ECI MAJ{AGEMEilT COilSULIAT{T5, APPROVED VALUERS, CEBI]FIED ARBITRATOR GSnN ilor 27AAECG5764Dtzo / CI O; t 4520otlH20o0PIC12E579 FORM 1 lSee Regulation 3| ARCHITECT"S CERTIFICATE Date:- 31d Decetnber, 2024 I\,{s. Infinity Narayani Associates t13, Sunvilla, Yashodham, Gen. A.K.VADYA Marg Goregaon (East), Mumbai40fi)53. Subr Certificate of Percentage of Completion of Coruhuction work of Gateway Residence having MahaRERA Registration Number: P518fin529U {Only Applicable After Proiect Register being developed by the I\tlls. Infinity Narayani Associates. Dear Sir, We M/s. G. M. Arch PvL Ltd. have undertaken assignment as Architect o{ certifying Percentage of Compbtion of Construction Work of Gateway Residence having MahaRERA Registration Number: P518{Xn52907 {Only Applicable After Project Register being developed by the lWs. Infinitv Naravani Associates, 1. Following technical professionals are appointed by Owner / Promoter:- (i) M/s. G. lvl Arch Pvt. Ltd. as Architect/Ltensed Surveyor. (ii) fay Shree Krishna as Structural Consultant (iii) Shd Kishor Velani as Site Engineer. Based on Site Inspectiory with respect to layout of the Building of the aforesaid Real Estate Proiect, I certify that as on the date of this certificate, the Percentage of work done for the Building of the real Estate Project as registered vide number P518qn5290, under RERA is as per table A herin below. The percentage of the work execuEd with respect to each if the major activity of the Building and Overall percentage of work (lone with nespect to Building is detailed in the in the Table B. Add: 3, llercury CHS, Opp Hall ltlart Business Plaza, Bandn (E), ilumbaL{}0051. ofl: +91 22 5E212E76 Cell.: +9't 982003262U+91 9920032523 E.mail:gmarch.pg@gmail.com, gmarch,mumbai@gmail.com, Website: www.gmarch.in, www.gmarchgroup.com Table A Sr, No Tasly'Activity Percentage of Work Done (As of the date of the Certificate (1) (2) (3) 1 Excavation 100 yo 2. Number of Basement N.A 3 Number of Plinth 100y" 4. Number of Podium N.A 5 Stilt Floor N.A 6 Slabs of Su Structure u 76 Floor + terrace slab 100 yo 7 a. Internal walls - Ground to lst Floor 70 yo Internal walls - 2nd to 6th Floor 100% b. Internal Plaster - 2nd & 6th Floor 100 % c. External Plaster - Ground to 7th Floor 80% d. Floorings upto - 2nd to 6th Floor 60to e. Doors (4 flats completed) within FlaVpremises 157o e. Windows within FlaVPremises NIL 8 Sanitary Fittings within the FlaVpremises. Not Done 9 Staircases, Lifts Wells, and Lobbies upto 7t Floor + terrace 100o/o slab (only RCC work completed) and Un round Water tanks. onl RCC work com '10. The external plumbing and 50% external plaster 80 7o Completion of terraces with waterproofing of the NIL Buildin rn Elevation 11. Installation of lifu, NIL Water pumps, NIL Fire Fighting Fittings and Equipment as per CFO NOC, 20Yo Electrical fittings, 30Y" Mechanical equipment NIL Compliance to conditions of environment /CRZ NOC, NIL finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall protection and all other requirements as may be required to complete the project as per specification in the agreement of sale. A other activities. MUMBAI Date - 3l-12-2024 TABLE.B Common Area (Internal and External Development Works) in respect of the ect Number Percentaee of Wor( Sr. Common areas and Proposed Done Details No Facilities, Amenities (Yey'No) (As on the date of the Certified) (1) (2) (3) (4) (s) 1 Internal Roads & Footpaths No 0 NIL 2 Water Supply Yes 0 As per Approved Plan Sewerage (chamber, Lines, 3 Yes 0 As per Approved Plan Septic Tank, STP) 4 Storm Water Drains No 0 NIL l-andraping & Tree 5 Yes 0 NA Planting 6 Street Lighting No 0 NIL 7. Community Buildings No 0 NA Treatment and disposal of 8. No 0 NA sewage and sullage water. Solid Waste Management & 9 No 0 NA Disposal Water Conversation & Rain 10. Yes 0 NIL Water Harvesting 11. Energy Management No 0 NA -t2. Fire Protection and fire Yes 0 As per Norms safety requirements Electrical meter room, sub- 13. Yes 0 As per Approved Plan station, receiving station. Aggregate area of 14. Yes 0 NA recreational Open Space 15. Open Parking No 0 NA Yours Faithfully, IV/s.G.M. Arch PvL L MUMBAI (P. G. Redekar) (License No - !/ra$[S) Agreed ad Accepted by: Signature of Promoter Name: Date: