G.M.ARCH Pvr. trD. ARCHITECTS, ENGINEERS, PROJECT MANAGEMENT CONSULTANTS SURVEYORS, INTERIOR DESIGNERS & VALUERS ffz BSiIlt [0: Z7AABCG'64D1Z0 I Oil ilo: t 452mffiHXl0PICt28679 FORM 1 [See Regulation 3] ARCHITECT"S CERTIFICATE Date:- 30h September, 2024 To, I\4/s. Infinity Narayani Associates 43, Sunvilla, YashodharrL Gen. A.K.VADYA Marg, Goregaon (East), Mumbai:400053. subr Certilicate of Percentage of Completion of construction work of Gateway Residence having MahaRERA Registration Number: P518m052907 {Only Applicable After project Register being developed by the IUls. Infinitv Naravani Associates. Dear Sir, We M/s. G. M. Arch Pvt. Ltd. have undertaken assignment as Architect of certilying Percentage of Completion of Construction work of Gateway Residence having MahaRERA Regishation Number: P518m052907 {only Applicable After Project Register being developed by the M/s. Infinitv Naravani Associates. 1. Following technical professionals are appointed by Owner / Promoter:- (i) M/s. G. M. Arch Pvt. Ltd. as Architect/ Licensed Suweyor. (ii) lay Shree Krishna as Structural Consultant (iii) Shri Kishor Velani as Site Engineer. Based on Site lnspectioo with respect to layout of the Building of the aforesaid Real Estate Proiec! I certify that as on the date of this certificate, the Percentage of work done for the Building of the real Estate Project as registered vide number P51800052907 under RERA is as per table A herin below. The percentage of the work executed with respect to each if the rrajor activity of the Building and overall percentage of work done with respect to Building is detailed in the in the Table B. D. a & Head Offi Mezzanine Floor, P. T Ma.g, K. K. chambers. Fort, Mumbai City - 4Oo 001, Maharashtra ffice Address: 3, Mercury CHS, Opp Hall Mark Business Plaza, Bandra (E), Mumbai.4oo051. cell.: +91 98200326231+97992N12623 E-mail: gmarch.gsr@smail.com. smarch.mumbai@smail.com. smarch@rediffmail.com, info@Emarch.in Website: www.gmarch.in Date - 3OlO9l2O24 Table A Sr. Tasly'Activity Percentage No of Work Done (As of the date of the Certificate) (1) (2) (3) 1 Excavation 100 yo 2. Number of Basement(s) N.A. 3 Number of Plinth 100o/o 4 Number of Podium N.A 5. Stilt Floor N.A 6 Slabs of Super Structure u pto 9th Floor 100 0/o a. Internal walls - 2d to 6s Floor 100 yo b. Internal Plaster - 2nd & 3rd Floor 100 yo 7 c. Floorings 25o/o d. Doors and Windows within Flat/Premises NIL 8 Sanitary Fittings within the FlatlPremises. Not Done Staircases, Lifts Wellg and Lobbies upto gth Floor level and 9 100o/o Underground Water tanks. The external plumbing and external plaster, elevation, 10. completion of terraces with waterproofing of the Not Done BuildingTltring. Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, Compliance to conditions of environment /CRZ NOC, finishing to entrance lobby/s, plinth protection, 11. Not Done paving of areas appurtenant to Building/Wing, Compound Wall protection and all other requirements as may be required to complete the project as per specification in the agreement olsale. Any other activities. Date-fi4}UJ|4 TABLE-B Common Area (Intemal and External DeveloPment Worksl in resoect of the Registered Phase/Proi ect Number Percentage of Work Done Sr. Common areas and Facilities, Proposed Details (As on the No Amenities (Yes/No) date of the Certified) (1) (2) (3) (4) (s) "l tntemal Roads & Footpaths No 0 N.A. 2. Water Supply Yes 0 As per Approved Plan Sewerage (chamber, Lines, As per Approved Plan J- Yes 0 Septic Tank, STP) 4. itorm Water Drains Yes 0 As per Approved Plan 5 Landscaping & Tree Planting Yes 0 NA 6. itreet Lighting No 0 NA 7. Community Buildings No 0 NA Ireaknent and disposal of No 0 NA 8. sewage and sullage water. Solid Waste Management & I No 0 NA Disposal Water Conversation & Itain 10. Yes 0 As per Approved Plan Water Harvesting 11. Energy Management No 0 NA Fire Protection and fue safety 12. Yes 0 As per Norms requirements Electrical meter room, suh 13. Yes 0 As per Approved Plan JtatiorL receiving station. Aggregate area of recreational L4 Yes 0 NA Open Space 15 Open Parking No 0 NA Yours Faithfully, I\4/s. G. M. Arch t, 4 o 2 ) (P. G. Redekar) o 2 picense No - ^ Agreed ad Accepted by: Signature of Promoter Name: Date: